                                                             SITE BASED STORMWATER
                                                                   MANAGEMENT PLAN
                                                                  RESIDENTIAL DEVELOPMENT AT
                                                                             43 ELANDA STREET
                                                                              SUNSHINE BEACH



                                                                                                         Prepared for
                                                                                                    Altum Constructions

                                                                                             Attention: Rob McCready

                                                                                         Document Reference
                                                                                                         15104 - SBSMP/0

Record of Issue:

 Issue        Status            Author          Date           Checked            Date          Authorised        Date
                                Aaron          20 April      Christopher         3 May        Henry Morgan        4 May
   0      For Approval
                                Woods           2016           Godwin            2016          RPEQ 11950         2016


This investigation and report has been authorised by Mr Henry Morgan, a Director of Morgan
Consulting Engineers Pty Ltd.




Henry J Morgan          RPEQ 11950                                          Wednesday, 4 May 2016




D:\JOBS\15-Jobs\15104 - 43 Elanda Street, Sunshine Beach\Civil\Reports\SBSMP\Working\15104 - SBSMP.doc
Full text of the other 69 pages

Page 2

                                                                                              15104 - SBSMP/0
                                                                                                           Page 2




                                          Table of Contents
1   INTRODUCTION ............................................................................................ 3
2   EXISTING SITE CONDITIONS .............................................................................. 4
  2.1   The Site ............................................................................................... 4
  2.2   Surrounding Area .................................................................................... 4
3 PROPOSED DEVELOPMENT ............................................................................... 5
4 EXISTING STORMWATER DRAINAGE SYSTEM........................................................... 6
  4.1   Existing Infrastructure .............................................................................. 6
  4.2   Existing Drainage Patterns ......................................................................... 7
  4.3   Legal Point of Discharge ........................................................................... 7
5 STORMWATER QUANTITY ................................................................................ 8
  5.1   Proposed Drainage Patterns ....................................................................... 8
  5.2   Rational Method Calculations ..................................................................... 8
  5.3   XP-RAFTS Detention Analysis ..................................................................... 10
  5.4   Comparison of Peak Flows at Legal Point of Discharge ...................................... 15
6 STORMWATER QUALITY ................................................................................. 17
  6.1   Construction Phase................................................................................. 17
  6.2   Operational Phase .................................................................................. 19
7 CONCLUSION .............................................................................................. 21
Appendix A     EXISTING SITE SURVEY ..................................................................... 22
Appendix B     DEVELOPMENT PLANS ...................................................................... 23
Appendix C     DBYD DATA .................................................................................. 24
Appendix D     RATIONAL METHOD CALCULATIONS ..................................................... 25
Appendix E     XP-RAFTS PRE DEVELOPMENT MODEL RESULTS ........................................ 26
Appendix F     XP-RAFTS POST DEVELOPMENT UNMITIGATED MODEL RESULTS ..................... 27
Appendix G     PRECAST DETENTION TANK DETAILS .................................................... 28
Appendix H     DETAILED CIVIL ENGINEERING PLANS ................................................... 29
Appendix I     XP-RAFTS POST DEVELOPMENT MITIGATED MODEL MINOR STORM RESULTS ...... 30
Appendix J     XP-RAFTS POST DEVELOPMENT MITIGATED MODEL MAJOR STORM RESULTS ...... 31
Appendix K     HYDRAULIC ENGINEERING PLANS ........................................................ 32




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 3

                                                                              15104 - SBSMP/0
                                                                                         Page 3




1 INTRODUCTION
This Site Based Stormwater Management Plan (SBSMP) has been prepared for the Residential
Development at 43 Elanda Street, Sunshine Beach.

This SBSMP has been prepared to investigate the effects the development will have on
stormwater quantity and quality.

The objective of this SBSMP is to ensure that there is no adverse impact by the development on
the environmental value of the receiving waters during the construction and operational phases
of the development. This SBSMP will also provide recommendations to ensure that the post
development peak outflow conditions are not greater than the pre development peak outflow
conditions.

In order to achieve this objective, this SBSMP:

    1. Describes the environmental setting of the development site and precinct;
    2. Describes the nature of the proposed development as it relates to stormwater quality;
    3. Calculates the peak flows for both pre and post development conditions;
    4. Calculates the detention volume required to achieve the pre development outflow in
       the post development state;
    5. Identifies potential sources of contaminants and describes the management techniques
       designed to be employed on the site to achieve the water quality objectives; and


The proposed development has been assessed against the following guidelines and planning
documents:

    1. State Planning Policy 2013 (SPP 2013) – Guidelines for Healthy Waterways;
    2. Urban Stormwater Quality Planning Guidelines 2010;
    3. The Queensland Urban Drainage Manual (QUDM); and
    4. Noosa Shire Council (NSC) Planning Scheme Policy.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 4

                                                                                15104 - SBSMP/0
                                                                                            Page 4




2 EXISTING SITE CONDITIONS

2.1 The Site
The site, described as Lot 1 on SP230070 has an approximate area of 1,468m2 (or 0.147ha) in
area and is zoned as Medium Density Residential. The site is currently vacant and covered in
long grass. The site has a grade of approximately 15.6% and slopes from the south west
boundary to the north east boundary.

Refer to Figure 2.1 for a locality plan and Appendix A for the detailed site survey plan.




             N




                          The Site




                                         Figure 2.1 – Locality Plan

2.2 Surrounding Area
The site is located within the limits of the Noosa Shire Council. The area surrounding the site is
classified as low-medium density urban residential according to the Noosa Planning Scheme
Policies.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 5

                                                                               15104 - SBSMP/0
                                                                                         Page 5




3 PROPOSED DEVELOPMENT
The proposed development will involve the construction of a high density residential
development, which will include:

    1. A four storey apartment building containing 7 units in total;
    2. An underground basement for vehicular manoeuvring and parking;
    3. Access to Elanda Street via a single driveway crossover; and
    4. Dedicated landscaping throughout the site.


Refer to Figure 3.1 for an elevation of the proposed development and Appendix B for the
development plans.




                          Figure 3.1 – Elevation of the Proposed Development




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 6

                                                                                    15104 - SBSMP/0
                                                                                              Page 6




4 EXISTING STORMWATER DRAINAGE SYSTEM

4.1 Existing Infrastructure
Data obtained from Dial Before you Dig (DBYD) and the detailed survey plan indicates the
following existing drainage infrastructure:

    1. Catchment pit, manhole and stormwater pipe located approximately 60m south east of
       the site.
Refer to Figure 4.1 for an existing stormwater drainage schematic, Appendix A for the detailed
survey and Appendix C DBYD data.




                      N




                                                              The Site




                                                               Stormwater Manhole


                    Legend
                    Flow Path:


                              Figure 4.1 – Stormwater Drainage Schematic




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 7

                                                                                15104 - SBSMP/0
                                                                                           Page 7




4.2 Existing Drainage Patterns
As the existing site falls away from Elanda Street surface runoff currently sheet flows towards
the rear boundary of the site and into the neighbouring lot to the north east. There is no
existing drainage infrastructure located at the rear boundary of the site collecting this surface
runoff.

There are no external catchments contributing to runoff through the site.


4.3 Legal Point of Discharge
If the proposed development maintains pre development flow conditions then the rear
boundary of the site is considered the legal point of discharge. As there is no existing drainage
infrastructure located at the rear boundary of the site runoff from the proposed development
can only be discharged to the ground to mimic the existing drainage patterns.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 8

                                                                                15104 - SBSMP/0
                                                                                          Page 8




5 STORMWATER QUANTITY
A roof and allotment drainage system is to be designed to comply with:
    1. AS/NZS 3500.3:2003 - Plumbing and Drainage Part 3: Stormwater Drainage;
    2. The Queensland Urban Drainage Manual (QUDM), and;
    3. Noosa Shire Council’s Planning Scheme Policies.


5.1 Proposed Drainage Patterns
The proposed drainage patterns are as follows:

Roof Catchment:

    1. Runoff from the roof catchment will flow via downpipes to an internal drainage
       network.
    2. The internal drainage network will then convey stormwater runoff to the end of line
       stormwater detention tank.
Ground Catchment:

    1. Surface runoff from the landscaping and pavement areas will be collected by field inlets
       connected to the internal drainage network.
    2. The internal drainage network will then convey stormwater runoff to the end of line
       stormwater detention tank.

Stormwater will then discharge from the tank at pre-development flow rates to surcharge pits
located within a swale drain at the rear boundary of the site. Overflow from the detention tank
will discharge (at pre-development flow rates) directly to the swale drain.

Once the surcharge pits and swale drain begin to overtop stormwater will then sheet flow
across the rear boundary of the site as per the existing drainage pattern at pre development
flow rates.


5.2 Rational Method Calculations
5.2.1 Design Storms
The following design storms have been adopted for the development in accordance with Section
7.3 of the QUDM and Noosa Shire Council’s Planning Scheme Policy (PSP06 – Section 4):

    1. Minor Drainage System: 10 year ARI statistical flood (Q10 storm), and;
    2. Major Drainage System: 100 year ARI statistical flood (Q100 storm).




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 9

                                                                                              15104 - SBSMP/0
                                                                                                        Page 9




5.2.2 Rainfall Intensity
Rainfall intensities for this study were obtained from the Bureau of Meteorology.

5.2.3 Times of Concentration
Times of concentration (tc) were calculated as defined in Section 4.6 of the QUDM. Refer to
Appendix D for the adopted tc’s and Appendix D for tc calculations.

                                      Table 5.1 - Adopted tc values
                                   Pre Development        Post Development
                                       tc (mins)               tc (mins)

                                          10.1                     5.0


5.2.4 Runoff Coefficients
The 10 year runoff coefficient’s (C10) were determined as defined in Section 4.5 of the QUDM.
Refer to Appendix D below for the adopted C10 values.

                                      Table 5.2 – Adopted C10 Values
                                                                 Fraction
                                Property State                impervious (fi)       C10

                              Pre development                      0.00             0.67
                              Post development                     0.65             0.82


5.2.5 Peak Flows
Refer to Table 5.3 for a summary of the predicted minor and major discharge rates for pre and
post development conditions and Appendix D for the Rational Method calculations.

                                Table 5.3 – Pre and Post-Development Peak Flows

                             Property State               Q10 (m3/s)            Q100 (m3/s)

                           Pre development                    0.044               0.077
                           Post development                   0.069               0.121


It is evident that there will be an increase between the pre development and post development
peak discharge flow rates. Therefore onsite stormwater detention will be required to mitigate
the increased discharge flow rates to ensure pre development flow rates can be achieved.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 10

                                                                                         15104 - SBSMP/0
                                                                                                  Page 10




5.3 XP-RAFTS Detention Analysis
XP-RAFTS has been used to model the peak discharges from the site under both existing (pre
development) and proposed (post development) conditions, and to determine the sizing
requirements of the detention basin as outlined in Section 5 of the QUDM.

5.3.1 Pre Development
Figure 5.1 shows the XP-RAFTS model used to represent the pre development site conditions
and Table 5.4 summarises the input parameters used in the model for the pre developed site
scenario.




                             Figure 5.1 - XP-RAFTS Pre Development Model

                  Table 5.4 - XP-RAFTS Source Node Parameters – Pre Development
                                                              Pre Development
                                                                 Pre-D Site
                              Parameter
                                                    Sub Catchment 1 Sub Catchment 2
                                                       (Pervious)         (Impervious)
                          Initial Loss (mm)                10                 N/A
                      Continuous Loss (mm/hr)              2.5                N/A
                        Catchment Area (ha)              0.147                N/A
                       Impervious Percentage               0%                 N/A
                            Vectored Slope               16.8%                N/A
                             Manning's "n"               0.045                N/A
                           IFD Coefficients          Sunshine Beach           N/A
                         Storage Coefficient              N/A                 N/A


Table 5.5 summaries the pre development peak flows calculated by XP-RAFTS for a range of
design storms. For reference, the peak flows calculated using the Rational Method have also
been provided in Table 5.5.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 11

                                                                                          15104 - SBSMP/0
                                                                                                     Page 11




           Table 5.5 – Pre Development Peak Discharge (XP-RAFTS and Rational Method)

                                        XP-RAFTS                          RATIONAL METHOD
             ARI
                             Pre Development Peak Discharge         Pre Development Peak Discharge
           (years)
                                         (m3/s)                                 (m3/s)
                                            0.042
              1                                                                  0.020
                                      (1yr 25min storm)
                                            0.060
              2                                                                  0.027
                                      (2yr 25min storm)
                                            0.079
              5                                                                  0.037
                                      (5yr 25min storm)
                                            0.089
              10                                                                 0.044
                                     (10yr 25min storm)
                                            0.102
              20                                                                 0.052
                                     (20yr 25min storm)
                                            0.107
              50                                                                 0.067
                                     (50yr 15min storm)
                                            0.120
             100                                                                 0.077
                                    (100yr 15min storm)


For pre development peak flow rate hydrographs from XP-RAFTS refer to Appendix E.

5.3.2 Post Development Unmitigated
Figure 5.2 shows the XP-RAFTS model used to represent the post development unmitigated site
conditions and Table 5.6 summarises the input parameters used in the model for the post
development unmitigated site scenario.




                     Figure 5.2 - XP-RAFTS Post Development Unmitigated Model

          Table 5.6 – XP-RAFTS Source Node Parameters – Post Development Unmitigated
                                                              Post Development
                                                                 Post-D Unm
                              Parameter
                                                    Sub Catchment 1 Sub Catchment 2
                                                       (Pervious)         (Impervious)
                          Initial Loss (mm)                 0                   0
                      Continuous Loss (mm/hr)              2.5                  0
                        Catchment Area (ha)              0.051               0.096
                       Impervious Percentage               0%                 100%
                            Vectored Slope                10%                  5%
                             Manning's "n"                0.03               0.015
                           IFD Coefficients          Sunshine Beach      Sunshine Beach
                         Storage Coefficient              N/A                 N/A




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 12

                                                                                  15104 - SBSMP/0
                                                                                            Page 12




Table 5.7 summaries the post development unmitigated peak flows calculated by XP-RAFTS for
a range of design storms. For reference, the peak flows calculated using the Rational Method
have also been provided in Table 5.7.

          Table 5.7 – Post Development Peak Discharge (XP-RAFTS and Rational Method)
                                        XP-RAFTS                     RATIONAL METHOD
             ARI            Post Development Peak Discharge   Post Development Peak Discharge
           (years)                    (Unmitigated)                    (Unmitigated)
                                          (m3/s)                          (m3/s)
                                          0.052
              1                                                           0.032
                                    (1yr 25min storm)
                                          0.066
              2                                                           0.043
                                    (2yr 25min storm)
                                          0.082
              5                                                           0.059
                                    (5yr 25min storm)
                                          0.091
              10                                                          0.069
                                   (10yr 25min storm)
                                          0.104
              20                                                          0.083
                                   (20yr 25min storm)
                                          0.111
              50                                                          0.105
                                   (50yr 20min storm)
                                          0.122
             100                                                          0.121
                                  (100yr 20min storm)


As seen in Table 5.5 and Table 5.7 there will be an increase in peak flows from pre to post
development conditions as a result of the proposed development. Consequently on-site
detention will be required.

For XP-RAFTS post development unmitigated peak flow rate hydrographs refer to Appendix F.

It is noted that the percentage increase in peak flows for the Rational Method are in the order
of 36% and for the Laurenson Method (used in XP-RAFTS) 2%-19% for minor storms and 2%-4% for
major storms. This difference can be explained by the fact that XP-RAFTS is a non-linear
routing hydrologic model which calculates flood hydrographs from storm rainfall hyetographs.
The Laurenson Method also specifically accounts for slope and other parameters while allowing
for storage within the catchment. The Rational Method combines parameters into one runoff
coefficient used to calculate the peak flows and does not provide for specific parameters (e.g.
slope, manning’s “n” etc).

5.3.3 Post Development Mitigated
Stormwater detention will need to be provided to ensure the pre development peak flows listed
in Table 5.5 are not exceeded for the proposed development. The detention storage is to be
implemented as part of the internal stormwater drainage network. The legal point of discharge
described in Section 4.3 will remain.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 13

                                                                                     15104 - SBSMP/0
                                                                                                Page 13




Figure 5.3 shows the XP-RAFTS model used to represent the post development mitigated site
scenario for the proposed development. Node “Post-D Mit” represents the area of the proposed
development (all roof and surface areas) discharging to the detention tank, “Post-D Unm”
represents the area of the proposed development not discharging to the detention tank and
“LPD” represents the legal point of discharge. Mitigation has been implemented in the form of
a detention tank at the node labelled “Tank” in the XP-RAFTS model.




                       Figure 5.3 - XP-RAFTS Post Development Mitigated Model

As the roofwater/internal drainage network has been designed to convey stormwater up to the
Q20 storm event, a bypass link has been included in the XP-RAFTS model to divert all flows
exceeding the roofwater drainage capacity to the legal point of discharge as this runoff cannot
be captured and detained in the detention tank. The bypass link diverts discharge greater than
the post development Q20 peak flow rate of 0.088m3/s from node “Post-D” to node “LPD”. The
bypass link is labelled “Diver1” in the XP-RAFTS model.

Table 5.8 summarises the input parameters used in the model for the post developed mitigated
site scenario. No source node parameters were used for the “Tank” node and the “LPD” node.

           Table 5.8 – XP-RAFTS Source Node Parameters – Post Development Mitigated
                                                       Post Development Mitigated
                                            Post-D Mit                           Post-D Unm
         Parameter
                               Sub Catchment 1 Sub Catchment 2 Sub Catchment 1 Sub Catchment 2
                                  (Pervious)        (Impervious)        (Pervious)        (Impervious)
     Initial Loss (mm)                 0                   0                 0                N/A
 Continuous Loss (mm/hr)              2.5                  0                2.5               N/A
   Catchment Area (ha)              0.028               0.096             0.023               N/A
  Impervious Percentage               0%                 100%               0%                N/A
       Vectored Slope                 5%                  5%               15%                N/A
        Manning's "n"                0.03               0.015              0.03               N/A
      IFD Coefficients          Sunshine Beach     Sunshine Beach    Sunshine Beach           N/A
    Storage Coefficient              N/A                 N/A               N/A                N/A




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 14

                                                                            15104 - SBSMP/0
                                                                                      Page 14




5.3.4 On-Site Detention
In order for the post development stormwater discharge conditions to match pre development
conditions for all storm events, it is proposed to provide a total of 22.59m3 of stormwater
storage via a semi-submerge 23,000L (or 23m3) pre-cast concrete detention tank from All Cast
Pre Cast. This detention tank system will over mitigate captured post development flows from
the development to ensure the combined post development discharge from the site does not
exceed pre development flows. It is proposed to locate the detention tank at the southern
corner of the site under the raised deck area. The proposed detention tank will have the
following features:

       Tank external diameter = 3.48m;
       Tank internal diameter = 3.37m
       Tank Overall height = 2.8m;
       Tank internal height = 2.6m;
       Tank capacity = 23.19m3
       A 140mm diameter orifice place over a 150mm diameter outlet pipe located at the base
        of the tank in order to discharge minor flow (at pre development flow rates) to a
        surcharge pits before discharging to the legal point of discharge (LPD);
       A 225mm diameter high flow pipe located 2.3m above the base of the tank in order to
        discharge overflow (at pre development flow rates) to the proposed swale drain before
        discharging to the LPD.

Refer to Appendix G for the typical pre-cast tank details from All Cast Pre-Cast and Appendix
H for the detailed civil engineering plans.

5.3.5 Detention Basin Analysis
Table 5.9 provides a summary of the detention tank results in the XP-RAFTS model for the post
development mitigated site scenario. The results show detention outflow (Tank Outflow), the
storage depth within the tank (Tank Stage) and detention volume reached (Tank Storage) to
ensure that pre development flow conditions are achieved for all storms.

Refer to Appendix I and Appendix J for the XP-RAFTS post development mitigated minor and
major storm detention tank model results summarised in Table 5.9.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 15

                                                                                                  15104 - SBSMP/0
                                                                                                           Page 15




                  Table 5.9 – XP-RAFTS Post Development Detention Basin Summary
                                      Post Development Mitigated (Detention Tank)
                 ARI
               (years)         Tank Outflow           Tank Stage            Tank Storage1
                                   (m3/s)                 (m)                     (m3)
                                   0.033                 0.910                   8.123
                  1
                             (1yr 25min storm)     (1yr 25min storm)      (1yr 25min storm)
                                   0.039                 1.335                  11.912
                  2
                             (2yr 25min storm)     (2yr 25min storm)      (2yr 25min storm)
                                   0.046                 1.844                  16.453
                  5
                             (5yr 25min storm)     (5yr 25min storm)      (5yr 25min storm)
                                   0.050                 2.152                  19.192
                  10
                            (10yr 25min storm)    (10yr 25min storm)     (10yr 25min storm)
                                   0.073                 2.442                  21.787
                  20
                            (20yr 25min storm)    (20yr 25min storm)     (20yr 25min storm)
                                   0.084                 2.505                  22.345
                  50
                            (50yr 25min storm)    (50yr 25min storm)     (50yr 25min storm)
                                   0.084                 2.533                  22.590
                 100
                           (100yr 60min storm) (100yr 60min storm) (100yr 60min storm)
    Notes:
        1.   Additional detention volume will be achieved in the stormwater pipes.
        2.   All runoff from roof and surface areas of the proposed development is being directed to and detained
             within the detention tank.


5.4 Comparison of Peak Flows at Legal Point of Discharge
Table 5.10 below provides a comparison of the pre development and post development
(mitigated) peak flows at the legal point of discharge (LPD) for the proposed development.

                            Table 5.10 – Comparison of Peak Flows at the LPD
                                                      XP-RAFTS
                                  XP-RAFTS                                           Difference
                   ARI                          Post Developed Flows
                            Pre Developed Flows
                 (years)                          at LPD (Mitigated)
                                    (m3/s)                                     (m3/s)         %
                                                        (m3/s)
                                    0.042               0.040
                       1                                                       -0.002        -4.8
                              (1yr 25min storm)   (1yr 25min storm)
                                    0.060               0.049
                       2                                                       -0.011       -18.3
                              (2yr 25min storm)   (2yr 25min storm)
                                    0.079               0.058
                       5                                                       -0.021       -26.6
                              (5yr 25min storm)   (5yr 25min storm)
                                    0.089               0.063
                      10                                                       -0.026       -29.2
                             (10yr 25min storm)  (10yr 25min storm)
                                    0.102               0.089
                      20                                                       -0.013       -12.8
                             (20yr 25min storm)  (20yr 25min storm)
                                    0.107               0.102
                      50                                                       -0.004        -4.7
                             (50yr 15min storm)  (50yr 25min storm)
                                    0.120               0.115
                   100                                                         -0.005        -4.2
                            (100yr 15min storm) (100yr 25min storm)
    Notes:
        1.   Additional detention volume will be achieved in the stormwater pipes.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 16

                                                                             15104 - SBSMP/0
                                                                                        Page 16




The XP-RAFTS hydraulic modelling has demonstrated that the proposed mitigation implemented
will maintain pre development flows (or less) for all design storms at the LPD. Refer to
Appendix I and Appendix J for the XP-RAFTS post development mitigated minor and major
storm peak flows at the LPD, as summarised in Table 5.10 above.

Refer to Appendix H for the detailed civil engineering plans of the proposed development.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 17

                                                                             15104 - SBSMP/0
                                                                                       Page 17




6 STORMWATER QUALITY
The following section of this report will outline the potential contaminants and proposed
solutions to be incorporated during the construction and operation of this development.


6.1 Construction Phase
Sediment generated during the construction phase shall be dealt with in accordance with the
Erosion and Sediment Control Plan prepared by Morgan Consulting Engineers and kept on site
during the construction phase. Refer to Appendix H for the Erosion and Sediment Control plan.

Potential sources of contaminants identified for the construction phase of the development are
outlined in Table 6.1 together with proposed stormwater quality improvement devices,
management and maintenance procedures.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 18

                                                                                           15104 - SBSMP/0
                                                                                                       Page 18




                      Table 6.1 - Potential Contaminants and Proposed Treatments

                                                                                Proposed Treatment
                                                     Management /
       Pollutant         Potential Source                                      Device and Maintenance
                                                 Maintenance Procedures
                                                                                      Procedure
      Sediment &        Excavated material,     Provision of sediment and       Sand filled filter socks.
        Eroded              fill material,       silt barriers to the site        Removal of excess
       material           exposed ground,        drainage entry and exit         sand/silt build up at
                            Stockpiles of                 points.             regular intervals and after
                              material.                                              every storm.
          Dust             Stockpiles of         Covering the material or     Coverage of material with
                         material, exposed      wetting it down at regular    plastic, geotextile, surface
                             ground.                    intervals.             binding agents or regular
                                                                                        watering.
         Litter         Refuse generated by      Construction waste is to        Industrial bin is to be
                               staff.             be cleaned off the site         provided within the
                                                area and installed into an     construction area - to be
                                                    industrial bin then          emptied on at least a
                                                   removed by a refuse               weekly basis.
                                                  collection contractor.
       Concrete         Washing of concrete     Provision of a closed area    Liquids to be removed by a
                          trucks/tools to       onsite for washing off of          waste collection
                        remove wet/unused           concrete slurries.          contractor. Solids to be
                             concrete.                                         placed into a refuse bin.
       Surfactants        Washing down           No cleaning of vehicles       Monitoring & prevention
      (detergents)        operations on         will be permitted on site.
                       hardstand area using
                           detergents.
       Chemical         Typically this may        Where spills occur, the      A temporary containment
        (Paints,       occur due to spillage      containment area is to           area. This is to be
     thinners etc.)        of product.          stop escape. The material     impermeable and of a size
                                                    is to be treated (as      to permit mixing/transfer,
                                                  required) and removed       and with a storage volume
                                                and cleaned by a licensed         of twice the largest
                                                         contractor.                 container used.
                                                Minor spillage outside this     Treatment of spills is to
                                                 area shall be cleaned up           occur on site. No
                                                 with cloths and disposed     discharge of treated water
                                                    of to waste via the        to the stormwater system
                                                       industrial bin.        is to occur without council
                                                                               approval. Incidents are to
                                                                                be reported to the EPA.
      Wastewater         Spillage from the     A licensed contractor shall       No leakage is to be
                         relocation of the         remove any residue          permitted to enter the
                         existing sewerage     sewage from unused pipes       groundwater or discharge
                           reticulation.       and contaminated soils are        to the stormwater
                                                to be disposed of via the              system.
                                                      industrial bin.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 19

                                                                                         15104 - SBSMP/0
                                                                                                      Page 19




6.2 Operational Phase
The development has been assessed against the latest State Planning Policy 2014 (SPP 2014).
The proposed development will entail material change of use for urban purposes, which will
involve a land area less than 2,500m2. Consequently, State Planning Policy 2014 (SPP 2014) is
not triggered.

The proposed development works are considered 'Low Risk' with respect to pollutants generated
during the operational phase, therefore it is recommended that best management practices be
applied, in accordance with the NSC's water quality guidelines.

Pollutants that are likely to be generated by the development and their likely treatment
methods are listed in Table 6.2 below. The shaded pollutants are considered to be the key
pollutants and will be targeted for treatment.

        Table 6.2 - Potential Contaminants and Proposed Treatments - Operational phase
                                                 Residential    Acceptable Treatment Examples
                   Pollutant
                                                Development
                     Litter                          Yes       Bins, litter baskets, buffer strips and
                                                                                GPT’s
                   Sediment                          Yes       Swales, sedimentation basins, ponds
                                                                              and GPT’s
   Oxygen demanding substances (organic               No                         N/A
           and chemical matter)
            Nutrients (N and P)                    Possible       Rainwater tank first flush, bio-
                                                               retention basins, infiltration trench.
   Pathogens / Faecal coliforms (bacteria             No                       N/A
                and viruses)
    Hydrocarbons (including oil & grease)            Yes          Swales, bio-retention basins,
                                                                infiltration trench, oil and grease
                                                                       separators and GPT’s
     Heavy metals (often associated with              No                        N/A
                fine sediment)
      Surfactants (detergents from car             Possible                     N/A
                   washing)
   Organochlorines & organophosphates                 No                        N/A
   (pesticides, herbicides)
   Thermal pollution (heat)                           No                        N/A
   pH altering substances                             No                        N/A



Based on the above potential contaminants it is proposed to provide a roofwater drainage
system fitted with a ‘first flush’ devise to treat runoff from the roof area. The ‘first flush’
system is designed to capture a predefined volume of runoff (Q3 month) and divert it to
landscaping to provide primary and tertiary treatment. Flows which exceed the ‘first flush’
system will be diverted directly to the detention tank. Refer to the hydraulic consultants
drawings for details.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 20

                                                                               15104 - SBSMP/0
                                                                                        Page 20




The majority of the site is covered by roof catchment however the hardstand driveway
pavement along the south western boundary will be exposed therefore hydrocarbons are likely
to be generated. An Everhard V-Guard 600 Gross Pollutant Trap (GPT) has been specified in the
hardstand pavement area to pick up any litter, sediment and hydrocarbons within the
stormwater runoff.

Refer to Appendix K for the hydraulic consultant’s drawings for details of the GPT.

Refer to Appendix H for the detailed civil engineering plans.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 21

                                                                                15104 - SBSMP/0
                                                                                           Page 21




7 CONCLUSION
The Residential Development at 43 Elanda Street, Sunshine Beach has been assessed for its
impact on the quantity and quality of stormwater drainage.

As there is no existing drainage infrastructure located in close proximity of the site runoff from
the proposed development can only be discharged to the ground as existing. It has been
established that the rear boundary of the site is considered the legal point of discharge.

Mitigation of increased stormwater runoff from the proposed site is required in order for the
post development stormwater discharge conditions to match the pre development conditions.
With the aid of XP-RAFTS, as recommended in the QUDM, a detention volume requirement of
22.59m3 has been calculated in order to detain stormwater runoff from the proposed
development up to a Q100 storm event. This storage volume shall be provided within a 23,000L
semi-submerged pre-cast detention tank located at the southern corner of the development
under the raised deck. This report has demonstrated that the proposed mitigation measure
(detention volume of 22.59m3) will ensure pre development flow conditions are maintained.

Sediment generated during the construction phase shall be dealt with in accordance with the
Erosion and Sediment Control Plan to be maintained by Morgan Consulting Engineers and kept
on site during the construction phase.

As the development entails operational works for mixed use purposes, which does not involve a
land area greater than 2,500m2, the State Planning Policy 2014 (SPP 2014) is not triggered. The
proposed development works are considered 'Low Risk' with respect to pollutants generated
during the operational phase, therefore best management practices will be applied, in
accordance with the NSC's water quality guidelines.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 22

                                                              15104 - SBSMP/0
                                                                       Page 22




                                             APPENDIX A


                                     EXISTING SITE SURVEY




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 23

 

NOTES

(1) This plan was prepared for the purpose and exclusive use of
CP ALTUM CONSTRUCTIONS and their other professional advisers and
is not to be used for any other purpose or by any other person or

BUPI06878 corporation.
Roof Gutter RL 58./ JFP URBAN CONSULTANTS PTY LTD accepts no responsibility for

4 Storey Buildin any loss or damage arising to any person or corporation who may
Basement Level RL 46.3 (Approx) y 9 387 use or rely on this plan in contravention of these terms.

(2) The title boundaries shown on this plan were not marked at
1 Lower Level. RP48i2 the time of survey and have been determined from plan
Wo. ™~\ dimensions only and not by field survey.
Pe | wx

ub ee — = _ Sf \WH = (3) Services shown hereon have been located where possible by
55.67 ~*~ field survey. If not able to be so located, services have been
plotted from the records of the relevant authorities where

HOOP PINE 43°00'00” available and have been noted accordingly on this plan. However,
47.47 45.69 Wolf the information shown on these records pertinent to services
. L L a location is indicative only and sometimes inadequate.
ne 20

(4) Prior to any demolition, excavation or construction on the site,
the relevant authority should be contacted for possible location of
further underground services and detailed locations of all services.

 

Upper Level

 

   

Power pole
WAT 0.50808

4
x 49.94 x 43.90 i i

(5) Spot heights and contours are representative of the
topographical terrain at time of survey, 26/06/2015.

49.355 x 48.59 43.50

 

(7) Trees shown on this plan have been located only where the
trunk diameter at breast height (DBH) is 300mm or greater. Tree
types are estimated and tree sizes are approximate only. If
accurate identification of tree types is to be relied upon for any
purpose, then all trees shown will require on site verification by a

MANGO 0.30707 suitably qualified expert.
Xe,

151.86
50.03 x
g
3 | 49.27 x a (8) These notes form an integral part of this plan. If others use this
g 1 . 44.53 information, they should be advised of its purpose and limitations.
L g | Ney (9) This plan may not be reproduced unless these notes are
§ 1 H CP included.
|
Q 4 5029 | x49.91 SPAIOO/ BUP9546 Contour Interval: 0.5m
o
5154 xy x 49.18 x
%,
* 2 x 44.46
‘ x 50.52
. 49.51 n
x 49.90 x 4B.85
5h 96
Isiix xf\ 9796 * a
£15157 i \ Ss 43.24 Top Roof 52.8
la 95
451.58 \ suo \ 50.32 2
S
&
BR

7 52.01 Q

g

% 50.92
91 72

L

quay jo yo0g
w
2 yawnyigso abpz

9L10f
«00,00.E1F

o
v
ov

3
00,0682!

1g¢ 62

bts
%

—=

1
43) Wy 12104
JO2as WOM

SPp40294 UIOL
p.

SPp4s0I94 WOL
S|

 

 

x
50.16

| 5129 90.88 49.41

PROPERTY DESCRIPTION
LOT 1 on SP230070

PARISH of WEYBA

COUNTY of MARCH

TOTAL AREA 1468m? (Deed)

«49.86
%
50.67

 

BSE a5

223°00'00” 2538 20"

49.78

Lower Level
ShI74 ~\ Ei .
mtA..
SP230070

 

 

 

Power pole

 

 

FENCE

 

-/————/

 

wn ———————_ E ——__ OVERHEAD, UNDERGROUND ELECTRICITY

 

 

99.79 x 4 —_- S——————_ SEWER, SEWER MANHOLE
59. .
Upper Level %, «98.77 SMH

CP ———_1 ————___ TrIsTRA
Basement Level RL47.0 (Approx) BUPI02822

} 50.82

 

 

 

oe 6

 

WATER
7 Top Roof 60.0 5StoreyBuildng en BUILDING EAVES

CHANGE IN GRADE

rd TREE

Ye TYPE WATTLE, TRUNK DIAMETER 0.5m
HEIGHT 8metres
SPREAD 8metres

 

 

 

 

Eves Panes
SCALE: @ A3 1:250 PROJECT PLAN: ISSUE:
0 25 5

= | tts DETAIL SURVEY M2636 01 A

 

 

THIS SCALE SHOWN IS ORIGINAL DRAWING SCALE - (A3 SIZE) 1 F 1
mosey | Sep) od TSS HON SE Soa ALTUM CONSTRUCTIONS io

surveveD | mc | cHEcKED | one | MERE OM A 43 ELANDA STREET M2636-01A Detail. dwg
ORIGINAL ISSUE 29.06.2015 SCP
URBANC ONSULTANTS | SUNSHINE BEACH 29th lune 2015

DRAWN | scp | APPROVED | DNE | VERTION DATUM: DETAILS:
in CONSULTANTS PH HD, TH DOCUMENT MAY NOT BE COPED OR ANGMITTED ANY FORM OR BY AW MEANS IN PART OR W WHOLE WT TWRTTEN CONSENT OFF ORGAN CONSTANTS PTY

 

 

 

 

DATE:

 

 

 

 

 

 

 

 

 

PM44260_RL49.843 AHD ISSUE:

 

Page 24

                                                              15104 - SBSMP/0
                                                                       Page 23




                                             APPENDIX B


                                      DEVELOPMENT PLANS




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 25

STREET

  

 

if

 

 

6,000 SETBACK

9,200

S
x
I

ht

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELANDA

 

 

 

 

 

 

 

 

 

 

 

 

PROPOSED

APARTMENTS

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_ 223°00'

 

 

 

 

REAL PROPERTY DESCRIPTION

LOT 399 & 400 ON RP 48112
PARISH OF WEYBA
COUNTY OF MARCH

CONSTRUCTION NOTES

GENERAL ALL WORK TO COMPLY WITH BUILDING CODE OF AUSTRALIA (B..A)
ANIENDMENT 2015 AND ENSURE THAT LOCAL COUNCIL REQUIREMENTS.
ARE MET. THIS CONSTRUCTION BEING CLASS 2 AND 7.

MAINTENANCE PROVIDE A MAINTENANCE SAFETY ACCESS SYSTEM TO SAFELY
SAFETY MAINTAIN THE EXTERNAL FACADE AND ROOF. DESIGNED AND
INSTALLED IN ACCORDANCE WITH AS 4488 PARTS 1 & 2.

SITE VERIFICATION BEFORE COMMENCING CONSTRUCTION ALL DIMENSIONS, EXISTING
LEVELS, FINISHED LEVELS AND ALL SITE SERVICES ARE TO BE

VERIFIED.
ARCHITECTURAL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
ANY ASSOCIATED CONSULTANTS DRAWINGS.

FIRE PROTECTION - FIRE RATING TO COMPLY WITH PART C1 OF THE B.C.AFOR CLASS 2,
AND 7 OF CONSTRUCTION TYPE
SEPARATION OF OPENINGS TO COMPLY WITH PART C2 OF THEBOA
PROTECTION OF OPENINGS TO COMPLY WITH PART C3 OF THI
FIRE DOORSEY REQUIRED (AS NOTED "IRON ORAWINGS) SHALL
HAVE A MINIMUM EBL 60/20 WITH MINIMUM 1 HOUR RATED SELF
‘CLOSER AND LEVER HARD!
FIRE DOORSET REQUIRED (AS NOTED "2H ON DRAWINGS?) SHALL
HAVE AMINIMUM FRL -/120/30 WITH MINIMUM 1 HOUR RATED SELF
CLOSER AND LEVER HARDWARE.

FIRE RATINGS — EXTERNAL WALL MECHANICAL SHAFT 90/90
LOADBEARING 90/60/30

INTERNAL
LOADBEARING g0i90%0 © ROOF BEAMS. 90/6080

‘STAIR WALL 90/90/80

INTERNAL FLOOR BETWEEN
NON-LOADBEARING 18060 UNITS: 90/90/80

BASEMENT WALL FLOOR BETWEEN
LOADBEARING 120/120/120 UNITSAND BASEMENT 2402407240

LIFT SHAFT 90/90/90

STRUCTURAL REFER STRUCTURAL ENGINEERS DRAWINGS FOR FOOTINGS,
TIE DOWN, BRACING & FRAMING DETAILS

3,680 SETBACK >}

6

TIMBER ‘STORAGE & ERECTION STRICTLY IN ACCORDANCE WITH AS 1720
TIMBER STRUCTURES CODE & AS 1684 - TIMBER FRAMING CODE

TERMITE CONTROL TERMITE CONTROL TO BE INSTALLED TO MANUF. SPEC. AND TO
COMPLY WITH BCAB1.3())

CONTROL JOINTS GENERALLY WHERE FLUSH FINISH IS REQUIRED BETWEEN TWO.
BUILDING ELEMENTS, PROVIDE A V-TYPECONTROL JOINT PROVIDE
CONTROL JOINTS AT MAXIMUM 3 METRE CENTRES TO EXTERNAL
FILED AREAS SUCH AS BALCONIES. DRIVEWAYS. ENTRANCES ETC.
REFER TO STRUCTURAL ENGINEERS DRAWINGS FOR CONTROL JOINTS

6.705,

EXTERIOR F.C SHEETS FIXED STRICTLY IN ACCORDANCE WITH MANUFACTURERS
CLADDING WRITTEN SPECIFICATIONS,

EXTERNAL FIXINGS TO BE NON-COMBUSTIBLE AND CORROSION-RESISTANT
AND FITTINGS

INSULATION PROVIDE SISILATION BEHIND ALL EXTERNAL WALL CLADDINGS.
PROVIDE SARKING TO UNDERSIDE OF ROOF CLADDINGS.
en ee ALLINSULATION TO BE INSTALLED TO MANUFACTURERS SPEC
ROOF INSULATION PROVIDE BULK INSULATION OF R2.0 AND REFLECTIVE SARKING TO
OBTAIN MINIMUM VALUE OR 22

WALLINSULATION PROVIDE BULK INSULATION WITH R VALUE OF 1.5 REFLECTIVE
SARKING TO OBTAIN MINIMUM R VALUE OF 1.4

SOUND INSULATION AS NOTED ON PLANS.
Fw RATINGS TO COMPLY WITH PART 3.8.6 OF THEB.C.A,

‘winDows WINDOW FRAME AND GLAZING TO BE INSTALLED TO THE CORRECT
‘TERRAIN CATEGORY INCLUDING LOCAL PRESSURE FACTORS IN
ACCORDANCE WITH AS1288

5.270

SMOKE DETECTORS _ INSTALL SMOKE DETECTORS AND ALARM SYSTEM TO COUNCIL
REQUIREMENTS CONNECTED TO MAINS POWER AND INSTALLED IN
ACCORDANCE WITH AS 3 2.3 OF THE B.C.A, LOCATION
a SHOWN ON PLANS INDICATIVE ONLY. FINAL LOCATION TO BE
CONFIRMED BY SPECIALIST CONTRACTOR ON SITE

VENTILATION HABITABLE ROOMS WILL ACHIEVE DIRECT CFOSS FLOW OF AIG WITH
OPENINGS EQU ‘OF THE ROOM'S FLOOR AREA ROOMS ARE
ALSO PROvibED va Geiina Fans
ALL BATH \UNDRIES, ENSUITES NOT NATURALLY VENTILATED.
FOE MecHANIGALLY VENTILATED TO GOMPLY WITHIAS, 1968.2, AS
3666 & BCA F4.5

 

HANDRAILS HANDRAILING AND BALUSTRADING TO COMPLY WITH PARTS 02.16 AND
D2.17 OF THEB.C.A,

FIRE EXTINGUISHERS PROVIDE PORTABLE FIRE EXTINGUISHERS IN ACCORDANCE WITH PART
1.6 OF THE B.C.A LOCATED WHERE INDICATED ON DRAWINGS

STORMWATER, ALL ROOF & GROUND SURFACE RUNOFF TO BE CONNECTED TO

AS PER CIVILAND HYDRAULIC CONSULTANT DRAWINGS AND IN,
ACCORDANCE COUNCIL REQUIREMENTS.

10.150

PLUMBING & ACCESS ALL PLUMBING DUCTS TO HAVE ACCESS PANELS TO COUNCIL
PANELS. REQUIREMENTS, PLUMBER TO SIZE DOWNPIPES IN ACCORDANCE
‘AS. 3500 (MIN. DIA 80mm)

WATERPROOFING WATERPROOFING TO ALL WET AREAS TO COMPLY WITHAS 3740

DISABLED We WC FACILITIES FOR PERSONS WITH A DISABILITY ARE REQUIRED TO
FACILITIES COMPLY Wit AS14281 WHICH HAS SPECIFIC REQUIREMENTS FOR
“COMPARTMEEN

NT SIZE
BOOR SIDE CLEARANICES AND HARDWARE,

PAN LOCATION AND PAN SUITABLE FOR PERSONS WITHA DISABILITY

MUST COMPLY WITH AS1172,

HAND BASIN LOCATIONS AND CLEARANCES
LechrigN Ge TOILET ROLL HOLDER Lisi SWITCH , FLUSHING
a CONTROL. MIRRORS AND HAND
TIS RECOMENDED THAT-THe BUILDER BECOMES FAMILIAR WITH THE
STANDARDS PRIOR TO COMMENCEMENT OF FITOUT To We FACILITIES
FOR PERSONS WITH A DISABILITY.

 

 

 

 

‘SCALE 12100

(OY SITE PLAN

 

49.765

 

 

 

 

notes:

The designs, drawings and specication are
copyright and always remain the property of
BBackburne Jackson Design Pty Ltd

Before commencing construction:
Verity all mensions and levels.

Verity location and levels of al services on site.
Verity that floor levels and finished levels will
tenable connection to services.

Do not scale this drawing,
When in doubt refer to Architects.

amendment log

 

 

 

BUILDING APPROVAL
FOR INFORMATION: CONSULTANT ISSUE

 

 

 

 

 

 

 

 

Black burne Jackson Design
Architecture | Landscape | Interiors

 

 

 

 

nchge

87 Aerodrome Rd Maroochydore Qld
PO. Box 154 Cotton Tree Qld 4558
mail @blackburnejacksondesign com.au

 

 

 

.
is
| CEILING FANS FANS TO ALL LIVING ROOMS AND BEDROOM 1
o RI ENERGY EFFICIENCY REFER TO CONSULTANTS REPORT FOR A STAR RATED ALTERNATIVE
> hy -BCAPART ‘TO BCA PART J
a NoTE SURFACE & SUB-SOIL DRAINAGE TO BE IN ACCORDANCE WITH BCA
NOT FOR CONSTRUCTION
project: north date: 2015
PROPOSED APARTMENT DEVELOPMENT
ELANDA STREET SUNSHINE BEACH drawn: = MF
client: checked: RJ
ALDEV HOLDINGS scale: 1:100
title:
project/drawing no. sheet: At
s 7032/01 issue: 8

 

 

 

"TORETE EIaRa SST PER! Many, 14 March DOTS ZS ph

Page 26

 

OUTDOOR SHOWER,
GREEN WALL

3,680.2 SETBACK |

6

UNIT 1 A/C UNIT
SUSPENDED FROM
BALCONY SOFFIT

07

6,705.0

PLANTING

8

03
h uNTr2arc UNIT
ar RTMENT TANDEM 00 BALCONY SOFFIT S
ae c Sy
| i 5
5
o
eR . ets
© — sy —-@)

 

DOTTED LINE INDICATES FLOOR PLAN LEGEND

EXTENT OF ‘SMOOTH SET
RENDER FINISH TO INTERNAL

 

Pee DETER ETET, GSAS og Ne _AcoxmouNG uN
DASHED LINE ARE TO BE 2
‘TO INTERNAL WALLS AND ‘SMOOTH SET’ RENDER: 5 BAL BALUSTRADE
COLUMNS: FINISH (NOT INCLUDING. E c ‘CUPBOARD
COMMUN DRYING ACEH a el A © conTROL vow

DOOR NUMBER,
ELECTRIAL

EDGE CAPPING.

EAVES GUTTER
FINISHED FLOOR LEVEL
FIRE EXTINGHUISER

VISITOR 1
© =
° “Ty!
:

VISITOR 2

FIRE RATED DOOR
FLOOR WASTE

GRATED DRAIN
HANDRAIL,

HOSE COCK

HYDRANT

‘MICROWAVE

OVEN

PANTRY

PLANTER OUTLET
REFRIGERATOR

ROOF OUTLET
RELATIVE FLOOR LEVEL
STORE

‘SCREEN

‘SPOON DRAIN
‘SHELVING

‘SHOWER

‘SEWER MAN HOLE
SPITTER

‘STRUCTURAL FLOOR LEVEL

 

4,370.0 SETBACK

 

 

32°57!
0.835

POOL FENCE

K

 

WASHING MACHINE

UNDER BENCH FRIDGE
FLOOR PLAN
BASEMENT SOALE 1706

 
  

WINDOW NUMBER,

 

 

 

BUILDING APPROVAL
NOT FOR CONSTRUCTION

cHeoKeD
notes: issue [amendment log by[ date issue [amendment log by [date project: north
Wrwscon smn mimtaiman |S error comumrane [alee PROPOSED APARTMENT DEVELOPMENT

Copy andamaye roman te propery 08

pyr and nays oman tap Kr ELANDA STREET SUNSHINE BEACH drawn: MF

 

 

date: 2015

 

2 Before commencing construction: Black burne Jackson Design

/ ; hecked: RJ
vals chimera are ewe iv ch Cc Architecture T Landscape | Interiors | client: enews
Vary location and levels ofall services on sto : 45
SUNSHINE BEACH

 

 

 

ALDEV HOLDINGS scale: 13100
Verity iat et ove ad nish ves wl 27 Aeoome Ra Marocehyore is tite
P.O. Box 154 Cotton Tree Qld 4558. phone 07 5443 3200 Project/drawing no. sheet: Al

2 Da not scales drawing

Donot soa thi irawings ‘email. [email protected] fax 07 5443. 4030 FLOOR PLAN BASEMENT 7032/02

‘TOBE-TE Flange SSE pres! Monday. 14 March DOIG ESE pi

 

 

 

 

 

 

 

 

 

 

 

issue: B

 

 

 

 

Page 27

 

43°00!

ws
47.456
| se
[ | ig
S|
STAIR 3 cneen E
yw kA
| a
: + —-@
---p--
‘SHOWN DASHED iS

E
uw
uw
~
b
nv

5.270

 

FLOOR PLAN LEGEND

ELANDA

 

 

Bt-€2> | Gow. Trower emneo concnere
| ober
~ DRY (CLOTHES DRY AREA / LINE

\ DOOR NUMBER,

|g__Line OF SLAB OvER ELECTRIAL

‘SHOWN DASHED EDGE CAPPING.
EAVES GUTTER
FINISHED FLOOR LEVEL
FIRE EXTINGHUISER
FIRE RATED DOOR
FLOOR WASTE
GRATED DRAIN
HANDRAIL,
HOSE COCK
HYDRANT
MICROWAVE
OVEN
PANTRY
PLANTER OUTLET
REFRIGERATOR
ROOF OUTLET

4370 SETBACK

 

 

iLGo0Eb

K

49.765

RELATIVE FLOOR LEVEL
STORE

‘SCREEN

‘SPOON DRAIN

‘SHELVING

‘SHOWER

‘SEWER MAN HOLE

SPITTER

‘STRUCTURAL FLOOR LEVEL

WASHING MACHINE

 

UNDER BENCH FRIDGE

 
  

FLOOR PLAN
GROUND LEVEL SORLETIO0

WINDOW NUMBER,

 

 

 

BUILDING APPROVAL
NOT FOR CONSTRUCTION
(CHECKED
notes: issue [amendment log by|date issue [amendment log by [date project: north
‘A [BUILDING APPROVAL KM] 08-02-16
1. The designs, drawings and specification are PROPOSED APARTMENT DEVELOPMENT
Zorn and aways romain he ropary of 8 _ | FOR INFORMATION: CONSULTANT ISSUE Kut} 14-03-16 [ ELANDA STREET SUNSHINE BEACH drawn: MF

 

 

date: 2015

 

Before commencing construction: Black burne Jackson Design

‘ . hecked: RJ
Vey al mensions and eves iv sh c Architecture T Landscape |" Interiors | olient —
Very location and eves of al services on st. 45

 

 

 

ALDEV HOLDINGS scale: 1:100
Vi that or loves an ished ives wil

tenable connection to services.

\erodrome | faroochydore: title
ee swe meswixe | FLOOR PLAN GROUND projecting crest

 

 

 

 

 

 

 

 

 

 

 

LEVEL 7032/03 issue: B

‘TOBE-TE Flange SSE pres! Monday. 14 March DOIG ESE pi

 

 

 

 

Page 28

 

/i\ FLOOR PLAN
\ = / tEVELT SCALE TOO

 

4,000 x
I
\

srs

BTHSHR

‘BTHSHR,

9,200 Co

16,070 SETBACK

 

 

3,680 SETBACK >}

6.705

5.270

 

 

 

 

sl Zs
ep Ae
ee > --@)
| 5
| | | is
Ei
| | BI
| i i e
i i 3 +R
| 228°00! QU
i 49.765
) a
Wo

 

 

 

FLOOR PLAN LEGEND

Ac AIR CONDITIONING UNIT
APP. APPLIANCE CUPBOARD

Ac AIR CONDITIONING UNIT
BAL BALUSTRADE

c CUPBOARD

a CONTROL JOINT

CON. TROWELFINISHED CONCRETE
D puct

DRY CLOTHES DRY AREA/LINE
DP DOWN PIPES

Dw DISHWASHER UNDER,

DOOR NUMBER,

ELECTRIAL
EDGE CAPPING.

EAVES GUTTER
FINISHED FLOOR LEVEL
FIRE EXTINGHUISER
FIRE RATED DOOR
FLOOR WASTE

GRATED DRAIN
HANDRAIL,

HOSE COCK

HYDRANT

‘MICROWAVE

OVEN

PANTRY

PLANTER OUTLET
REFRIGERATOR

ROOF OUTLET
RELATIVE FLOOR LEVEL
STORE

‘SCREEN

‘SPOON DRAIN
‘SHELVING

‘SHOWER

‘SEWER MAN HOLE
SPITTER

‘STRUCTURAL FLOOR LEVEL

WASHING MACHINE

UNDER BENCH FRIDGE

WINDOW NUMBER,

 

 

BUILDING APPROVAL

NOT FOR CONSTRUCTION

 

 

notes:

The designs, drawings and specication are
copyright and always remain the property of
BBackburne Jackson Design Pty Ltd

Before commencing construction:
Verity all mensions and levels.

Verity location and levels of al services on site.
Verity that floor levels and finished levels will
tenable connection to services.

Do not scale this drawing,
When in doubt refer to Architects.

‘amendment log

by [date

 

 

 

BUILDING APPROVAL
FOR INFORMATION: CONSULTANT ISSUE

 

 

 

 

 

 

 

 

L ge :

 

Black burne Jackson Design
Architecture | Landscape | Interiors

87 Aerodrome Rd Maroochydore Qld

PO. Box 154 Cotton Tree Qld 4558 phone

‘email. [email protected] fax

 

 

 

 

 

project:
PROPOSED APARTMENT DEVELOPMENT
ELANDA STREET SUNSHINE BEACH

client:

ALDEV HOLDINGS

tile:

FLOOR PLAN LEVEL 1

 

CHECKED
north date: 2015
drawn: MF
checked: RJ
scale: 1:10
projectidrawing no, sheet: At

7032/04 issue: B

 

 

‘TOBE-TE Flange SSE pres! Monday. 14 March DOIG ESE pi

Page 29

 

9,200 oo 5,590 16,070 SETBACK >)
|
|
|

 

 

  

K 10,000 SETBACK x 6610
I
1
|
|

3,680 SETBACK >}

CON LID

6.705

5.270

 

FLOOR PLAN LEGEND

Ac AIR CONDITIONING UNIT
APP. APPLIANCE CUPBOARD

Ac AIR CONDITIONING UNIT
BAL BALUSTRADE

c CUPBOARD

a CONTROL JOINT

CON. TROWELFINISHED CONCRETE
D puct

DRY CLOTHES DRY AREA/LINE
DP DOWN PIPES

Dw DISHWASHER UNDER,

 

 

>

10.150

DOOR NUMBER,

ELECTRIAL
EDGE CAPPING.

EAVES GUTTER
FINISHED FLOOR LEVEL
FIRE EXTINGHUISER
FIRE RATED DOOR
FLOOR WASTE
GRATED DRAIN
HANDRAIL,

HOSE COCK

HYDRANT

‘MICROWAVE

OVEN

PANTRY

PLANTER OUTLET
REFRIGERATOR

ROOF OUTLET

©

 

 

 

 

K—-4370 SETBACK

 

RELATIVE FLOOR LEVEL
STORE

‘SCREEN

‘SPOON DRAIN

‘SHELVING

‘SHOWER

‘SEWER MAN HOLE

SPITTER

‘STRUCTURAL FLOOR LEVEL

 

WASHING MACHINE

UNDER BENCH FRIDGE

  
 

FLOOR PLAN
LEVEL2 SCRLETI0

WINDOW NUMBER,

    

 

 

BUILDING APPROVAL
NOT FOR CONSTRUCTION

(CHECKED

notes: issue [amendment log by|date issue [amendment log by [date project: north

1. The designs, drawings and specification are A [BUILDING APPROVAL KM 08-02-16 PROPOSED APARTMENT DEVELOPMENT
copyright and always remain the property of 8 _ | FOR INFORMATION, REVISED FLOOR PLAN UNITS 687) KM) 03-03-16 ELANDA STREET SUNSHINE BEACH drawn: MF
BBackbume Jackson Design Pty Li. © | FOR INFORMATION: CONSULTANT ISSUE Kut} 14-03-16 S!

 

 

date: 2015

 

2 Before commencing construction: Black burne Jackson Design

/ ; hecked: RJ
vals chimera are ewe iv ch Cc Architecture T Landscape | Interiors | client: enews
Vary location and levels ofall services on sto : 45
SUNSHINE BEACH

 

 

 

ALDEV HOLDINGS scale: 13100
Verity iat et ove ad nish ves wl 27 Aeoome Ra Marocehyore is tite
P.O. Box 154 Cotton Tree Qld 4558. phone 07 5443 3200 Project/drawing no. sheet: Al

2 Da not scales drawing

Donot soa thi irawings ‘email. [email protected] fax 07 5443. 4030 FL oOo R PLAN LEVEL 2 7032/05

‘TOBE-TE Flange SSE pres! Monday. 14 March DOIG ESE pi

 

 

 

 

 

 

 

 

 

 

 

issue: C

 

 

 

 

Page 30

nN ROOF PLAN
\c/ SCALE 1:100

®

10,000 SETBACK x
I
I
\

9,200 Qo 5,590 * 16,070 SETBACK >
|
|
|

 

 

LINE OF BALCONY
FLOOR BELOW

 

 

     

oof YH @
©
©

  

    

  
      
      
 
 

k 3,680 SETBACK >}

6.705,

LINE OF BALCONY
FLOOR BELOW

5270

LINE OF WALLS
BELOW SHOWN
DASHED

 

 

 

oI
er “Ue,
S|
LINE OF BALCONY
FLOOR BELOW
e|
S|
l<|
ca|
|
|
co]
S|
<9
al
NM

 

 

 

 

ROOF PLAN LEGEND

[) acconvensor unt
BG BOX GUTTER

DP DOWNPIPE

EC EDGE CAPPING

EG EAVES GUTTER

FL FLASHING

GF GUTTER FALL

GFL GASFLUE

MEF MECHANICAL EXHAUST FAN
RC RIDGE CAPPING

SP SPREADER.

VG VALLEY GUTTER

FRO ROOF DRAIN OUTLET

NoTE:

REFER TO HYDRAULIC ENGINEER'S DRAWING'S,
FOR GUTTER AND DP SIZES

 

 

BUILDING APPROVAL

NOT FOR CONSTRUCTION

 

 

notes:

The designs, drawings and specication are
copyright and always remain the property of
BBackburne Jackson Design Pty Ltd

Before commencing construction:
Verity all mensions and levels.

Verity location and levels of al services on site.
Verity that floor levels and finished levels will
tenable connection to services.

Do not scale this drawing,
When in doubt refer to Architects.

amendment log

 

FOR INFORMATION: CONSULTANT ISSUE

 

 

 

 

 

 

 

 

 

 

 

 

 

PO. Box 154 Cotton Tree Qld 4558 phone 0754433200

emai mal@backeumejactsondesigncomau tax 07540400 | ROOF PLAN

 

 

 

project:
PROPOSED APARTMENT DEVELOPMENT
/ s ELANDA STREET SUNSHINE BEACH
| Black burne Jackson Design |
vy © Architecture | Landscape | Interiors client:
ca i a ALDEV HOLDINGS
SUNSHINE BEACH 37 Aerodrome Fad Maroochydore Qld title

 

CHECKED
north date: 2015
drawn: MF
checked: RJ
scale: 1:10
project/drawing no. sheet: At

7032/06 issue:

 

 

"TORETE EIaRa SST PER! Many, 14 March DOTS ZS ph

Page 31

 

 

nN UPPER PLAN
\c/ SCALE 1:100

 

 

LINE OF ROOF
BELOW

 

ROOF BELOW

  
 

ROOF BELOW

LINE OF ROOF
BELOW

 

 

 

 

ROOF PLAN LEGEND

[) acconvensor unt
BG BOX GUTTER

DP DOWNPIPE

EC EDGE CAPPING

EG EAVES GUTTER

FL FLASHING

GF GUTTER FALL

GFL GASFLUE

MEF MECHANICAL EXHAUST FAN
RC RIDGE CAPPING

SP SPREADER.

VG VALLEY GUTTER

FRO ROOF DRAIN OUTLET

NoTE:

REFER TO HYDRAULIC ENGINEER'S DRAWING'S,
FOR GUTTER AND DP SIZES

 

 

BUILDING APPROVAL

NOT FOR CONSTRUCTION

 

 

 

 

 

 

notes: ‘amendment log date issue [amendment log project: north
BUILDING APPROVAL (08-02-16 date: 2015

1 The cesions avigs and spacfcaton ae FOR NFORKATION: CONSULTANT ISSUE ‘e036 PROPOSED APARTMENT DEVELOPMENT

Blacksurne Jackson Design Pty Li / ELANDA STREET SUNSHINE BEACH drawn: = MF

j Black burne Jackson Design hecked: RU

2 Soe crmenone crt fy if - gkputne Jeskson Pesign client checks

Venylecation and eves of al services on st. Ue : es ALDEV HOLDINGS scale: 1-100

Very at oo vlad shed vel il anne 27 heretome Fl Maroney ls title va

P.O. Box 154 Cotton Tree Qld 4558 phone Project/drawing no. sheet: Al

When in doubt refer to Architects.

 

 

 

 

 

 

 

 

 

 

 

‘email. [email protected] fax

 

UPPER ROOF PLAN

 

7032/07 issue: B

 

 

"TORETE EIaRa SST PER! Many, 14 March DOTS ZS ph

Page 32

                                                              15104 - SBSMP/0
                                                                       Page 24




                                             APPENDIX C


                                               DBYD DATA




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 33

43 Elanda Street
Sunshine Beach 4567

DBYD

SW by Type

EEEEES BoxCulvert
Allotment

Pipe Easement

Stormwater Misc Infrastructure

Optic Fibre Cable
« » Clever Networks Cooroy
Noosa Council's Fibre Network
SW by Type
° CatchPit
Bo Fieldiniet
Manhole

Covenant

xs
fe} NOOSA COUNCIL

While every care is taken to ensure the accuracy of this product, neither the Noosa Council nor
the State of Queensiand makes any representations or warranties about its acauracy, reliability,
completeness or sutabiity for any particular purpose and disclaims all responsibilty and af
liability (induding without limitation, liability in negligence) for all expenses, loses, damages
(induding indirect or consequential damage) and costs that may occur as a resuk of the product
being inaccurate or incomplete in any way or for any reason.

Crown & Council Copyright Reserved.
Geocentric Daturn of Australia 1994 (GDA94)

Created by: J8 Date: 09 July 2015

 

Page 34

                                                              15104 - SBSMP/0
                                                                       Page 25




                                             APPENDIX D


                           RATIONAL METHOD CALCULATIONS




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 35

                                                  Rational Method Peak Flow Calculations
Job No:            15104                                                                                                                                       MORGAN CONSULTING
Job Type:          Residential Development                                                                                                                      ENGINEERS PTY LTD
Address:           43 Elanda Street, Sunshine Beach                                                                                                         1 GREAT GEORGE STREET
Council:           Noosa Council                                                                                                                              PADDINGTON QLD 4064


IFD Data:          Noosa                                                          Minor Storm:   Q10                                                                        Designed: AW
1
I10                67mm/hr                                                        Major Storm: Q100                                                                         Checked: HM

Pre-Development                                                                                        Post-Development

Time of Concentration

Standard Inlet Time                                                                                    Standard Inlet Time
     Standard Inlet Time                      0    mins    QUDM 2007 4.06                                    Standard Inlet Time                  5   mins    QUDM 2007 4.06

Sheet Flow (Friends Equation)                              QUDM 2007 - Table 4.06.3                    Sheet Flow (Friends Equation)                          QUDM 2007 - Table 4.06.3
     Sheet flow length (L)       48                 m                                                        Sheet flow length (L)                      m
           roughness (n)      0.045                        short grass                                             roughness (n)                              short grass
              Fall of NSL       7.5                 m                                                                 Fall of NSL                      m
     Slope of Surface (S)      15.6                 %                                                        Slope of Surface (S)                      %
                      total    10.1                mins                                                                       total            0.0    mins
Concentrated Overland Flow                                                                             Pipe Flow
           Flow distance                            m                                                                Flow distance                     m
                 velocity                          m/s                                                              Fall of channel                    m
                    mins                           mins    QUDM 2007 - Figure 4.09                                   Flow Velocity                    m/s
   Surface type multiplier                                                                                                     total           0.0    mins
                     total                  0.0    mins

Total tc                                   10.1    mins                                                                Total tc                5.0    mins



Runoff Volume Calculations


      Name          Area (ha)         tc            fi      C10                                            Name         Area (ha)         tc             fi    C10
                     0.1468                         0       0.67                                                         0.1468                        0.65    0.82

           Total      0.147         10.1                    0.67                                               Total      0.147          5.0                   0.82

                   Frequency                                                                                           Frequency
      ARI                             Cy            Iy                     Qy                               ARI                           Cy            Iy                Qy
                     Factor                                A (Ha)                                                        Factor                              A (Ha)
    (years)                        (Fy*C10)       (mm/h)                 (m3/s)                           (years)                      (Fy*C10)       (mm/h)            (m3/s)
                      (Fy)                                                                                                (Fy)
      3 mth                                                              0.010                             3 mth                                                        0.016
         1            0.800         0.534          91       0.147        0.020                                1           0.800         0.652          119    0.147     0.032
         2            0.850         0.567          116      0.147        0.027                                2           0.850         0.693          151    0.147     0.043
         5            0.950         0.634          144      0.147        0.037                                5           0.950         0.774          187    0.147     0.059
        10            1.000         0.668          161      0.147        0.044                               10           1.000         0.815          209    0.147     0.069
        20            1.050         0.701          184      0.147        0.052                               20           1.050         0.856          237    0.147     0.083
        50            1.150         0.768          214      0.147        0.067                               50           1.150         0.937          275    0.147     0.105
       100            1.200         0.801          236      0.147        0.077                              100           1.200         0.978          305    0.147     0.121




                                                                                        Page 1 of 1                                                                             4/05/2016

Page 36

                                                              15104 - SBSMP/0
                                                                       Page 26




                                             APPENDIX E


                 XP-RAFTS PRE DEVELOPMENT MODEL RESULTS




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 37

                                                        Pre-D Site [ALL STORMS]
                                                                    Total Flow

                           1yr 10min max [0.021]    1yr 15min max [0.027]    1yr 20min max [0.034]    1yr 25min max [0.042]

                           1yr 30min max [0.039]    1yr 45min max [0.032]    1yr 60min max [0.039]    1yr 90min max [0.032]

                           1yr 120min max [0.030]   1yr 180min max [0.022]   1yr 360min max [0.014]   1yr 720min max [0.014]

                   0.040


                   0.035


                   0.030
Total Flow [cms]




                   0.025


                   0.020


                   0.015


                   0.010


                   0.005


                   0.000
                                                        3AM                              6AM                               9AM
              1 Thu Jan 2015                                             Time


[OCR of page images]
Pre-D Site [ALL STORMS]
Total Flow

lyr 10min max [0.021] lyr 15min max [0.027] lyr 20min max [0.034] lyr 25min max [0.042]

 

 

lyr 30min max [0.039] lyr 45min max [0.032] lyr 60min max [0.039] lyr 90min max [0.032]
ee pt

lyr 120min max [0.030] tlyr180min max [0.022] lyr 360min max [0.014] lyr 720min max [0.014]

0.040
0.035

0.030

o
oO
N
ou

o
oO
N
3°

 

Total Flow [cms]

0.015

 

0.010

0.005

 

0.000

3AM 6AM 9AM
1 Thu Jan 2015 Time

Page 38

                                                        Pre-D Site [ALL STORMS]
                                                                    Total Flow

                           2yr 10min max [0.035]    2yr 15min max [0.044]    2yr 20min max [0.048]    2yr 25min max [0.060]

                           2yr 30min max [0.056]    2yr 45min max [0.044]    2yr 60min max [0.052]    2yr 90min max [0.041]

                           2yr 120min max [0.039]   2yr 180min max [0.029]   2yr 360min max [0.019]   2yr 720min max [0.019]
                   0.060

                   0.055

                   0.050

                   0.045

                   0.040
Total Flow [cms]




                   0.035

                   0.030

                   0.025

                   0.020

                   0.015

                   0.010

                   0.005

                   0.000
                                                        3AM                              6AM                              9AM
              1 Thu Jan 2015                                             Time


[OCR of page images]
Pre-D Site [ALL STORMS]
Total Flow

Pe as Pe
2yr 10min max [0.035] 2yr 15min max [0.044] 2yr 20min max [0.048] 2yr 25min max [0.060]

 

 

2yr 30min max [0.056] 2yr 45min max [0.044] 2yr 6Omin max [0.052] 2yr 90min max [0.041]

2yr 120min max [0.039] 2yr180min max [0.029] 2yr 360min max [0.019] 2yr 720min max [0.019]
0.060

0.055
0.050
0.045

__0.040
E
50.035
5
2 0.030

©
© 0.025
a
0.020
0.015
0.010
0.005
0.000 : \’ :

3AM 6AM 9AM
1 Thu Jan 2015 Time

 

 

 

 

 

Page 39

                                                       Pre-D Site [ALL STORMS]
                                                                    Total Flow

                          5yr 10min max [0.050]    5yr 15min max [0.066]     5yr 20min max [0.064]   5yr 25min max [0.079]

                          5yr 30min max [0.073]    5yr 45min max [0.059]     5yr 60min max [0.067]   5yr 90min max [0.054]

                          5yr 120min max [0.052]   5yr 180min max [0.038]   5yr 360min max [0.026]   5yr 720min max [0.026]
                   0.08


                   0.07


                   0.06


                   0.05
Total Flow [cms]




                   0.04


                   0.03


                   0.02


                   0.01


                   0.00
                      1 Thu                            3AM                               6AM                              9AM
                      Jan 2015                                          Time


[OCR of page images]
Pre-D Site [ALL STORMS]
Total Flow
a Pe a
5yr 10min max [0.050] 5yr 15min max [0.066] 5yr 20min max [0.064] 5yr 25min max [0.079]

 

 

5yr 30min max [0.073] 5yr 45min max [0.059] 5yr 6Omin max [0.067] 5yr 90min max [0.054]
ee pt

0.08 5yr 120min max [0.052] 5yr180min max [0.038]  5yr 360min max [0.026] 5yr 720min max [0.026]

0.07

Total Flow [cms]
° ° °
So So So
aS o1 oO

9
oO
o

 

 

 

 

 

 

 

 

0.02
1 Thu 3AM 6AM 9AM

Jan 2015 Time

Page 40

                                                        Pre-D Site [ALL STORMS]
                                                                       Total Flow

                          10yr 10min max [0.059]    10yr 15min max [0.077]           10yr 20min max [0.073]    10yr 25min max [0.089]

                          10yr 30min max [0.082]    10yr 45min max [0.069]           10yr 60min max [0.077]    10yr 90min max [0.061]

                          10yr 120min max [0.059]   10yr 180min max [0.043]          10yr 360min max [0.030]   10yr 720min max [0.031]
                   0.09


                   0.08


                   0.07


                   0.06
Total Flow [cms]




                   0.05


                   0.04


                   0.03


                   0.02


                   0.01


                   0.00
                                                        3AM                                       6AM                                    9AM
              1 Thu Jan 2015                                                  Time


[OCR of page images]
Pre-D Site [ALL STORMS]

 

 

Total Flow
P| P| P|
10yr 10min max [0.059] 10yr 15min max [0.077] 10yr 20min max [0.073] 10yr 25min max [0.089]
10yr 30min max [0.082] 10yr 45min max [0.069] 10yr 60min max [0.077] 10yr 90min max [0.061]
—x Fe
0.09 10yr 120min max [0.059] 10yr 180min max [0.043] 10yr 360min max [0.030] 10yr 720min max [0.031]
0.08
0.07 |
0.06 1 !
n
€ |
2.0.05--)}-
= I
oO f
nm i
we 0.04--} hh -
Oo |
- |
0.03-4
0.02
_ } FL

 

 

 

 

  

0.00

 

 

 

3AM 6AM 9AM
1 Thu Jan 2015 Time

Page 41

                                                        Pre-D Site [ALL STORMS]
                                                                       Total Flow

                          20yr 10min max [0.069]    20yr 15min max [0.100]           20yr 20min max [0.092]    20yr 25min max [0.102]

                          20yr 30min max [0.094]    20yr 45min max [0.081]           20yr 60min max [0.090]    20yr 90min max [0.071]

                          20yr 120min max [0.069]   20yr 180min max [0.050]          20yr 360min max [0.035]   20yr 720min max [0.037]
                   0.10

                   0.09

                   0.08

                   0.07
Total Flow [cms]




                   0.06

                   0.05

                   0.04

                   0.03

                   0.02

                   0.01

                   0.00
                                                        3AM                                       6AM                                    9AM
              1 Thu Jan 2015                                                  Time


[OCR of page images]
Pre-D Site [ALL STORMS]

 

Total Flow
P| P| P|
20yr 10min max [0.069] 20yr 15min max [0.100] 20yr 20min max [0.092] 20yr 25min max [0.102]
20yr 30min max [0.094] 20yr 45min max [0.081] 20yr 60min max [0.090] 20yr 90min max [0.071]
—x Fe

20yr 120min max [0.069] 20yr 180min max [0.050] 20yr 360min max [0.035] 20yr 720min max [0.037]
0.10 |
0.09
0.08
0.07--||)

9
So
®

Total Flow [cms]
oO oO
So So
& oO

9
oO
o

0.02

 

0.01

 

 

 

 

 

 

3AM 6AM 9AM
1 Thu Jan 2015 Time

Page 42

                                                        Pre-D Site [ALL STORMS]
                                                                       Total Flow

                          50yr 10min max [0.085]    50yr 15min max [0.107]           50yr 20min max [0.107]    50yr 25min max [0.106]

                          50yr 30min max [0.100]    50yr 45min max [0.093]           50yr 60min max [0.100]    50yr 90min max [0.075]

                          50yr 120min max [0.072]   50yr 180min max [0.053]          50yr 360min max [0.038]   50yr 720min max [0.040]
                   0.11

                   0.10

                   0.09

                   0.08

                   0.07
Total Flow [cms]




                   0.06

                   0.05

                   0.04

                   0.03

                   0.02

                   0.01

                   0.00
                      1 Thu                             3AM                                       6AM                                    9AM
                      Jan 2015                                                Time


[OCR of page images]
Pre-D Site [ALL STORMS]

 

 

 

 

 

Total Flow
P| P| P|
50yr 10min max [0.085] 50yr 15min max [0.107] 50yr 20min max [0.107] 50yr 25min max [0.106]
50yr 30min max [0.100] 50yr 45min max [0.093] 50yr 60min max [0.100] 50yr 90min max [0.075]
—x Fe

0.11 50yr 120min max [0.072] 50yr 180min max [0.053] 50yr 360min max [0.038] 50yr 720min max [0.040]

0.10

0.09

0.08
qo.07
€
=0.06
= 0.
2
me
= 0.05
e

0.04

0.03

0.02

0.01

0.00

1 Thu

Jan 2015 Time

Page 43

                                                     Pre-D Site [ALL STORMS]
                                                                 Total Flow

                          100yr 10min max [0.096]          100yr 15min max [0.120]          100yr 20min max [0.115]

                          100yr 25min max [0.117]          100yr 30min max [0.110]          100yr 45min max [0.102]

                          100yr 60min max [0.110]          100yr 90min max [0.086]          100yr 120min max [0.082]

                          100yr 180min max [0.059]         100yr 360min max [0.043]         100yr 720min max [0.045]
                   0.12

                   0.11

                   0.10

                   0.09

                   0.08
Total Flow [cms]




                   0.07

                   0.06

                   0.05

                   0.04

                   0.03

                   0.02

                   0.01

                   0.00
                                                     3AM                              6AM                              9AM
              1 Thu Jan 2015                                         Time


[OCR of page images]
Pre-D Site [ALL STORMS]

 

 

 

 

 

Total Flow
Pe Pe
100yr 10min max [0.096] 100yr 15min max [0.120] 100yr 20min max [0.115]
Pe —
100yr 25min max [0.117] 100yr 30min max [0.110] 100yr 45min = max [0.102]
100yr 6Omin max [0.110] 100yr 90min max [0.086] 100yr 120min max [0.082]
Pp
100yr 180min max [0.059] 100yr 360min max [0.043] 100yr 720min max [0.045]
0.12
0.11
0.10
0.09- fi
— 0.08
E
2,0.07
5 I
ir 0.06
G
= 0.05 |
a
0.04
0.03 \|
0.02
0.01 S
0.00
3AM 6AM 9AM

1 Thu Jan 2015 Time

Page 44

                                                              15104 - SBSMP/0
                                                                       Page 27




                                             APPENDIX F


    XP-RAFTS POST DEVELOPMENT UNMITIGATED MODEL RESULTS




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 45

                                                        Post-D Unm [ALL STORMS]
                                                                      Total Flow

                            1yr 10min max [0.045]     1yr 15min max [0.051]          1yr 20min max [0.051]    1yr 25min max [0.052]

                            1yr 30min max [0.048]     1yr 45min max [0.043]          1yr 60min max [0.046]    1yr 90min max [0.037]

                           1yr 120min max [0.035]    1yr 180min max [0.023]      1yr 360min max [0.015]      1yr 720min max [0.015]

                           1yr 1080min max [0.010]   1yr 1440min max [0.011]     1yr 2160min max [0.007]     1yr 2880min max [0.007]

                           1yr 4320min max [0.005]

                   0.050

                   0.045

                   0.040

                   0.035
Total Flow [cms]




                   0.030

                   0.025

                   0.020

                   0.015

                   0.010

                   0.005

                   0.000
                       1 Thu                              3AM                                    6AM                                  9AM
                       Jan 2015                                               Time


[OCR of page images]
Post-D Unm [ALL STORMS]
Total Flow

P| P| fe
lyr 10min max [0.045] lyr 15min max [0.051] lyr 20min max [0.051] lyr 25min max [0.052]

lyr 30min max [0.048] lyr 45min max [0.043] lyr 60min max [0.046] lyr 90min max [0.037]
—= PF
lyr 120min max [0.035] lyr 180min max [0.023] lyr 360min max [0.015] lyr 720min max [0.015]
P|
lyr 1080min max [0.010] lyr1440min max [0.011] 1yr2160min max [0.007] lyr 2880min max [0.007]
pe

lyr 4320min max [0.005]

0.050
0.045
0.040

0.035

€

2:0.030

=
oO

IZ 0.025

a

© 0.020
0.015-}
0.010

0.005

 

 

 

 

0.000 a
1 Thu 3AM 6AM 9AM
Jan 2015 Time

Page 46

                                                       Post-D Unm [ALL STORMS]
                                                                     Total Flow

                           2yr 10min max [0.056]     2yr 15min max [0.065]          2yr 20min max [0.065]    2yr 25min max [0.066]

                           2yr 30min max [0.061]     2yr 45min max [0.055]          2yr 60min max [0.058]    2yr 90min max [0.048]

                          2yr 120min max [0.046]    2yr 180min max [0.030]      2yr 360min max [0.020]      2yr 720min max [0.020]

                          2yr 1080min max [0.014]   2yr 1440min max [0.014]     2yr 2160min max [0.010]     2yr 2880min max [0.009]

                          2yr 4320min max [0.007]


                   0.06


                   0.05
Total Flow [cms]




                   0.04


                   0.03


                   0.02


                   0.01


                   0.00
                      1 Thu                              3AM                                    6AM                              9AM
                      Jan 2015                                               Time


[OCR of page images]
Post-D Unm [ALL STORMS]

 

 

 

 

 

Total Flow
P| P| fe
2yr 10min max [0.056] 2yr 15min max [0.065] 2yr 20min max [0.065] 2yr 25min max [0.066]
2yr 30min max [0.061] 2yr 45min max [0.055] 2yr 6Omin = max [0.058] 2yr 90min max [0.048]
—= PF
2yr 120min max [0.046] 2yr 180min max [0.030] 2yr 360min max [0.020] 2yr 720min max [0.020]
P|
2yr 1080min max [0.014] 2yr1440min max [0.014] 2yr2160min max [0.010] 2yr 2880min max [0.009]
pe
2yr 4320min max [0.007]
0.06
0.05
a
5 0.04
=
©
iL
q 0.03
o
a
0.02
0.01
Se eee —
\. \——____
0.00
1 Thu 6AM 9AM

 

Jan 2015 Time

 

 

Page 47

                                                       Post-D Unm [ALL STORMS]
                                                                       Total Flow

                           5yr 10min max [0.070]     5yr 15min max [0.080]            5yr 20min max [0.081]     5yr 25min max [0.082]

                           5yr 30min max [0.076]     5yr 45min max [0.068]            5yr 60min max [0.073]     5yr 90min max [0.061]

                          5yr 120min max [0.059]    5yr 180min max [0.039]           5yr 360min max [0.026]    5yr 720min max [0.027]

                          5yr 1080min max [0.019]   5yr 1440min max [0.020]          5yr 2160min max [0.014]   5yr 2880min max [0.014]

                          5yr 4320min max [0.010]

                   0.08

                   0.07

                   0.06
Total Flow [cms]




                   0.05

                   0.04

                   0.03

                   0.02

                   0.01

                   0.00
                                                        3AM                                       6AM                                    9AM
              1 Thu Jan 2015                                                  Time


[OCR of page images]
Post-D Unm [ALL STORMS]

 

Total Flow
| P| P|
5yr 10min max [0.070] 5yr 15min max [0.080] 5yr 20min max [0.081] 5yr 25min max [0.082]
5yr 30min max [0.076] 5yr 45min max [0.068] 5yr 60min max [0.073] 5yr 90min max [0.061]
—x P|
5yr 120min max [0.059] 5yr 180min max [0.039] 5yr 360min max [0.026] 5yr 720min max [0.027]
P|
5yr 1080min max [0.019] 5yr 1440min max [0.020] 5yr 2160min max [0.014] 5yr 2880min max [0.014]

5yr 4320min max [0.010]

0.08

0.07

o o o
2S 2 2°
BR a fon)

Total Flow [cms]

o
2
@

 

o
oO
N

 

0.01—"

0.00

 

 

 

6AM 9AM
1 Thu Jan 2015 Time

Page 48

                                                         Post-D Unm [ALL STORMS]
                                                                        Total Flow

                           10yr 10min max [0.078]     10yr 15min max [0.089]          10yr 20min max [0.090]    10yr 25min max [0.091]

                           10yr 30min max [0.084]     10yr 45min max [0.076]          10yr 60min max [0.082]    10yr 90min max [0.069]

                          10yr 120min max [0.067]    10yr 180min max [0.044]      10yr 360min max [0.030]      10yr 720min max [0.032]

                          10yr 1080min max [0.023]   10yr 1440min max [0.023]     10yr 2160min max [0.017]     10yr 2880min max [0.016]

                          10yr 4320min max [0.012]
                   0.09

                   0.08

                   0.07

                   0.06
Total Flow [cms]




                   0.05

                   0.04

                   0.03

                   0.02

                   0.01

                   0.00
                                                          3AM                                      6AM
              1 Thu Jan 2015                                                   Time


[OCR of page images]
0.09

0.08

Total Flow [cms]
o SfS 2S 98S
oO oO oO oO
aS o a N

o
2
o

0.02

0.01-}

0.00

 

Post-D Unm [ALL STORMS]
Total Flow
Pe Pe Pe
10yr 10min max [0.078] 10yr 15min max [0.089] 10yr 20min max [0.090] 10yr 25min max [0.091]

10yr 30min max [0.084] 10yr 45min max [0.076] 10yr 60min max [0.082] 10yr 90min max [0.069]

 

— PF

10yr 120min max [0.067] 10yr 180min max [0.044] 10yr 360min max [0.030] 10yr 720min max [0.032]
Pe

10yr 1080min max [0.023] 10yr1440min max [0.023] 10yr 2160min max [0.017] 10yr 2880min max [0.016]

pe
10yr 4320min max [0.012]

 

 

 

1 Thu Jan 2015 Time

Page 49

                                                         Post-D Unm [ALL STORMS]
                                                                        Total Flow

                           20yr 10min max [0.089]     20yr 15min max [0.102]          20yr 20min max [0.103]    20yr 25min max [0.104]

                           20yr 30min max [0.096]     20yr 45min max [0.087]          20yr 60min max [0.093]    20yr 90min max [0.079]

                          20yr 120min max [0.077]    20yr 180min max [0.051]      20yr 360min max [0.036]      20yr 720min max [0.038]

                          20yr 1080min max [0.027]   20yr 1440min max [0.028]     20yr 2160min max [0.020]     20yr 2880min max [0.020]

                          20yr 4320min max [0.015]

                   0.10

                   0.09

                   0.08

                   0.07
Total Flow [cms]




                   0.06

                   0.05

                   0.04

                   0.03

                   0.02

                   0.01

                   0.00
                                                          3AM                                     6AM                                9AM
              1 Thu Jan 2015                                                   Time


[OCR of page images]
Post-D Unm [ALL STORMS]
Total Flow

Pe Pe Pe
20yr 10min max [0.089] 20yr 15min max [0.102] 20yr 20min max [0.103] 20yr 25min max [0.104]

20yr 30min max [0.096] 20yr 45min max [0.087] 20yr 60min max [0.093] 20yr 90min max [0.079]

 

— PF
20yr 120min max [0.077] 20yr 180min max [0.051] 20yr 360min max [0.036] 20yr 720min max [0.038]
Pe
20yr 1080min max [0.027] 20yr1440min max [0.028] 20yr2160min max [0.020] 20yr 2880min max [0.020]

pe
20yr 4320min max [0.015]

 

— —_ = —_7

6AM 9AM

 

 

1 Thu Jan 2015 Time

Page 50

                                                         Post-D Unm [ALL STORMS]
                                                                        Total Flow

                           50yr 10min max [0.098]     50yr 15min max [0.110]          50yr 20min max [0.111]    50yr 25min max [0.108]

                           50yr 30min max [0.101]     50yr 45min max [0.095]          50yr 60min max [0.102]    50yr 90min max [0.082]

                          50yr 120min max [0.079]    50yr 180min max [0.054]      50yr 360min max [0.038]      50yr 720min max [0.040]

                          50yr 1080min max [0.030]   50yr 1440min max [0.031]     50yr 2160min max [0.022]     50yr 2880min max [0.021]

                          50yr 4320min max [0.016]
                   0.11

                   0.10

                   0.09

                   0.08
Total Flow [cms]




                   0.07

                   0.06

                   0.05

                   0.04

                   0.03

                   0.02

                   0.01

                   0.00
                      1 Thu                               3AM                                      6AM
                      Jan 2015                                                 Time


[OCR of page images]
Pe
50yr 10min max [0.098]

5O0yr 30min max [0.101]

50yr 120min max [0.079]

 

50yr 1080min max [0.030]
pe

50yr 4320min max [0.016]

 

 

Jan 2015

Post-D Unm [ALL STORMS]
Total Flow

Pe
50yr 15min max [0.110] 50yr 20min max [0.111]

50yr 45min max [0.095] 50yr 60min max [0.102]
PF

50yr 180min max [0.054] 50yr 360min max [0.038]
Pe

50yr 1440min max [0.031] 50yr 2160min max [0.022]

 

= n \
3AM 6AM
Time

 

Pe
5Oyr 25min max [0.108]

50yr 90min max [0.082]
50yr 720min max [0.040]

50yr 2880min max [0.021]

Page 51

                                                          Post-D Unm [ALL STORMS]
                                                                         Total Flow

                           100yr 10min max [0.110]     100yr 15min max [0.121]          100yr 20min max [0.122]    100yr 25min max [0.119]

                           100yr 30min max [0.112]     100yr 45min max [0.106]          100yr 60min max [0.113]    100yr 90min max [0.091]

                          100yr 120min max [0.088]    100yr 180min max [0.060]      100yr 360min max [0.043]      100yr 720min max [0.046]

                          100yr 1080min max [0.034]   100yr 1440min max [0.035]     100yr 2160min max [0.026]     100yr 2880min max [0.025]

                          100yr 4320min max [0.019]

                   0.12
                   0.11
                   0.10
                   0.09
Total Flow [cms]




                   0.08
                   0.07
                   0.06
                   0.05
                   0.04
                   0.03
                   0.02
                   0.01
                   0.00
                      1 Thu                                3AM                                       6AM                                 9AM
                      Jan 2015                                                   Time


[OCR of page images]
Post-D Unm [ALL STORMS]
Total Flow

| | Yt
100yr 10min max [0.110] 100yr 15min max [0.121] 100yr 20min max [0.122] 100yr 25min max [0.119]

100yr 30min max [0.112] 100yr 45min max [0.106] 100yr 60min max [0.113] 100yr 90min max [0.091]

 

 

=x Pe
100yr 120min max [0.088] 100yr 180min max [0.060] 100yr 360min max [0.043] 100yr 720min max [0.046]
Le
100yr 1080min max [0.034] 100yr1440min max [0.035] 100yr 2160min max [0.026] 100yr 2880min max [0.025]

P|
100yr 4320min max [0.019]

 

[ —_ f+

3AM 6AM 9AM
Time

 

 

 

 

Page 52

                                                              15104 - SBSMP/0
                                                                       Page 28




                                             APPENDIX G


                          PRECAST DETENTION TANK DETAILS




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 53

                                                                                                                                                                                                                                                                                               1 - GENERAL NOTES
 Standard Heavy DutyAbove ground 23,000L Water Tank                          Standard Heavy Duty In ground 23,000L Water Tank                                                                                                                                                                  1.1 - These drawings shall be read in conjuction with all other consultant
 •   1 x 500mm QLD Approved strainer                                         •   1 x 480mm Access with concrete access cover                                                                                                                                                                   drawings and specifications. Any discrepancies shall be referred to the architect
 •   1 x 100mm Overflow @ top of wall                                        •   1 x 100mm Overflow @ top of wall                                                                                                                                                                              or project manager for a decision before proceeding with the work.
 •   1 x 32mm female Brass @ base of wall                                    •   2 x 100mm Inlet @ top of wall                                                                                                                                                                                 Any decision that inputs on Engineering Design shall be referred to the Engineer
                                                                             •   1 x 32mm female Brass @ top of wall
                                                                                                                                                                                                                                                                                               for confirmation of design integrity.
                             55 top of wall
                                                                                                                                                                                                                                                                                               1.2 - Dimensions SHALL NOT be obtained by scaling off the drawings.
     75




           lid thickness
                                           manhole
                                                     2 x 100mm Inlet           100mm overflow                                                                                                                                                                                                  1.3 - All dimensions shall be checked by Builder prior to commencement of
                                                     1 x 32mm Brass                                                                                                                                                                                                                            works.

                                                                                                                                                                                                                                                                                               1.4 - Tank Design for exclusive use by Allcast Precast only.

                                                                                                                                                                                                                                                                                               1.5 - Engineering Certification by HR Design. Form is available at time of




                                                                                                                   2800 overall height


                                                                                                                                         2530 overflow height
                                                                        Reinforced with                                                                                                                                                                                                        purchase.
                                                                        TM484265R mesh

                                                                                                                                                                                                                                                                                               2 - LOADINGS
                                                                                                                                                                                                                                                                                               2.1 - The structural work as shown in these drawings has been designed for the following cases:
                                                40 MPa high density concrete                                                                                                                                                                                                                      (i) a lid load of 500kg.
    600 x 600 N12
                                                10mm aggregate
    corners bars @
    600 cnrs

                                                SL82 mesh to floor                                                                                                                                                                                                                             3 - FOUNDATIONS
     125




           floor thickness
                                                                                                                                                                                                                                                                                               3.1 - Foundation material preparation to be in accordance with consulting civil
                                                                                                      Refer Bouyancy control
                                  4m x 4m leveled site with 75mm of 5-10mm scredded gravel               joint detail below                                                                                                                                                                    engineer deign and specifications.
                             100 top of taper
                                                                                                                                                                                                                                                       4 x 2.5 Tonne swift lift anchors at
                               150 at base
                                                                                                                                                                                                                                                      base of external wall.                   3.2 - Tank backfill material to be free draining and placed in accordance with
                                                                                                                                                                                                                                                      3.5m spreader bar required for lifting   Allcast Precast backfill specifications.

                                                                                                                                                                                                                                                                                               3.3 - Where suitable foundation bearing capacity is not achieved, contact HR
                   TANK DESIGN                                                                                                                                                                                                                                                                 Design Engineers for alternative design solution.
                    1 : 50
                                                                                                                                                                                                                                                                                               4 - REINFORCED CONCRETE
                                                                                                                                                                                                                                                                                               4.1 - All work shall be in accordance with all current Australian Standards as
                                                                                                        SL62 central layer                                                                                                                                                                     a MINIMUM work standard.
                                                                                                        Trimmed to suit manhole
                                                                        90




                                                                                                                                                                                                                                                                                               4.2 - Concrete shall have a characteristic compressive strength after 28
                             75




                                                                                                                                                                                                                                                                                               days of not less than : 40 MPa.
                                                                3480 Diameter

                                                                                                                                                                                                                                                                                               4.3 - All concrete shall be mechanically vibrated. Vibrator shall not be used
                                                                                                                                                                                                                                                                                               to spread concrete.

                                                                                                                                                                       Allcast Precast Water Tank                                                                                              4.4 - All reinforcement shall be supported on plastic chairs, generally at not
                                                                                                                                                                                                                                                                                               greater than 800mm centres in both directions. Bars shall be tied at
                                                                                                                                                                                                                                                                                               alternate intersections.
                                                                                                                                                                                                                                                                      For Concrete
                                                                                                                                                                                                                                                                      volumes speak to
                                                                                                                                                                                                                                                                      Allcast Precast
                                                                                                                                                                                                                                                                                               4.5 - Concrete to have a maximum aggregate size of 10mm and
                                                                                                                                                                                                                                                                      Engineer                 water/cement ratio of not greater than 0.65.
R10 links around edge                                                                                                                                                                                                                                                                          The maximum permissible transport time for concrete between batching
top and bottom                                                                                                                                                                                                                                                                                 and placement on site shall be in accordance with the following table.

                                                                                                                                                                                                                                                                                                        AMBIENT AIR              MAX. BATCHING TO PLACEMENT
                                                                                                                                                                                                                                                                                                       TEMPERATURE                              TIME
                                                                                                                                                                                                                                                                                                          10°-24°C                          120 minutes
                                                                                                                                                                75mm 5-10mm                                                                                                                               25°-27°C                           90 minutes
                                                                                                                                                                gravel bed                                                                                                                                28°-30°C                           60 minutes
                                                                                                                                                                                                                                                                      N12 bar, chem-set                   31°-33°C                           45 minutes
                                                                                                                                                                                                                                                                      into 12mm hole                      34°-36°C                           30 minutes
                                                                                                                                                                                                                                                                      drilled as shown                     37°C+                  No placement of concrete unless
                                                                                                                              3 x 1.3 Tonne                                                                                                                                                                                          chilled water or ice in mix
                                                                                                                              swift lift anchors

                                                                                                                                                                                                                                                                                               4.6 - All reinforcement shall be supplied by a registered manufacturer with an
                                                                                                                                                                                Anti-flotation control only required for Tanks in high water table areas or Pump out tanks
                                                                                                                                                                                                                                                                                               approved and certifier quality assurance program in place. All reinforcement is
                                                                                                                                                                                                                                                                                               to comply with the requirements of AS 1302, AS 1303 and AS 1304 as
                                                                                                                                                                                                                                                                                               applicable.

                                                                                                                                                                                                                                                                                               4.7 - All reinforcement is to be placed free from oil, grease or other surface
                   LID DESIGN                                                                                                                                                 BOUYANCY CONTROL JOINT                                                                                           coatings which may impair bond to concrete.
                    1 : 50                                                                                                                                                    1 : 10                                                                                                           4.8 - All reinforcement to be 500 MPa minimum yield unless noted otherwise.

                                                                                                                                                                                                                                                                                               4.9 - Reinforcement shall not be welded without written approval from the
                                                                                                                                                                                                                                                                                               Engineer.




                                                                PHONE            :: (07) 5442 2522
                                                                                                                                                                                                                                                                                                                             HD23,000 LITRE WATER TANK
                                                                FAX              :: (07) 5442 2479
                                                                                                                                                                                                                                                                                                                                                 TOTAL WEIGHT - 9.8 T
                                                                POST             :: PO Box 100, Woombye Q 4559

                                                                FACTORY          :: 40 Hill St, Woombye Q 4559
                                                                                                                                                                                                                                                                                                                                       GENERAL ARRANGEMENT SHOWN
                                                                WEB              :: www.allcastprecast.com.au                                                                                                                                                                                                                           CUSTOM FITTINGS BY REQUEST

Page 54

                                                              15104 - SBSMP/0
                                                                       Page 29




                                             APPENDIX H


                          DETAILED CIVIL ENGINEERING PLANS




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 55

                                                                ³




                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 56

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 57

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 58

                                                                    ³   ³   ³   ³




³   ³                     ³




                              P:             (07) 3369 8411
                              F:             (07) 3369 1893
                              E : [email protected]
                              © Morgan Consulting Engineers
                              This drawing is not to be copied,
                              retained or used without the
                              permission of the copyright holder.


    1 GREAT GEORGE STREET
    PADDINGTON Q LD 4 0 6 4

Page 59

                                                              15104 - SBSMP/0
                                                                       Page 30




                                               APPENDIX I


  XP-RAFTS POST DEVELOPMENT MITIGATED MODEL MINOR STORM
                                                 RESULTS




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 60

                                                              LPD [ALL STORMS]
                                                                        Total Flow

                            10yr 10min max [0.052]     10yr 15min max [0.059]          10yr 20min max [0.057]    10yr 25min max [0.063]

                            10yr 30min max [0.061]     10yr 45min max [0.053]          10yr 60min max [0.058]    10yr 90min max [0.049]

                           10yr 120min max [0.048]    10yr 180min max [0.041]      10yr 360min max [0.030]      10yr 720min max [0.031]

                           10yr 1080min max [0.023]   10yr 1440min max [0.023]     10yr 2160min max [0.017]     10yr 2880min max [0.016]

                           10yr 4320min max [0.013]

                   0.060
                   0.055
                   0.050
                   0.045
Total Flow [cms]




                   0.040
                   0.035
                   0.030
                   0.025
                   0.020
                   0.015
                   0.010
                   0.005
                   0.000
                       1 Thu                               3AM                                      6AM                                   9AM
                        Jan 2015                                                Time


[OCR of page images]
LPD [ALL STORMS]
Total Flow
P| ; |
10yr 10min max [0.052] 10yr 15min max [0.059] 10yr 20min max [0.057] 10yr 25min max [0.063]

10yr 30min max [0.061] 10yr 45min max [0.053] 10yr 60min max [0.058] 10yr 90min max [0.049]

= Pe
10yr 120min max [0.048] 10yr 180min max [0.041] 10yr 360min max [0.030] 10yr 720min max [0.031]
;
10yr 1080min max [0.023] 10yr1440min max [0.023] 10yr2160min max [0.017] 10yr 2880min max [0.016]
Pe

10yr 4320min max [0.013]

0.060
0.055
0.050
0.045

20.040

S,

= 0.035

2

iC 0.030

z

5 0.025

a
0.020
0.015
0.010

 

 

   

 

  
 

 

0.005- -—|
0.000 Mo <
1 Thu 9AM

Jan 2015

Page 61

                                                                       Tank [ALL STORMS]
                                                                             Basin:Basin Outflow

                                     10yr 10min max [0.042]     10yr 15min max [0.046]          10yr 20min max [0.047]    10yr 25min max [0.050]

                                     10yr 30min max [0.048]     10yr 45min max [0.044]          10yr 60min max [0.047]    10yr 90min max [0.040]

                                    10yr 120min max [0.038]    10yr 180min max [0.034]      10yr 360min max [0.026]      10yr 720min max [0.027]

                                    10yr 1080min max [0.019]   10yr 1440min max [0.020]     10yr 2160min max [0.014]     10yr 2880min max [0.014]

                                    10yr 4320min max [0.011]
                            0.050

                            0.045

                            0.040
Basin:Basin Outflow [cms]




                            0.035

                            0.030

                            0.025

                            0.020

                            0.015

                            0.010

                            0.005

                            0.000
                                                                    3AM                                      6AM                                   9AM
                       1 Thu Jan 2015                                                    Time


[OCR of page images]
Tank [ALL STORMS]

Basin:Basin Outflow

P| ; |
10yr 10min max [0.042] 10yr 15min max [0.046] 10yr 20min max [0.047] 10yr 25min max [0.050]

10yr 30min max [0.048] 10yr 45min max [0.044] 10yr 60min max [0.047] 10yr 90min max [0.040]

= Pe
10yr 120min max [0.038] 10yr 180min max [0.034] 10yr 360min max [0.026] 10yr 720min max [0.027]
;
10yr 1080min max [0.019] 10yr1440min max [0.020] 10yr2160min max [0.014] 10yr 2880min max [0.014]
Pe

10yr 4320min max [0.011]

0.050

0.045

0.040

Basin:Basin Outflow [cms]
o fo fF FS 98
oO oO oO oO oO
Re N N ow ow
o oO o oO ol

 

 

 

 

0.000

 

 

 

6AM 9AM
1 Thu Jan 2015 Time

Page 62

                                                                   Tank [ALL STORMS]
                                                                          Basin:Basin Stage

                               10yr 10min max [1.532]     10yr 15min max [1.835]            10yr 20min max [1.924]     10yr 25min max [2.152]

                               10yr 30min max [2.003]     10yr 45min max [1.681]            10yr 60min max [1.864]     10yr 90min max [1.364]

                              10yr 120min max [1.268]    10yr 180min max [1.002]           10yr 360min max [0.566]    10yr 720min max [0.609]

                              10yr 1080min max [0.317]   10yr 1440min max [0.339]          10yr 2160min max [0.178]   10yr 2880min max [0.169]

                              10yr 4320min max [0.122]
                        2.2

                        2.0

                        1.8

                        1.6
Basin:Basin Stage [m]




                        1.4

                        1.2

                        1.0

                        0.8

                        0.6

                        0.4

                        0.2

                        0.0
                                                             3AM                                         6AM                                     9AM
                   1 Thu Jan 2015                                                   Time


[OCR of page images]
a
10yr 10min max [1.532]

10yr 30min max [2.003]

10yr 120min max [1.268]

10yr 1080min max [0.317]
Lt

10yr 4320min max [0.122]

a
IN

-
N

P
oO

ad
0

 

Basin:Basin Stage [m]

oO
m

 

oO
IN

oO
Nh

0.0

1 Thu Jan 2015

 

Tank [ALL STORMS]

Basin:Basin Stage

10yr 15min max [1.835] 10yr 20min max [1.924]

10yr 45min max [1.681]

10yr 60min max [1.864]

10yr 180min max [1.002] 10yr 360min max [0.566]

10yr 1440min max [0.339] 10yr 2160min max [0.178]

 

 

i
10yr 25min max [2.152]

10yr 90min max [1.364]
10yr 720min max [0.609]

10yr 2880min max [0.169]

 

9AM

= eee ——
ee T ame
3AM 6AM
Time

Page 63

                                                                      Tank [ALL STORMS]
                                                                           Basin:Basin Storage

                                10yr 10min max [13.663]    10yr 15min max [16.374]     10yr 20min max [17.163]   10yr 25min max [19.192]

                                10yr 30min max [17.865]    10yr 45min max [14.993]     10yr 60min max [16.634]   10yr 90min max [12.174]

                                10yr 120min max [11.308]   10yr 180min max [8.940]     10yr 360min max [5.045]   10yr 720min max [5.430]

                                10yr 1080min max [2.830]   10yr 1440min max [3.032]   10yr 2160min max [1.586]   10yr 2880min max [1.507]

                                10yr 4320min max [1.085]


                           18

                           16
Basin:Basin Storage [m3]




                           14

                           12

                           10

                            8

                            6

                            4

                            2

                           0
                           1 Thu                                3AM                                 6AM                                 9AM
                           Jan 2015                                               Time


[OCR of page images]
Basin:Basin Storage [m3]

Ee
SS

BR
NO

R
oO

BR
oO

BR
aD

©

0.
1 Thu 3AM 6AM 9AM

  

TN ee \
OW N SS = : —<—=_

 

Tank [ALL STORMS]

Basin:Basin Storage
a a Pe

10yr 10min max [13.663] 10yr 15min max [16.374] 10yr 20min max [17.163] 10yr 25min max [19.192]

10yr 30min max [17.865] 10yr 45min max [14.993] 10yr 6GOmin max [16.634] 10yr 90min max [12.174]

= Fe
10yr 120min max [11.308]  10yr 180min max [8.940] 10yr 360min max [5.045] 10yr 720min max [5.430]
a
10yr 1080min max [2.830] 10yr 1440min max [3.032] 10yr 2160min max [1.586] 10yr 2880min max [1.507]
a

10yr 4320min max [1.085]

 

 

 

“SS ___—

 

Jan 2015 Time

 

Page 64

                                                              15104 - SBSMP/0
                                                                       Page 31




                                               APPENDIX J


  XP-RAFTS POST DEVELOPMENT MITIGATED MODEL MAJOR STORM
                                                 RESULTS




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 65

                                                               LPD [ALL STORMS]
                                                                         Total Flow

                           100yr 10min max [0.091]     100yr 15min max [0.099]          100yr 20min max [0.095]    100yr 25min max [0.115]

                           100yr 30min max [0.108]     100yr 45min max [0.084]          100yr 60min max [0.109]    100yr 90min max [0.064]

                          100yr 120min max [0.061]    100yr 180min max [0.054]      100yr 360min max [0.043]      100yr 720min max [0.045]

                          100yr 1080min max [0.034]   100yr 1440min max [0.035]     100yr 2160min max [0.025]     100yr 2880min max [0.024]

                          100yr 4320min max [0.019]

                   0.11
                   0.10
                   0.09

                   0.08
Total Flow [cms]




                   0.07

                   0.06
                   0.05

                   0.04
                   0.03

                   0.02
                   0.01

                   0.00
                      1 Thu                                3AM                                       6AM                                 9AM
                       Jan 2015                                                  Time


[OCR of page images]
0.00

LPD [ALL STORMS]
Total Flow

100yr 10min max [0.091] 100yr 15min max [0.099] 100yr 20min max [0.095] 100yr 25min max [0.115]

100yr 30min max [0.108] 100yr 45min max [0.084] 100yr 60min max [0.109] 100yr 90min max [0.064]

 

 

=x Pe

100yr 120min max [0.061] 100yr 180min max [0.054] 100yr 360min max [0.043] 100yr 720min max [0.045]
Le

100yr 1080min max [0.034] 100yr1440min max [0.035] 100yr 2160min max [0.025] 100yr 2880min max [0.024]

100yr 4320min max [0.019]

 

 

 

1 Thu 3AM 6AM 9AM

Jan 2015 Time

Page 66

                                                                        Tank [ALL STORMS]
                                                                              Basin:Basin Outflow

                                    100yr 10min max [0.076]     100yr 15min max [0.076]          100yr 20min max [0.081]    100yr 25min max [0.084]

                                    100yr 30min max [0.085]     100yr 45min max [0.071]          100yr 60min max [0.083]    100yr 90min max [0.054]

                                   100yr 120min max [0.050]    100yr 180min max [0.045]      100yr 360min max [0.036]      100yr 720min max [0.038]

                                   100yr 1080min max [0.028]   100yr 1440min max [0.030]     100yr 2160min max [0.021]     100yr 2880min max [0.021]

                                   100yr 4320min max [0.016]

                            0.08

                            0.07
Basin:Basin Outflow [cms]




                            0.06

                            0.05

                            0.04

                            0.03

                            0.02

                            0.01

                            0.00
                                                                    3AM                                       6AM                                 9AM
                       1 Thu Jan 2015                                                     Time


[OCR of page images]
0.08

o o o o o
2 2S 2 2° O°
@ BK a o x

Basin:Basin Outflow [cms]

o
oO
N

0.01

0.00

 

Tank [ALL STORMS]

Basin:Basin Outflow
PC FC FCS

100yr 10min max [0.076] 100yr 15min max [0.076] 100yr 20min max [0.081] 100yr 25min max [0.084]

100yr 30min max [0.085] 100yr 45min max [0.071] 100yr 60min max [0.083] 100yr 90min max [0.054]

 

 

=x Pe
100yr 120min max [0.050] 100yr 180min max [0.045] 100yr 360min max [0.036] 100yr 720min max [0.038]
Le
100yr 1080min max [0.028] 100yr1440min max [0.030] 100yr 2160min max [0.021] 100yr 2880min max [0.021]
P|

100yr 4320min max [0.016]

 

 

1 Thu Jan 2015 Time

 

Page 67

                                                                    Tank [ALL STORMS]
                                                                           Basin:Basin Stage

                               100yr 10min max [2.461]     100yr 15min max [2.452]          100yr 20min max [2.485]    100yr 25min max [2.529]

                               100yr 30min max [2.529]     100yr 45min max [2.428]          100yr 60min max [2.533]    100yr 90min max [2.313]

                              100yr 120min max [2.125]    100yr 180min max [1.753]      100yr 360min max [1.128]      100yr 720min max [1.261]

                              100yr 1080min max [0.697]   100yr 1440min max [0.756]     100yr 2160min max [0.392]     100yr 2880min max [0.365]

                              100yr 4320min max [0.214]

                        2.5



                        2.0
Basin:Basin Stage [m]




                        1.5



                        1.0



                        0.5



                        0.0
                          1 Thu                                3AM                                       6AM                                     9AM
                           Jan 2015                                                  Time


[OCR of page images]
 

Tank [ALL STORMS]

Basin:Basin Stage

Pt | Pe
100yr 10min max [2.461] 100yr 15min max [2.452] 100yr 20min max [2.485] 100yr 25min max [2.529]
100yr 30min max [2.529] 100yr 4smin “max [2.428] 100yr 60min “max [2.533] 100yr 90min max [2.313]
100yr 120min max [2.125] 100yr 180min max [1.753] 100yr 36omin max [1.128] 100yr 720min max [1.261]
100yr 1080min max [0.697] 100yr 1a4omin max [0.756]  100yr 2160min max [0.392] 100yr 2880min max [0.365]
Pt

100yr 4320min max [0.214]

 

 

 

 

 

 

 

25

2.0 |
=
oO
Do
81.5
Y
<
WY
Oo
a
£10
WY
8 f

\
0.5 \
PAV ES NA \
(Ue \ \ LSe=— \__ — —> —
aaa ‘ T EEE ES
1 thu 3AM 6AM 9AM

Jan 2015 Time

 

Page 68

                                                                      Tank [ALL STORMS]
                                                                             Basin:Basin Storage

                                100yr 10min max [21.952]    100yr 15min max [21.873]           100yr 20min max [22.170]    100yr 25min max [22.559]

                                100yr 30min max [22.561]    100yr 45min max [21.661]           100yr 60min max [22.590]    100yr 90min max [20.636]

                                100yr 120min max [18.956]   100yr 180min max [15.636]          100yr 360min max [10.062]   100yr 720min max [11.251]

                                100yr 1080min max [6.214]   100yr 1440min max [6.743]          100yr 2160min max [3.502]   100yr 2880min max [3.256]

                                100yr 4320min max [1.907]

                           22

                           20

                           18
Basin:Basin Storage [m3]




                           16

                           14

                           12

                           10

                            8

                            6

                            4

                            2

                           0
                           1 Thu                                3AM                                           6AM                                      9AM
                            Jan 2015                                                    Time


[OCR of page images]
Basin:Basin Storage [m3]

 

 

 

 

 

 

 

 

 

Tank [ALL STORMS]

Basin:Basin Storage

 

 

 

 

 

 

Pe Pe Pe
100yr 10min max [21.952] 100yr 15min max [21.873] 100yr 20min max [22.170] 100yr 25min max [22.559]
100yr 30min max [22.561] 100yr 45min max [21.661] 100yr 60min max [22.590] 100yr 90min max [20.636]
;
100yr 120min max [18.956] 100yr 180min max [15.636] 100yr 360min max [10.062] 100yr 720min max [11.251]
Pe
100yr 1080min max [6.214] 100yr 1440min max [6.743] 100yr 2160min max [3.502] 100yr 2880min max [3.256]
,
100yr 4320min max [1.907]
22
20 \
18
16
14
12
10
ay yy
|
6 \
4 J aN
it A \
2] alan \ SK \
Ly \\ weet ee
0 VW ee eee i —
1 Thu 3AM 6AM
Jan 2015 Time

 

Page 69

                                                              15104 - SBSMP/0
                                                                       Page 32




                                             APPENDIX K


                            HYDRAULIC ENGINEERING PLANS




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Page 70

                                                                                                                                                                                                                                    Drainage Plan:


                                                                                                                                                                                                                                                                                                            *
                                                                                                                                                                                                                                    Fixtures:                               Loading Units:
                                                                                                                                                                                                                                                                       *                                         *
                                                                                                                                                                                                                                    Key Plan:




                                                                          CLASS 'C' GRATE



                                                                                                                                                                                                                                    This drawing is confidential and is not to be reproduced in any form
                                                                                                                                                                                                                                       as a whole or in part without the express written authority of
                                                                                                                                                                                                                                                     Plumbing Design & drafting pty ltd.
                                                                                                                                                                                                                                    note: symbols are drawn in the correct position but are not to scale

                                                                                            INCORPORATE REMAINING BACKFILL WITH                                                                                                     Drawing Style:
                                                                                            INSTALLATION OF SURROUNDING PAVEMENT
                                                                                            ENSURE GRATE IS FITTED TO RISER AND
           A
                                                                                            EXPANSION STRIP FITTED AROUND RISER RIM
                                                                                                                                                                                                                                         In strata water
                                                                                            (SEE V-GUARD INSTALLATION INSTRUCTIONS)



                                                                                            STD SERIES 600 PIT RISERS
                                                                                                                                                                                                   150Ø HOLDING WELL                     Out of strata
                                                                                                                                                                                                   WITH SS ACCESS COVER.                 drainage

                                                                                                                                                                        LIFT SHAFT
                                                                                                                                                                                                                                    North Point:
                                                                                                                                      FLOOR RL                                                                                                                 Design:     Richard Poole
                                                                                                                                      (SEE FLOOR PLANS)
                                                                                                                                                                                                                                                               Checked: Mark Laverick


                                                                                                                                                                                                                                                     N
                      SUGGEST POURING SURROUNDING BACKFILL 20
                                                                                                                                                                                                                                                               Drawn:      Juanita Tate
                      MPa CONCRETE TO MAX 120mm ABOVE                                       SELECTED OUTLET
                      V-GUARD TOP EDGE TO ENABLE REMOVAL OF                                 PIPE NOT SHOWN
                      INTERNAL BRACES (SEE INSTALLATION
                      INSTRUCTIONS) BEFORE COMPLETION OF
                      CONCRETE BACKFILL.                                                                                                                                                           NOTE:




                                                                                                                                                TO LIFT MANUFACTURES
                                                                                                                                                                                                                                    Issue     Date         Amendment                                      Int.   App.
                                                                                                                                                                                                   ALL JOINTS TO BE MADE
                                                                                                                                                                                                   WATERTIGHT.                       1        06.04.16 PRELIMINARY ISSUE                                  JT      RP




                                                                                                                                                    REQUIREMENTS
                                                                                                                                                     (ALLOW 1800)
                                                                                                                                                                                                   3OO X 300 GULLY WITH
                                                                                                                                                                                                   NON - SLIP GRATING




                                                                                                                                                                                            150Ø
                                                                                            CONCRETE SURROUND
                      50mm MIN THICK CONCRETE BLINDING
                      SLAB TO SET HEIGHT FOR UNIT
                                                                                                                                                                                     100Ø
                                                                                                                                                                                                   LEVEL INVERT TAPER M&F -SWJ
           A
                                                                                                                                                                                                   90° REDUCING JUNCTION-SWJ




                                                                                                                                                        600
                                                                                                                                                                                                   PIPE SOCKET F&F WITH CAP (RRJ
                                                                                                                                                                                                   SOCKET x SWJ SOCKET)

                                                                                                                                                                                                   ENSURE PIPEWORK LOCATED WITHIN
                                                                                                                                                                                                   CONCRETE STRUCTURE IS COATED
                                                                SECTION A-A                                                                                                                        WITH 'BONDCRETE' & SAND
                                                                                                                                                                                                   PUSH ON CAP -SWJ
TOP VIEW
                                                                                                                                                                                                   PUDDLE FLANGE

                                                                                                                                                                                                                                    Architect:
       EVERHARD V-GUARD 600 AP FITTED WITH RISERS                                                                                                            LIFT PIT HOLDING WELL
       DETAIL                                                                                                                                                 NOT TO SCALE

       NOT TO SCALE

                                                                                                                                                                                                                                            Archi tec ture    L an dscape       I n te ri or s

                                                                                                                                                                                                                                     37 Aerodrome Rd Maroochydore Qld
                                                                                                                                                                                                                                     P.O. Box 154 Cotton Tree Qld 4558                  phone        07 5443 3200
                                                                                                                                                                                                                                     email [email protected]          fax          07 5443 4030


                                                                                                                                                                                                                                    Hydraulic Consultant:




                                                                                                                                                                                                                                                                                                      AHSCA
                                                                                                                                                                                                                                     ASPE



                                                                                                                                                                                                                                                  (07) 5437 7660 | [email protected]
                                                                                                                                                                                                                                               4/34 Technology Drive, Warana. Qld. 4575
                                                                                                                                                                                                                                                   PO Box 1269 Buddina. Qld. 4575
                                                                                                                                                                                                                                    ACN. 117159243 | ABN. 62117159243 | QBCC Licence No. 1106752



                                                                                                                                                                                                                                    Project:




                                                                                                                                                                                                                                         43-45 ELANDA STREET,
                                                                                                                                                                                                                                         SUNSHINE BEACH, QLD, 4567
                                                                                                                                                                                                                                    Drawing Title:


                                                                                                                                                                                                                                    HYDRAULIC SERVICES
                                                                                                                                                                                                                                    DETAILS




                                                                                                                                                                                                                                    Date:                     Scale:                             Sheet:
                                                                                                                                                                                                                                     OCTOBER 2015             (A1) 1:100     (A3) 1:200             11 OF        11
                                                                                                                                                                                                                                    Job No:                    Disc:       Dwg No:         Stage:              Issue:


                                                                                                                                                                                                                                    15094 - H - 11                                          PR 1

                                                                                                                                                                                                                                                                                                 ORIGINAL SIZE: A1

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15104 - SBSMP - Rev 0.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.