Council archive · source document
SUPERSEDED Negotiated Decision Notice OPW25 0042 (As Published) · OPW25/0042
A6769-24-D02 A RIP & RIC DETAILS 27 February
2025
Prepared by ALTA
A6769-24-D03 B DRAINAGE CROSS SECTIONS – 12 March
SHEET 1 2025
Prepared by ALTA
A6769-24-D04 A DRAINAGE CROSS SECTIONS – 27 February
SHEET 2 2025
Prepared by ALTA
A6769-24-D05 A DRAINAGE CROSS SECTIONS – 27 February
SHEET 3 2025
Prepared by ALTA
A6769-24-D06 A DRAINAGE CROSS SECTIONS – 27 February
SHEET 4 2025
Prepared by ALTA
A6769-24-D07 A DRAINAGE LONG SECTION 27 February
2025
Prepared by ALTA
A6769-24-D08 A RAPID INFILTRATION DEVICE SITE 27 February
LAYOUT & CATCHMENT PLAN 2025
Prepared by ALTA
A6769-24-D09 A RAPID INFILTRATION CULVERT ‘RIC’ 27 February
LAYOUT 2025
Prepared by ALTA
A6769-24-D10 A RAPID INFILTRATION CULVERT ‘RIC’ 27 February
SECTION 2025
Prepared by ALTA
A6769-24-WQ01 A WATER QUALITY LAYOUT 27 February
2025
Prepared by ALTA
A6769-24-WQ02 A WATER QUALITY DETAILS 27 February
2025
Prepared by ALTA
A6769-24-CA01 A EXTERNAL CATCHMENT LAYOUT 27 February
2025
Prepared by ALTA
A6779/25/SWMP OpW(A) STORMWATER MANAGEMENT PLAN – Feb 2025
Operational Works
Prepared by ALTA
Page 3 of 16
Document Set ID: 24143123
Version: 4, Version Date: 26/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Negotiated Decision Notice OPW25 0042 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 202 KB (small file)
- File type
No other editions are linked here.