Council archive · source document
15104 - SBSMP - Rev 0 · MCU13/0215
Attached to the e-mail OPW16/0097 - Operational Works Application.
Attached to the e-mail Operational Works Application – OPW16/0253.
SITE BASED STORMWATER
MANAGEMENT PLAN
RESIDENTIAL DEVELOPMENT AT
43 ELANDA STREET
SUNSHINE BEACH
Prepared for
Altum Constructions
Attention: Rob McCready
Document Reference
15104 - SBSMP/0
Record of Issue:
Issue Status Author Date Checked Date Authorised Date
Aaron 20 April Christopher 3 May Henry Morgan 4 May
0 For Approval
Woods 2016 Godwin 2016 RPEQ 11950 2016
This investigation and report has been authorised by Mr Henry Morgan, a Director of Morgan
Consulting Engineers Pty Ltd.
Henry J Morgan RPEQ 11950 Wednesday, 4 May 2016
D:\JOBS\15-Jobs\15104 - 43 Elanda Street, Sunshine Beach\Civil\Reports\SBSMP\Working\15104 - SBSMP.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 69 pages
Page 2
15104 - SBSMP/0
Page 2
Table of Contents
1 INTRODUCTION ............................................................................................ 3
2 EXISTING SITE CONDITIONS .............................................................................. 4
2.1 The Site ............................................................................................... 4
2.2 Surrounding Area .................................................................................... 4
3 PROPOSED DEVELOPMENT ............................................................................... 5
4 EXISTING STORMWATER DRAINAGE SYSTEM........................................................... 6
4.1 Existing Infrastructure .............................................................................. 6
4.2 Existing Drainage Patterns ......................................................................... 7
4.3 Legal Point of Discharge ........................................................................... 7
5 STORMWATER QUANTITY ................................................................................ 8
5.1 Proposed Drainage Patterns ....................................................................... 8
5.2 Rational Method Calculations ..................................................................... 8
5.3 XP-RAFTS Detention Analysis ..................................................................... 10
5.4 Comparison of Peak Flows at Legal Point of Discharge ...................................... 15
6 STORMWATER QUALITY ................................................................................. 17
6.1 Construction Phase................................................................................. 17
6.2 Operational Phase .................................................................................. 19
7 CONCLUSION .............................................................................................. 21
Appendix A EXISTING SITE SURVEY ..................................................................... 22
Appendix B DEVELOPMENT PLANS ...................................................................... 23
Appendix C DBYD DATA .................................................................................. 24
Appendix D RATIONAL METHOD CALCULATIONS ..................................................... 25
Appendix E XP-RAFTS PRE DEVELOPMENT MODEL RESULTS ........................................ 26
Appendix F XP-RAFTS POST DEVELOPMENT UNMITIGATED MODEL RESULTS ..................... 27
Appendix G PRECAST DETENTION TANK DETAILS .................................................... 28
Appendix H DETAILED CIVIL ENGINEERING PLANS ................................................... 29
Appendix I XP-RAFTS POST DEVELOPMENT MITIGATED MODEL MINOR STORM RESULTS ...... 30
Appendix J XP-RAFTS POST DEVELOPMENT MITIGATED MODEL MAJOR STORM RESULTS ...... 31
Appendix K HYDRAULIC ENGINEERING PLANS ........................................................ 32
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 3
15104 - SBSMP/0
Page 3
1 INTRODUCTION
This Site Based Stormwater Management Plan (SBSMP) has been prepared for the Residential
Development at 43 Elanda Street, Sunshine Beach.
This SBSMP has been prepared to investigate the effects the development will have on
stormwater quantity and quality.
The objective of this SBSMP is to ensure that there is no adverse impact by the development on
the environmental value of the receiving waters during the construction and operational phases
of the development. This SBSMP will also provide recommendations to ensure that the post
development peak outflow conditions are not greater than the pre development peak outflow
conditions.
In order to achieve this objective, this SBSMP:
1. Describes the environmental setting of the development site and precinct;
2. Describes the nature of the proposed development as it relates to stormwater quality;
3. Calculates the peak flows for both pre and post development conditions;
4. Calculates the detention volume required to achieve the pre development outflow in
the post development state;
5. Identifies potential sources of contaminants and describes the management techniques
designed to be employed on the site to achieve the water quality objectives; and
The proposed development has been assessed against the following guidelines and planning
documents:
1. State Planning Policy 2013 (SPP 2013) – Guidelines for Healthy Waterways;
2. Urban Stormwater Quality Planning Guidelines 2010;
3. The Queensland Urban Drainage Manual (QUDM); and
4. Noosa Shire Council (NSC) Planning Scheme Policy.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 4
15104 - SBSMP/0
Page 4
2 EXISTING SITE CONDITIONS
2.1 The Site
The site, described as Lot 1 on SP230070 has an approximate area of 1,468m2 (or 0.147ha) in
area and is zoned as Medium Density Residential. The site is currently vacant and covered in
long grass. The site has a grade of approximately 15.6% and slopes from the south west
boundary to the north east boundary.
Refer to Figure 2.1 for a locality plan and Appendix A for the detailed site survey plan.
N
The Site
Figure 2.1 – Locality Plan
2.2 Surrounding Area
The site is located within the limits of the Noosa Shire Council. The area surrounding the site is
classified as low-medium density urban residential according to the Noosa Planning Scheme
Policies.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 5
15104 - SBSMP/0
Page 5
3 PROPOSED DEVELOPMENT
The proposed development will involve the construction of a high density residential
development, which will include:
1. A four storey apartment building containing 7 units in total;
2. An underground basement for vehicular manoeuvring and parking;
3. Access to Elanda Street via a single driveway crossover; and
4. Dedicated landscaping throughout the site.
Refer to Figure 3.1 for an elevation of the proposed development and Appendix B for the
development plans.
Figure 3.1 – Elevation of the Proposed Development
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 6
15104 - SBSMP/0
Page 6
4 EXISTING STORMWATER DRAINAGE SYSTEM
4.1 Existing Infrastructure
Data obtained from Dial Before you Dig (DBYD) and the detailed survey plan indicates the
following existing drainage infrastructure:
1. Catchment pit, manhole and stormwater pipe located approximately 60m south east of
the site.
Refer to Figure 4.1 for an existing stormwater drainage schematic, Appendix A for the detailed
survey and Appendix C DBYD data.
N
The Site
Stormwater Manhole
Legend
Flow Path:
Figure 4.1 – Stormwater Drainage Schematic
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 7
15104 - SBSMP/0
Page 7
4.2 Existing Drainage Patterns
As the existing site falls away from Elanda Street surface runoff currently sheet flows towards
the rear boundary of the site and into the neighbouring lot to the north east. There is no
existing drainage infrastructure located at the rear boundary of the site collecting this surface
runoff.
There are no external catchments contributing to runoff through the site.
4.3 Legal Point of Discharge
If the proposed development maintains pre development flow conditions then the rear
boundary of the site is considered the legal point of discharge. As there is no existing drainage
infrastructure located at the rear boundary of the site runoff from the proposed development
can only be discharged to the ground to mimic the existing drainage patterns.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 8
15104 - SBSMP/0
Page 8
5 STORMWATER QUANTITY
A roof and allotment drainage system is to be designed to comply with:
1. AS/NZS 3500.3:2003 - Plumbing and Drainage Part 3: Stormwater Drainage;
2. The Queensland Urban Drainage Manual (QUDM), and;
3. Noosa Shire Council’s Planning Scheme Policies.
5.1 Proposed Drainage Patterns
The proposed drainage patterns are as follows:
Roof Catchment:
1. Runoff from the roof catchment will flow via downpipes to an internal drainage
network.
2. The internal drainage network will then convey stormwater runoff to the end of line
stormwater detention tank.
Ground Catchment:
1. Surface runoff from the landscaping and pavement areas will be collected by field inlets
connected to the internal drainage network.
2. The internal drainage network will then convey stormwater runoff to the end of line
stormwater detention tank.
Stormwater will then discharge from the tank at pre-development flow rates to surcharge pits
located within a swale drain at the rear boundary of the site. Overflow from the detention tank
will discharge (at pre-development flow rates) directly to the swale drain.
Once the surcharge pits and swale drain begin to overtop stormwater will then sheet flow
across the rear boundary of the site as per the existing drainage pattern at pre development
flow rates.
5.2 Rational Method Calculations
5.2.1 Design Storms
The following design storms have been adopted for the development in accordance with Section
7.3 of the QUDM and Noosa Shire Council’s Planning Scheme Policy (PSP06 – Section 4):
1. Minor Drainage System: 10 year ARI statistical flood (Q10 storm), and;
2. Major Drainage System: 100 year ARI statistical flood (Q100 storm).
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 9
15104 - SBSMP/0
Page 9
5.2.2 Rainfall Intensity
Rainfall intensities for this study were obtained from the Bureau of Meteorology.
5.2.3 Times of Concentration
Times of concentration (tc) were calculated as defined in Section 4.6 of the QUDM. Refer to
Appendix D for the adopted tc’s and Appendix D for tc calculations.
Table 5.1 - Adopted tc values
Pre Development Post Development
tc (mins) tc (mins)
10.1 5.0
5.2.4 Runoff Coefficients
The 10 year runoff coefficient’s (C10) were determined as defined in Section 4.5 of the QUDM.
Refer to Appendix D below for the adopted C10 values.
Table 5.2 – Adopted C10 Values
Fraction
Property State impervious (fi) C10
Pre development 0.00 0.67
Post development 0.65 0.82
5.2.5 Peak Flows
Refer to Table 5.3 for a summary of the predicted minor and major discharge rates for pre and
post development conditions and Appendix D for the Rational Method calculations.
Table 5.3 – Pre and Post-Development Peak Flows
Property State Q10 (m3/s) Q100 (m3/s)
Pre development 0.044 0.077
Post development 0.069 0.121
It is evident that there will be an increase between the pre development and post development
peak discharge flow rates. Therefore onsite stormwater detention will be required to mitigate
the increased discharge flow rates to ensure pre development flow rates can be achieved.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 10
15104 - SBSMP/0
Page 10
5.3 XP-RAFTS Detention Analysis
XP-RAFTS has been used to model the peak discharges from the site under both existing (pre
development) and proposed (post development) conditions, and to determine the sizing
requirements of the detention basin as outlined in Section 5 of the QUDM.
5.3.1 Pre Development
Figure 5.1 shows the XP-RAFTS model used to represent the pre development site conditions
and Table 5.4 summarises the input parameters used in the model for the pre developed site
scenario.
Figure 5.1 - XP-RAFTS Pre Development Model
Table 5.4 - XP-RAFTS Source Node Parameters – Pre Development
Pre Development
Pre-D Site
Parameter
Sub Catchment 1 Sub Catchment 2
(Pervious) (Impervious)
Initial Loss (mm) 10 N/A
Continuous Loss (mm/hr) 2.5 N/A
Catchment Area (ha) 0.147 N/A
Impervious Percentage 0% N/A
Vectored Slope 16.8% N/A
Manning's "n" 0.045 N/A
IFD Coefficients Sunshine Beach N/A
Storage Coefficient N/A N/A
Table 5.5 summaries the pre development peak flows calculated by XP-RAFTS for a range of
design storms. For reference, the peak flows calculated using the Rational Method have also
been provided in Table 5.5.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 11
15104 - SBSMP/0
Page 11
Table 5.5 – Pre Development Peak Discharge (XP-RAFTS and Rational Method)
XP-RAFTS RATIONAL METHOD
ARI
Pre Development Peak Discharge Pre Development Peak Discharge
(years)
(m3/s) (m3/s)
0.042
1 0.020
(1yr 25min storm)
0.060
2 0.027
(2yr 25min storm)
0.079
5 0.037
(5yr 25min storm)
0.089
10 0.044
(10yr 25min storm)
0.102
20 0.052
(20yr 25min storm)
0.107
50 0.067
(50yr 15min storm)
0.120
100 0.077
(100yr 15min storm)
For pre development peak flow rate hydrographs from XP-RAFTS refer to Appendix E.
5.3.2 Post Development Unmitigated
Figure 5.2 shows the XP-RAFTS model used to represent the post development unmitigated site
conditions and Table 5.6 summarises the input parameters used in the model for the post
development unmitigated site scenario.
Figure 5.2 - XP-RAFTS Post Development Unmitigated Model
Table 5.6 – XP-RAFTS Source Node Parameters – Post Development Unmitigated
Post Development
Post-D Unm
Parameter
Sub Catchment 1 Sub Catchment 2
(Pervious) (Impervious)
Initial Loss (mm) 0 0
Continuous Loss (mm/hr) 2.5 0
Catchment Area (ha) 0.051 0.096
Impervious Percentage 0% 100%
Vectored Slope 10% 5%
Manning's "n" 0.03 0.015
IFD Coefficients Sunshine Beach Sunshine Beach
Storage Coefficient N/A N/A
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 12
15104 - SBSMP/0
Page 12
Table 5.7 summaries the post development unmitigated peak flows calculated by XP-RAFTS for
a range of design storms. For reference, the peak flows calculated using the Rational Method
have also been provided in Table 5.7.
Table 5.7 – Post Development Peak Discharge (XP-RAFTS and Rational Method)
XP-RAFTS RATIONAL METHOD
ARI Post Development Peak Discharge Post Development Peak Discharge
(years) (Unmitigated) (Unmitigated)
(m3/s) (m3/s)
0.052
1 0.032
(1yr 25min storm)
0.066
2 0.043
(2yr 25min storm)
0.082
5 0.059
(5yr 25min storm)
0.091
10 0.069
(10yr 25min storm)
0.104
20 0.083
(20yr 25min storm)
0.111
50 0.105
(50yr 20min storm)
0.122
100 0.121
(100yr 20min storm)
As seen in Table 5.5 and Table 5.7 there will be an increase in peak flows from pre to post
development conditions as a result of the proposed development. Consequently on-site
detention will be required.
For XP-RAFTS post development unmitigated peak flow rate hydrographs refer to Appendix F.
It is noted that the percentage increase in peak flows for the Rational Method are in the order
of 36% and for the Laurenson Method (used in XP-RAFTS) 2%-19% for minor storms and 2%-4% for
major storms. This difference can be explained by the fact that XP-RAFTS is a non-linear
routing hydrologic model which calculates flood hydrographs from storm rainfall hyetographs.
The Laurenson Method also specifically accounts for slope and other parameters while allowing
for storage within the catchment. The Rational Method combines parameters into one runoff
coefficient used to calculate the peak flows and does not provide for specific parameters (e.g.
slope, manning’s “n” etc).
5.3.3 Post Development Mitigated
Stormwater detention will need to be provided to ensure the pre development peak flows listed
in Table 5.5 are not exceeded for the proposed development. The detention storage is to be
implemented as part of the internal stormwater drainage network. The legal point of discharge
described in Section 4.3 will remain.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 13
15104 - SBSMP/0
Page 13
Figure 5.3 shows the XP-RAFTS model used to represent the post development mitigated site
scenario for the proposed development. Node “Post-D Mit” represents the area of the proposed
development (all roof and surface areas) discharging to the detention tank, “Post-D Unm”
represents the area of the proposed development not discharging to the detention tank and
“LPD” represents the legal point of discharge. Mitigation has been implemented in the form of
a detention tank at the node labelled “Tank” in the XP-RAFTS model.
Figure 5.3 - XP-RAFTS Post Development Mitigated Model
As the roofwater/internal drainage network has been designed to convey stormwater up to the
Q20 storm event, a bypass link has been included in the XP-RAFTS model to divert all flows
exceeding the roofwater drainage capacity to the legal point of discharge as this runoff cannot
be captured and detained in the detention tank. The bypass link diverts discharge greater than
the post development Q20 peak flow rate of 0.088m3/s from node “Post-D” to node “LPD”. The
bypass link is labelled “Diver1” in the XP-RAFTS model.
Table 5.8 summarises the input parameters used in the model for the post developed mitigated
site scenario. No source node parameters were used for the “Tank” node and the “LPD” node.
Table 5.8 – XP-RAFTS Source Node Parameters – Post Development Mitigated
Post Development Mitigated
Post-D Mit Post-D Unm
Parameter
Sub Catchment 1 Sub Catchment 2 Sub Catchment 1 Sub Catchment 2
(Pervious) (Impervious) (Pervious) (Impervious)
Initial Loss (mm) 0 0 0 N/A
Continuous Loss (mm/hr) 2.5 0 2.5 N/A
Catchment Area (ha) 0.028 0.096 0.023 N/A
Impervious Percentage 0% 100% 0% N/A
Vectored Slope 5% 5% 15% N/A
Manning's "n" 0.03 0.015 0.03 N/A
IFD Coefficients Sunshine Beach Sunshine Beach Sunshine Beach N/A
Storage Coefficient N/A N/A N/A N/A
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 14
15104 - SBSMP/0
Page 14
5.3.4 On-Site Detention
In order for the post development stormwater discharge conditions to match pre development
conditions for all storm events, it is proposed to provide a total of 22.59m3 of stormwater
storage via a semi-submerge 23,000L (or 23m3) pre-cast concrete detention tank from All Cast
Pre Cast. This detention tank system will over mitigate captured post development flows from
the development to ensure the combined post development discharge from the site does not
exceed pre development flows. It is proposed to locate the detention tank at the southern
corner of the site under the raised deck area. The proposed detention tank will have the
following features:
Tank external diameter = 3.48m;
Tank internal diameter = 3.37m
Tank Overall height = 2.8m;
Tank internal height = 2.6m;
Tank capacity = 23.19m3
A 140mm diameter orifice place over a 150mm diameter outlet pipe located at the base
of the tank in order to discharge minor flow (at pre development flow rates) to a
surcharge pits before discharging to the legal point of discharge (LPD);
A 225mm diameter high flow pipe located 2.3m above the base of the tank in order to
discharge overflow (at pre development flow rates) to the proposed swale drain before
discharging to the LPD.
Refer to Appendix G for the typical pre-cast tank details from All Cast Pre-Cast and Appendix
H for the detailed civil engineering plans.
5.3.5 Detention Basin Analysis
Table 5.9 provides a summary of the detention tank results in the XP-RAFTS model for the post
development mitigated site scenario. The results show detention outflow (Tank Outflow), the
storage depth within the tank (Tank Stage) and detention volume reached (Tank Storage) to
ensure that pre development flow conditions are achieved for all storms.
Refer to Appendix I and Appendix J for the XP-RAFTS post development mitigated minor and
major storm detention tank model results summarised in Table 5.9.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 15
15104 - SBSMP/0
Page 15
Table 5.9 – XP-RAFTS Post Development Detention Basin Summary
Post Development Mitigated (Detention Tank)
ARI
(years) Tank Outflow Tank Stage Tank Storage1
(m3/s) (m) (m3)
0.033 0.910 8.123
1
(1yr 25min storm) (1yr 25min storm) (1yr 25min storm)
0.039 1.335 11.912
2
(2yr 25min storm) (2yr 25min storm) (2yr 25min storm)
0.046 1.844 16.453
5
(5yr 25min storm) (5yr 25min storm) (5yr 25min storm)
0.050 2.152 19.192
10
(10yr 25min storm) (10yr 25min storm) (10yr 25min storm)
0.073 2.442 21.787
20
(20yr 25min storm) (20yr 25min storm) (20yr 25min storm)
0.084 2.505 22.345
50
(50yr 25min storm) (50yr 25min storm) (50yr 25min storm)
0.084 2.533 22.590
100
(100yr 60min storm) (100yr 60min storm) (100yr 60min storm)
Notes:
1. Additional detention volume will be achieved in the stormwater pipes.
2. All runoff from roof and surface areas of the proposed development is being directed to and detained
within the detention tank.
5.4 Comparison of Peak Flows at Legal Point of Discharge
Table 5.10 below provides a comparison of the pre development and post development
(mitigated) peak flows at the legal point of discharge (LPD) for the proposed development.
Table 5.10 – Comparison of Peak Flows at the LPD
XP-RAFTS
XP-RAFTS Difference
ARI Post Developed Flows
Pre Developed Flows
(years) at LPD (Mitigated)
(m3/s) (m3/s) %
(m3/s)
0.042 0.040
1 -0.002 -4.8
(1yr 25min storm) (1yr 25min storm)
0.060 0.049
2 -0.011 -18.3
(2yr 25min storm) (2yr 25min storm)
0.079 0.058
5 -0.021 -26.6
(5yr 25min storm) (5yr 25min storm)
0.089 0.063
10 -0.026 -29.2
(10yr 25min storm) (10yr 25min storm)
0.102 0.089
20 -0.013 -12.8
(20yr 25min storm) (20yr 25min storm)
0.107 0.102
50 -0.004 -4.7
(50yr 15min storm) (50yr 25min storm)
0.120 0.115
100 -0.005 -4.2
(100yr 15min storm) (100yr 25min storm)
Notes:
1. Additional detention volume will be achieved in the stormwater pipes.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 16
15104 - SBSMP/0
Page 16
The XP-RAFTS hydraulic modelling has demonstrated that the proposed mitigation implemented
will maintain pre development flows (or less) for all design storms at the LPD. Refer to
Appendix I and Appendix J for the XP-RAFTS post development mitigated minor and major
storm peak flows at the LPD, as summarised in Table 5.10 above.
Refer to Appendix H for the detailed civil engineering plans of the proposed development.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 17
15104 - SBSMP/0
Page 17
6 STORMWATER QUALITY
The following section of this report will outline the potential contaminants and proposed
solutions to be incorporated during the construction and operation of this development.
6.1 Construction Phase
Sediment generated during the construction phase shall be dealt with in accordance with the
Erosion and Sediment Control Plan prepared by Morgan Consulting Engineers and kept on site
during the construction phase. Refer to Appendix H for the Erosion and Sediment Control plan.
Potential sources of contaminants identified for the construction phase of the development are
outlined in Table 6.1 together with proposed stormwater quality improvement devices,
management and maintenance procedures.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 18
15104 - SBSMP/0
Page 18
Table 6.1 - Potential Contaminants and Proposed Treatments
Proposed Treatment
Management /
Pollutant Potential Source Device and Maintenance
Maintenance Procedures
Procedure
Sediment & Excavated material, Provision of sediment and Sand filled filter socks.
Eroded fill material, silt barriers to the site Removal of excess
material exposed ground, drainage entry and exit sand/silt build up at
Stockpiles of points. regular intervals and after
material. every storm.
Dust Stockpiles of Covering the material or Coverage of material with
material, exposed wetting it down at regular plastic, geotextile, surface
ground. intervals. binding agents or regular
watering.
Litter Refuse generated by Construction waste is to Industrial bin is to be
staff. be cleaned off the site provided within the
area and installed into an construction area - to be
industrial bin then emptied on at least a
removed by a refuse weekly basis.
collection contractor.
Concrete Washing of concrete Provision of a closed area Liquids to be removed by a
trucks/tools to onsite for washing off of waste collection
remove wet/unused concrete slurries. contractor. Solids to be
concrete. placed into a refuse bin.
Surfactants Washing down No cleaning of vehicles Monitoring & prevention
(detergents) operations on will be permitted on site.
hardstand area using
detergents.
Chemical Typically this may Where spills occur, the A temporary containment
(Paints, occur due to spillage containment area is to area. This is to be
thinners etc.) of product. stop escape. The material impermeable and of a size
is to be treated (as to permit mixing/transfer,
required) and removed and with a storage volume
and cleaned by a licensed of twice the largest
contractor. container used.
Minor spillage outside this Treatment of spills is to
area shall be cleaned up occur on site. No
with cloths and disposed discharge of treated water
of to waste via the to the stormwater system
industrial bin. is to occur without council
approval. Incidents are to
be reported to the EPA.
Wastewater Spillage from the A licensed contractor shall No leakage is to be
relocation of the remove any residue permitted to enter the
existing sewerage sewage from unused pipes groundwater or discharge
reticulation. and contaminated soils are to the stormwater
to be disposed of via the system.
industrial bin.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 19
15104 - SBSMP/0
Page 19
6.2 Operational Phase
The development has been assessed against the latest State Planning Policy 2014 (SPP 2014).
The proposed development will entail material change of use for urban purposes, which will
involve a land area less than 2,500m2. Consequently, State Planning Policy 2014 (SPP 2014) is
not triggered.
The proposed development works are considered 'Low Risk' with respect to pollutants generated
during the operational phase, therefore it is recommended that best management practices be
applied, in accordance with the NSC's water quality guidelines.
Pollutants that are likely to be generated by the development and their likely treatment
methods are listed in Table 6.2 below. The shaded pollutants are considered to be the key
pollutants and will be targeted for treatment.
Table 6.2 - Potential Contaminants and Proposed Treatments - Operational phase
Residential Acceptable Treatment Examples
Pollutant
Development
Litter Yes Bins, litter baskets, buffer strips and
GPT’s
Sediment Yes Swales, sedimentation basins, ponds
and GPT’s
Oxygen demanding substances (organic No N/A
and chemical matter)
Nutrients (N and P) Possible Rainwater tank first flush, bio-
retention basins, infiltration trench.
Pathogens / Faecal coliforms (bacteria No N/A
and viruses)
Hydrocarbons (including oil & grease) Yes Swales, bio-retention basins,
infiltration trench, oil and grease
separators and GPT’s
Heavy metals (often associated with No N/A
fine sediment)
Surfactants (detergents from car Possible N/A
washing)
Organochlorines & organophosphates No N/A
(pesticides, herbicides)
Thermal pollution (heat) No N/A
pH altering substances No N/A
Based on the above potential contaminants it is proposed to provide a roofwater drainage
system fitted with a ‘first flush’ devise to treat runoff from the roof area. The ‘first flush’
system is designed to capture a predefined volume of runoff (Q3 month) and divert it to
landscaping to provide primary and tertiary treatment. Flows which exceed the ‘first flush’
system will be diverted directly to the detention tank. Refer to the hydraulic consultants
drawings for details.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 20
15104 - SBSMP/0
Page 20
The majority of the site is covered by roof catchment however the hardstand driveway
pavement along the south western boundary will be exposed therefore hydrocarbons are likely
to be generated. An Everhard V-Guard 600 Gross Pollutant Trap (GPT) has been specified in the
hardstand pavement area to pick up any litter, sediment and hydrocarbons within the
stormwater runoff.
Refer to Appendix K for the hydraulic consultant’s drawings for details of the GPT.
Refer to Appendix H for the detailed civil engineering plans.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 21
15104 - SBSMP/0
Page 21
7 CONCLUSION
The Residential Development at 43 Elanda Street, Sunshine Beach has been assessed for its
impact on the quantity and quality of stormwater drainage.
As there is no existing drainage infrastructure located in close proximity of the site runoff from
the proposed development can only be discharged to the ground as existing. It has been
established that the rear boundary of the site is considered the legal point of discharge.
Mitigation of increased stormwater runoff from the proposed site is required in order for the
post development stormwater discharge conditions to match the pre development conditions.
With the aid of XP-RAFTS, as recommended in the QUDM, a detention volume requirement of
22.59m3 has been calculated in order to detain stormwater runoff from the proposed
development up to a Q100 storm event. This storage volume shall be provided within a 23,000L
semi-submerged pre-cast detention tank located at the southern corner of the development
under the raised deck. This report has demonstrated that the proposed mitigation measure
(detention volume of 22.59m3) will ensure pre development flow conditions are maintained.
Sediment generated during the construction phase shall be dealt with in accordance with the
Erosion and Sediment Control Plan to be maintained by Morgan Consulting Engineers and kept
on site during the construction phase.
As the development entails operational works for mixed use purposes, which does not involve a
land area greater than 2,500m2, the State Planning Policy 2014 (SPP 2014) is not triggered. The
proposed development works are considered 'Low Risk' with respect to pollutants generated
during the operational phase, therefore best management practices will be applied, in
accordance with the NSC's water quality guidelines.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 22
15104 - SBSMP/0
Page 22
APPENDIX A
EXISTING SITE SURVEY
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 23
NOTES (1) This plan was prepared for the purpose and exclusive use of CP ALTUM CONSTRUCTIONS and their other professional advisers and is not to be used for any other purpose or by any other person or BUPI06878 corporation. Roof Gutter RL 58./ JFP URBAN CONSULTANTS PTY LTD accepts no responsibility for 4 Storey Buildin any loss or damage arising to any person or corporation who may Basement Level RL 46.3 (Approx) y 9 387 use or rely on this plan in contravention of these terms. (2) The title boundaries shown on this plan were not marked at 1 Lower Level. RP48i2 the time of survey and have been determined from plan Wo. ™~\ dimensions only and not by field survey. Pe | wx ub ee — = _ Sf \WH = (3) Services shown hereon have been located where possible by 55.67 ~*~ field survey. If not able to be so located, services have been plotted from the records of the relevant authorities where HOOP PINE 43°00'00” available and have been noted accordingly on this plan. However, 47.47 45.69 Wolf the information shown on these records pertinent to services . L L a location is indicative only and sometimes inadequate. ne 20 (4) Prior to any demolition, excavation or construction on the site, the relevant authority should be contacted for possible location of further underground services and detailed locations of all services. Upper Level Power pole WAT 0.50808 4 x 49.94 x 43.90 i i (5) Spot heights and contours are representative of the topographical terrain at time of survey, 26/06/2015. 49.355 x 48.59 43.50 (7) Trees shown on this plan have been located only where the trunk diameter at breast height (DBH) is 300mm or greater. Tree types are estimated and tree sizes are approximate only. If accurate identification of tree types is to be relied upon for any purpose, then all trees shown will require on site verification by a MANGO 0.30707 suitably qualified expert. Xe, 151.86 50.03 x g 3 | 49.27 x a (8) These notes form an integral part of this plan. If others use this g 1 . 44.53 information, they should be advised of its purpose and limitations. L g | Ney (9) This plan may not be reproduced unless these notes are § 1 H CP included. | Q 4 5029 | x49.91 SPAIOO/ BUP9546 Contour Interval: 0.5m o 5154 xy x 49.18 x %, * 2 x 44.46 ‘ x 50.52 . 49.51 n x 49.90 x 4B.85 5h 96 Isiix xf\ 9796 * a £15157 i \ Ss 43.24 Top Roof 52.8 la 95 451.58 \ suo \ 50.32 2 S & BR 7 52.01 Q g % 50.92 91 72 L quay jo yo0g w 2 yawnyigso abpz 9L10f «00,00.E1F o v ov 3 00,0682! 1g¢ 62 bts % —= 1 43) Wy 12104 JO2as WOM SPp40294 UIOL p. SPp4s0I94 WOL S| x 50.16 | 5129 90.88 49.41 PROPERTY DESCRIPTION LOT 1 on SP230070 PARISH of WEYBA COUNTY of MARCH TOTAL AREA 1468m? (Deed) «49.86 % 50.67 BSE a5 223°00'00” 2538 20" 49.78 Lower Level ShI74 ~\ Ei . mtA.. SP230070 Power pole FENCE -/————/ wn ———————_ E ——__ OVERHEAD, UNDERGROUND ELECTRICITY 99.79 x 4 —_- S——————_ SEWER, SEWER MANHOLE 59. . Upper Level %, «98.77 SMH CP ———_1 ————___ TrIsTRA Basement Level RL47.0 (Approx) BUPI02822 } 50.82 oe 6 WATER 7 Top Roof 60.0 5StoreyBuildng en BUILDING EAVES CHANGE IN GRADE rd TREE Ye TYPE WATTLE, TRUNK DIAMETER 0.5m HEIGHT 8metres SPREAD 8metres Eves Panes SCALE: @ A3 1:250 PROJECT PLAN: ISSUE: 0 25 5 = | tts DETAIL SURVEY M2636 01 A THIS SCALE SHOWN IS ORIGINAL DRAWING SCALE - (A3 SIZE) 1 F 1 mosey | Sep) od TSS HON SE Soa ALTUM CONSTRUCTIONS io surveveD | mc | cHEcKED | one | MERE OM A 43 ELANDA STREET M2636-01A Detail. dwg ORIGINAL ISSUE 29.06.2015 SCP URBANC ONSULTANTS | SUNSHINE BEACH 29th lune 2015 DRAWN | scp | APPROVED | DNE | VERTION DATUM: DETAILS: in CONSULTANTS PH HD, TH DOCUMENT MAY NOT BE COPED OR ANGMITTED ANY FORM OR BY AW MEANS IN PART OR W WHOLE WT TWRTTEN CONSENT OFF ORGAN CONSTANTS PTY DATE: PM44260_RL49.843 AHD ISSUE:
Page 24
15104 - SBSMP/0
Page 23
APPENDIX B
DEVELOPMENT PLANS
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 25
STREET if 6,000 SETBACK 9,200 S x I ht ELANDA PROPOSED APARTMENTS _ 223°00' REAL PROPERTY DESCRIPTION LOT 399 & 400 ON RP 48112 PARISH OF WEYBA COUNTY OF MARCH CONSTRUCTION NOTES GENERAL ALL WORK TO COMPLY WITH BUILDING CODE OF AUSTRALIA (B..A) ANIENDMENT 2015 AND ENSURE THAT LOCAL COUNCIL REQUIREMENTS. ARE MET. THIS CONSTRUCTION BEING CLASS 2 AND 7. MAINTENANCE PROVIDE A MAINTENANCE SAFETY ACCESS SYSTEM TO SAFELY SAFETY MAINTAIN THE EXTERNAL FACADE AND ROOF. DESIGNED AND INSTALLED IN ACCORDANCE WITH AS 4488 PARTS 1 & 2. SITE VERIFICATION BEFORE COMMENCING CONSTRUCTION ALL DIMENSIONS, EXISTING LEVELS, FINISHED LEVELS AND ALL SITE SERVICES ARE TO BE VERIFIED. ARCHITECTURAL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ANY ASSOCIATED CONSULTANTS DRAWINGS. FIRE PROTECTION - FIRE RATING TO COMPLY WITH PART C1 OF THE B.C.AFOR CLASS 2, AND 7 OF CONSTRUCTION TYPE SEPARATION OF OPENINGS TO COMPLY WITH PART C2 OF THEBOA PROTECTION OF OPENINGS TO COMPLY WITH PART C3 OF THI FIRE DOORSEY REQUIRED (AS NOTED "IRON ORAWINGS) SHALL HAVE A MINIMUM EBL 60/20 WITH MINIMUM 1 HOUR RATED SELF ‘CLOSER AND LEVER HARD! FIRE DOORSET REQUIRED (AS NOTED "2H ON DRAWINGS?) SHALL HAVE AMINIMUM FRL -/120/30 WITH MINIMUM 1 HOUR RATED SELF CLOSER AND LEVER HARDWARE. FIRE RATINGS — EXTERNAL WALL MECHANICAL SHAFT 90/90 LOADBEARING 90/60/30 INTERNAL LOADBEARING g0i90%0 © ROOF BEAMS. 90/6080 ‘STAIR WALL 90/90/80 INTERNAL FLOOR BETWEEN NON-LOADBEARING 18060 UNITS: 90/90/80 BASEMENT WALL FLOOR BETWEEN LOADBEARING 120/120/120 UNITSAND BASEMENT 2402407240 LIFT SHAFT 90/90/90 STRUCTURAL REFER STRUCTURAL ENGINEERS DRAWINGS FOR FOOTINGS, TIE DOWN, BRACING & FRAMING DETAILS 3,680 SETBACK >} 6 TIMBER ‘STORAGE & ERECTION STRICTLY IN ACCORDANCE WITH AS 1720 TIMBER STRUCTURES CODE & AS 1684 - TIMBER FRAMING CODE TERMITE CONTROL TERMITE CONTROL TO BE INSTALLED TO MANUF. SPEC. AND TO COMPLY WITH BCAB1.3()) CONTROL JOINTS GENERALLY WHERE FLUSH FINISH IS REQUIRED BETWEEN TWO. BUILDING ELEMENTS, PROVIDE A V-TYPECONTROL JOINT PROVIDE CONTROL JOINTS AT MAXIMUM 3 METRE CENTRES TO EXTERNAL FILED AREAS SUCH AS BALCONIES. DRIVEWAYS. ENTRANCES ETC. REFER TO STRUCTURAL ENGINEERS DRAWINGS FOR CONTROL JOINTS 6.705, EXTERIOR F.C SHEETS FIXED STRICTLY IN ACCORDANCE WITH MANUFACTURERS CLADDING WRITTEN SPECIFICATIONS, EXTERNAL FIXINGS TO BE NON-COMBUSTIBLE AND CORROSION-RESISTANT AND FITTINGS INSULATION PROVIDE SISILATION BEHIND ALL EXTERNAL WALL CLADDINGS. PROVIDE SARKING TO UNDERSIDE OF ROOF CLADDINGS. en ee ALLINSULATION TO BE INSTALLED TO MANUFACTURERS SPEC ROOF INSULATION PROVIDE BULK INSULATION OF R2.0 AND REFLECTIVE SARKING TO OBTAIN MINIMUM VALUE OR 22 WALLINSULATION PROVIDE BULK INSULATION WITH R VALUE OF 1.5 REFLECTIVE SARKING TO OBTAIN MINIMUM R VALUE OF 1.4 SOUND INSULATION AS NOTED ON PLANS. Fw RATINGS TO COMPLY WITH PART 3.8.6 OF THEB.C.A, ‘winDows WINDOW FRAME AND GLAZING TO BE INSTALLED TO THE CORRECT ‘TERRAIN CATEGORY INCLUDING LOCAL PRESSURE FACTORS IN ACCORDANCE WITH AS1288 5.270 SMOKE DETECTORS _ INSTALL SMOKE DETECTORS AND ALARM SYSTEM TO COUNCIL REQUIREMENTS CONNECTED TO MAINS POWER AND INSTALLED IN ACCORDANCE WITH AS 3 2.3 OF THE B.C.A, LOCATION a SHOWN ON PLANS INDICATIVE ONLY. FINAL LOCATION TO BE CONFIRMED BY SPECIALIST CONTRACTOR ON SITE VENTILATION HABITABLE ROOMS WILL ACHIEVE DIRECT CFOSS FLOW OF AIG WITH OPENINGS EQU ‘OF THE ROOM'S FLOOR AREA ROOMS ARE ALSO PROvibED va Geiina Fans ALL BATH \UNDRIES, ENSUITES NOT NATURALLY VENTILATED. FOE MecHANIGALLY VENTILATED TO GOMPLY WITHIAS, 1968.2, AS 3666 & BCA F4.5 HANDRAILS HANDRAILING AND BALUSTRADING TO COMPLY WITH PARTS 02.16 AND D2.17 OF THEB.C.A, FIRE EXTINGUISHERS PROVIDE PORTABLE FIRE EXTINGUISHERS IN ACCORDANCE WITH PART 1.6 OF THE B.C.A LOCATED WHERE INDICATED ON DRAWINGS STORMWATER, ALL ROOF & GROUND SURFACE RUNOFF TO BE CONNECTED TO AS PER CIVILAND HYDRAULIC CONSULTANT DRAWINGS AND IN, ACCORDANCE COUNCIL REQUIREMENTS. 10.150 PLUMBING & ACCESS ALL PLUMBING DUCTS TO HAVE ACCESS PANELS TO COUNCIL PANELS. REQUIREMENTS, PLUMBER TO SIZE DOWNPIPES IN ACCORDANCE ‘AS. 3500 (MIN. DIA 80mm) WATERPROOFING WATERPROOFING TO ALL WET AREAS TO COMPLY WITHAS 3740 DISABLED We WC FACILITIES FOR PERSONS WITH A DISABILITY ARE REQUIRED TO FACILITIES COMPLY Wit AS14281 WHICH HAS SPECIFIC REQUIREMENTS FOR “COMPARTMEEN NT SIZE BOOR SIDE CLEARANICES AND HARDWARE, PAN LOCATION AND PAN SUITABLE FOR PERSONS WITHA DISABILITY MUST COMPLY WITH AS1172, HAND BASIN LOCATIONS AND CLEARANCES LechrigN Ge TOILET ROLL HOLDER Lisi SWITCH , FLUSHING a CONTROL. MIRRORS AND HAND TIS RECOMENDED THAT-THe BUILDER BECOMES FAMILIAR WITH THE STANDARDS PRIOR TO COMMENCEMENT OF FITOUT To We FACILITIES FOR PERSONS WITH A DISABILITY. ‘SCALE 12100 (OY SITE PLAN 49.765 notes: The designs, drawings and specication are copyright and always remain the property of BBackburne Jackson Design Pty Ltd Before commencing construction: Verity all mensions and levels. Verity location and levels of al services on site. Verity that floor levels and finished levels will tenable connection to services. Do not scale this drawing, When in doubt refer to Architects. amendment log BUILDING APPROVAL FOR INFORMATION: CONSULTANT ISSUE Black burne Jackson Design Architecture | Landscape | Interiors nchge 87 Aerodrome Rd Maroochydore Qld PO. Box 154 Cotton Tree Qld 4558 mail @blackburnejacksondesign com.au . is | CEILING FANS FANS TO ALL LIVING ROOMS AND BEDROOM 1 o RI ENERGY EFFICIENCY REFER TO CONSULTANTS REPORT FOR A STAR RATED ALTERNATIVE > hy -BCAPART ‘TO BCA PART J a NoTE SURFACE & SUB-SOIL DRAINAGE TO BE IN ACCORDANCE WITH BCA NOT FOR CONSTRUCTION project: north date: 2015 PROPOSED APARTMENT DEVELOPMENT ELANDA STREET SUNSHINE BEACH drawn: = MF client: checked: RJ ALDEV HOLDINGS scale: 1:100 title: project/drawing no. sheet: At s 7032/01 issue: 8 "TORETE EIaRa SST PER! Many, 14 March DOTS ZS ph
Page 26
OUTDOOR SHOWER, GREEN WALL 3,680.2 SETBACK | 6 UNIT 1 A/C UNIT SUSPENDED FROM BALCONY SOFFIT 07 6,705.0 PLANTING 8 03 h uNTr2arc UNIT ar RTMENT TANDEM 00 BALCONY SOFFIT S ae c Sy | i 5 5 o eR . ets © — sy —-@) DOTTED LINE INDICATES FLOOR PLAN LEGEND EXTENT OF ‘SMOOTH SET RENDER FINISH TO INTERNAL Pee DETER ETET, GSAS og Ne _AcoxmouNG uN DASHED LINE ARE TO BE 2 ‘TO INTERNAL WALLS AND ‘SMOOTH SET’ RENDER: 5 BAL BALUSTRADE COLUMNS: FINISH (NOT INCLUDING. E c ‘CUPBOARD COMMUN DRYING ACEH a el A © conTROL vow DOOR NUMBER, ELECTRIAL EDGE CAPPING. EAVES GUTTER FINISHED FLOOR LEVEL FIRE EXTINGHUISER VISITOR 1 © = ° “Ty! : VISITOR 2 FIRE RATED DOOR FLOOR WASTE GRATED DRAIN HANDRAIL, HOSE COCK HYDRANT ‘MICROWAVE OVEN PANTRY PLANTER OUTLET REFRIGERATOR ROOF OUTLET RELATIVE FLOOR LEVEL STORE ‘SCREEN ‘SPOON DRAIN ‘SHELVING ‘SHOWER ‘SEWER MAN HOLE SPITTER ‘STRUCTURAL FLOOR LEVEL 4,370.0 SETBACK 32°57! 0.835 POOL FENCE K WASHING MACHINE UNDER BENCH FRIDGE FLOOR PLAN BASEMENT SOALE 1706 WINDOW NUMBER, BUILDING APPROVAL NOT FOR CONSTRUCTION cHeoKeD notes: issue [amendment log by[ date issue [amendment log by [date project: north Wrwscon smn mimtaiman |S error comumrane [alee PROPOSED APARTMENT DEVELOPMENT Copy andamaye roman te propery 08 pyr and nays oman tap Kr ELANDA STREET SUNSHINE BEACH drawn: MF date: 2015 2 Before commencing construction: Black burne Jackson Design / ; hecked: RJ vals chimera are ewe iv ch Cc Architecture T Landscape | Interiors | client: enews Vary location and levels ofall services on sto : 45 SUNSHINE BEACH ALDEV HOLDINGS scale: 13100 Verity iat et ove ad nish ves wl 27 Aeoome Ra Marocehyore is tite P.O. Box 154 Cotton Tree Qld 4558. phone 07 5443 3200 Project/drawing no. sheet: Al 2 Da not scales drawing Donot soa thi irawings ‘email. [email protected] fax 07 5443. 4030 FLOOR PLAN BASEMENT 7032/02 ‘TOBE-TE Flange SSE pres! Monday. 14 March DOIG ESE pi issue: B
Page 27
43°00! ws 47.456 | se [ | ig S| STAIR 3 cneen E yw kA | a : + —-@ ---p-- ‘SHOWN DASHED iS E uw uw ~ b nv 5.270 FLOOR PLAN LEGEND ELANDA Bt-€2> | Gow. Trower emneo concnere | ober ~ DRY (CLOTHES DRY AREA / LINE \ DOOR NUMBER, |g__Line OF SLAB OvER ELECTRIAL ‘SHOWN DASHED EDGE CAPPING. EAVES GUTTER FINISHED FLOOR LEVEL FIRE EXTINGHUISER FIRE RATED DOOR FLOOR WASTE GRATED DRAIN HANDRAIL, HOSE COCK HYDRANT MICROWAVE OVEN PANTRY PLANTER OUTLET REFRIGERATOR ROOF OUTLET 4370 SETBACK iLGo0Eb K 49.765 RELATIVE FLOOR LEVEL STORE ‘SCREEN ‘SPOON DRAIN ‘SHELVING ‘SHOWER ‘SEWER MAN HOLE SPITTER ‘STRUCTURAL FLOOR LEVEL WASHING MACHINE UNDER BENCH FRIDGE FLOOR PLAN GROUND LEVEL SORLETIO0 WINDOW NUMBER, BUILDING APPROVAL NOT FOR CONSTRUCTION (CHECKED notes: issue [amendment log by|date issue [amendment log by [date project: north ‘A [BUILDING APPROVAL KM] 08-02-16 1. The designs, drawings and specification are PROPOSED APARTMENT DEVELOPMENT Zorn and aways romain he ropary of 8 _ | FOR INFORMATION: CONSULTANT ISSUE Kut} 14-03-16 [ ELANDA STREET SUNSHINE BEACH drawn: MF date: 2015 Before commencing construction: Black burne Jackson Design ‘ . hecked: RJ Vey al mensions and eves iv sh c Architecture T Landscape |" Interiors | olient — Very location and eves of al services on st. 45 ALDEV HOLDINGS scale: 1:100 Vi that or loves an ished ives wil tenable connection to services. \erodrome | faroochydore: title ee swe meswixe | FLOOR PLAN GROUND projecting crest LEVEL 7032/03 issue: B ‘TOBE-TE Flange SSE pres! Monday. 14 March DOIG ESE pi
Page 28
/i\ FLOOR PLAN \ = / tEVELT SCALE TOO 4,000 x I \ srs BTHSHR ‘BTHSHR, 9,200 Co 16,070 SETBACK 3,680 SETBACK >} 6.705 5.270 sl Zs ep Ae ee > --@) | 5 | | | is Ei | | BI | i i e i i 3 +R | 228°00! QU i 49.765 ) a Wo FLOOR PLAN LEGEND Ac AIR CONDITIONING UNIT APP. APPLIANCE CUPBOARD Ac AIR CONDITIONING UNIT BAL BALUSTRADE c CUPBOARD a CONTROL JOINT CON. TROWELFINISHED CONCRETE D puct DRY CLOTHES DRY AREA/LINE DP DOWN PIPES Dw DISHWASHER UNDER, DOOR NUMBER, ELECTRIAL EDGE CAPPING. EAVES GUTTER FINISHED FLOOR LEVEL FIRE EXTINGHUISER FIRE RATED DOOR FLOOR WASTE GRATED DRAIN HANDRAIL, HOSE COCK HYDRANT ‘MICROWAVE OVEN PANTRY PLANTER OUTLET REFRIGERATOR ROOF OUTLET RELATIVE FLOOR LEVEL STORE ‘SCREEN ‘SPOON DRAIN ‘SHELVING ‘SHOWER ‘SEWER MAN HOLE SPITTER ‘STRUCTURAL FLOOR LEVEL WASHING MACHINE UNDER BENCH FRIDGE WINDOW NUMBER, BUILDING APPROVAL NOT FOR CONSTRUCTION notes: The designs, drawings and specication are copyright and always remain the property of BBackburne Jackson Design Pty Ltd Before commencing construction: Verity all mensions and levels. Verity location and levels of al services on site. Verity that floor levels and finished levels will tenable connection to services. Do not scale this drawing, When in doubt refer to Architects. ‘amendment log by [date BUILDING APPROVAL FOR INFORMATION: CONSULTANT ISSUE L ge : Black burne Jackson Design Architecture | Landscape | Interiors 87 Aerodrome Rd Maroochydore Qld PO. Box 154 Cotton Tree Qld 4558 phone ‘email. [email protected] fax project: PROPOSED APARTMENT DEVELOPMENT ELANDA STREET SUNSHINE BEACH client: ALDEV HOLDINGS tile: FLOOR PLAN LEVEL 1 CHECKED north date: 2015 drawn: MF checked: RJ scale: 1:10 projectidrawing no, sheet: At 7032/04 issue: B ‘TOBE-TE Flange SSE pres! Monday. 14 March DOIG ESE pi
Page 29
9,200 oo 5,590 16,070 SETBACK >)
|
|
|
K 10,000 SETBACK x 6610
I
1
|
|
3,680 SETBACK >}
CON LID
6.705
5.270
FLOOR PLAN LEGEND
Ac AIR CONDITIONING UNIT
APP. APPLIANCE CUPBOARD
Ac AIR CONDITIONING UNIT
BAL BALUSTRADE
c CUPBOARD
a CONTROL JOINT
CON. TROWELFINISHED CONCRETE
D puct
DRY CLOTHES DRY AREA/LINE
DP DOWN PIPES
Dw DISHWASHER UNDER,
>
10.150
DOOR NUMBER,
ELECTRIAL
EDGE CAPPING.
EAVES GUTTER
FINISHED FLOOR LEVEL
FIRE EXTINGHUISER
FIRE RATED DOOR
FLOOR WASTE
GRATED DRAIN
HANDRAIL,
HOSE COCK
HYDRANT
‘MICROWAVE
OVEN
PANTRY
PLANTER OUTLET
REFRIGERATOR
ROOF OUTLET
©
K—-4370 SETBACK
RELATIVE FLOOR LEVEL
STORE
‘SCREEN
‘SPOON DRAIN
‘SHELVING
‘SHOWER
‘SEWER MAN HOLE
SPITTER
‘STRUCTURAL FLOOR LEVEL
WASHING MACHINE
UNDER BENCH FRIDGE
FLOOR PLAN
LEVEL2 SCRLETI0
WINDOW NUMBER,
BUILDING APPROVAL
NOT FOR CONSTRUCTION
(CHECKED
notes: issue [amendment log by|date issue [amendment log by [date project: north
1. The designs, drawings and specification are A [BUILDING APPROVAL KM 08-02-16 PROPOSED APARTMENT DEVELOPMENT
copyright and always remain the property of 8 _ | FOR INFORMATION, REVISED FLOOR PLAN UNITS 687) KM) 03-03-16 ELANDA STREET SUNSHINE BEACH drawn: MF
BBackbume Jackson Design Pty Li. © | FOR INFORMATION: CONSULTANT ISSUE Kut} 14-03-16 S!
date: 2015
2 Before commencing construction: Black burne Jackson Design
/ ; hecked: RJ
vals chimera are ewe iv ch Cc Architecture T Landscape | Interiors | client: enews
Vary location and levels ofall services on sto : 45
SUNSHINE BEACH
ALDEV HOLDINGS scale: 13100
Verity iat et ove ad nish ves wl 27 Aeoome Ra Marocehyore is tite
P.O. Box 154 Cotton Tree Qld 4558. phone 07 5443 3200 Project/drawing no. sheet: Al
2 Da not scales drawing
Donot soa thi irawings ‘email. [email protected] fax 07 5443. 4030 FL oOo R PLAN LEVEL 2 7032/05
‘TOBE-TE Flange SSE pres! Monday. 14 March DOIG ESE pi
issue: C
Page 30
nN ROOF PLAN
\c/ SCALE 1:100
®
10,000 SETBACK x
I
I
\
9,200 Qo 5,590 * 16,070 SETBACK >
|
|
|
LINE OF BALCONY
FLOOR BELOW
oof YH @
©
©
k 3,680 SETBACK >}
6.705,
LINE OF BALCONY
FLOOR BELOW
5270
LINE OF WALLS
BELOW SHOWN
DASHED
oI
er “Ue,
S|
LINE OF BALCONY
FLOOR BELOW
e|
S|
l<|
ca|
|
|
co]
S|
<9
al
NM
ROOF PLAN LEGEND
[) acconvensor unt
BG BOX GUTTER
DP DOWNPIPE
EC EDGE CAPPING
EG EAVES GUTTER
FL FLASHING
GF GUTTER FALL
GFL GASFLUE
MEF MECHANICAL EXHAUST FAN
RC RIDGE CAPPING
SP SPREADER.
VG VALLEY GUTTER
FRO ROOF DRAIN OUTLET
NoTE:
REFER TO HYDRAULIC ENGINEER'S DRAWING'S,
FOR GUTTER AND DP SIZES
BUILDING APPROVAL
NOT FOR CONSTRUCTION
notes:
The designs, drawings and specication are
copyright and always remain the property of
BBackburne Jackson Design Pty Ltd
Before commencing construction:
Verity all mensions and levels.
Verity location and levels of al services on site.
Verity that floor levels and finished levels will
tenable connection to services.
Do not scale this drawing,
When in doubt refer to Architects.
amendment log
FOR INFORMATION: CONSULTANT ISSUE
PO. Box 154 Cotton Tree Qld 4558 phone 0754433200
emai mal@backeumejactsondesigncomau tax 07540400 | ROOF PLAN
project:
PROPOSED APARTMENT DEVELOPMENT
/ s ELANDA STREET SUNSHINE BEACH
| Black burne Jackson Design |
vy © Architecture | Landscape | Interiors client:
ca i a ALDEV HOLDINGS
SUNSHINE BEACH 37 Aerodrome Fad Maroochydore Qld title
CHECKED
north date: 2015
drawn: MF
checked: RJ
scale: 1:10
project/drawing no. sheet: At
7032/06 issue:
"TORETE EIaRa SST PER! Many, 14 March DOTS ZS ph
Page 31
nN UPPER PLAN \c/ SCALE 1:100 LINE OF ROOF BELOW ROOF BELOW ROOF BELOW LINE OF ROOF BELOW ROOF PLAN LEGEND [) acconvensor unt BG BOX GUTTER DP DOWNPIPE EC EDGE CAPPING EG EAVES GUTTER FL FLASHING GF GUTTER FALL GFL GASFLUE MEF MECHANICAL EXHAUST FAN RC RIDGE CAPPING SP SPREADER. VG VALLEY GUTTER FRO ROOF DRAIN OUTLET NoTE: REFER TO HYDRAULIC ENGINEER'S DRAWING'S, FOR GUTTER AND DP SIZES BUILDING APPROVAL NOT FOR CONSTRUCTION notes: ‘amendment log date issue [amendment log project: north BUILDING APPROVAL (08-02-16 date: 2015 1 The cesions avigs and spacfcaton ae FOR NFORKATION: CONSULTANT ISSUE ‘e036 PROPOSED APARTMENT DEVELOPMENT Blacksurne Jackson Design Pty Li / ELANDA STREET SUNSHINE BEACH drawn: = MF j Black burne Jackson Design hecked: RU 2 Soe crmenone crt fy if - gkputne Jeskson Pesign client checks Venylecation and eves of al services on st. Ue : es ALDEV HOLDINGS scale: 1-100 Very at oo vlad shed vel il anne 27 heretome Fl Maroney ls title va P.O. Box 154 Cotton Tree Qld 4558 phone Project/drawing no. sheet: Al When in doubt refer to Architects. ‘email. [email protected] fax UPPER ROOF PLAN 7032/07 issue: B "TORETE EIaRa SST PER! Many, 14 March DOTS ZS ph
Page 32
15104 - SBSMP/0
Page 24
APPENDIX C
DBYD DATA
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 33
43 Elanda Street Sunshine Beach 4567 DBYD SW by Type EEEEES BoxCulvert Allotment Pipe Easement Stormwater Misc Infrastructure Optic Fibre Cable « » Clever Networks Cooroy Noosa Council's Fibre Network SW by Type ° CatchPit Bo Fieldiniet Manhole Covenant xs fe} NOOSA COUNCIL While every care is taken to ensure the accuracy of this product, neither the Noosa Council nor the State of Queensiand makes any representations or warranties about its acauracy, reliability, completeness or sutabiity for any particular purpose and disclaims all responsibilty and af liability (induding without limitation, liability in negligence) for all expenses, loses, damages (induding indirect or consequential damage) and costs that may occur as a resuk of the product being inaccurate or incomplete in any way or for any reason. Crown & Council Copyright Reserved. Geocentric Daturn of Australia 1994 (GDA94) Created by: J8 Date: 09 July 2015
Page 34
15104 - SBSMP/0
Page 25
APPENDIX D
RATIONAL METHOD CALCULATIONS
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 35
Rational Method Peak Flow Calculations
Job No: 15104 MORGAN CONSULTING
Job Type: Residential Development ENGINEERS PTY LTD
Address: 43 Elanda Street, Sunshine Beach 1 GREAT GEORGE STREET
Council: Noosa Council PADDINGTON QLD 4064
IFD Data: Noosa Minor Storm: Q10 Designed: AW
1
I10 67mm/hr Major Storm: Q100 Checked: HM
Pre-Development Post-Development
Time of Concentration
Standard Inlet Time Standard Inlet Time
Standard Inlet Time 0 mins QUDM 2007 4.06 Standard Inlet Time 5 mins QUDM 2007 4.06
Sheet Flow (Friends Equation) QUDM 2007 - Table 4.06.3 Sheet Flow (Friends Equation) QUDM 2007 - Table 4.06.3
Sheet flow length (L) 48 m Sheet flow length (L) m
roughness (n) 0.045 short grass roughness (n) short grass
Fall of NSL 7.5 m Fall of NSL m
Slope of Surface (S) 15.6 % Slope of Surface (S) %
total 10.1 mins total 0.0 mins
Concentrated Overland Flow Pipe Flow
Flow distance m Flow distance m
velocity m/s Fall of channel m
mins mins QUDM 2007 - Figure 4.09 Flow Velocity m/s
Surface type multiplier total 0.0 mins
total 0.0 mins
Total tc 10.1 mins Total tc 5.0 mins
Runoff Volume Calculations
Name Area (ha) tc fi C10 Name Area (ha) tc fi C10
0.1468 0 0.67 0.1468 0.65 0.82
Total 0.147 10.1 0.67 Total 0.147 5.0 0.82
Frequency Frequency
ARI Cy Iy Qy ARI Cy Iy Qy
Factor A (Ha) Factor A (Ha)
(years) (Fy*C10) (mm/h) (m3/s) (years) (Fy*C10) (mm/h) (m3/s)
(Fy) (Fy)
3 mth 0.010 3 mth 0.016
1 0.800 0.534 91 0.147 0.020 1 0.800 0.652 119 0.147 0.032
2 0.850 0.567 116 0.147 0.027 2 0.850 0.693 151 0.147 0.043
5 0.950 0.634 144 0.147 0.037 5 0.950 0.774 187 0.147 0.059
10 1.000 0.668 161 0.147 0.044 10 1.000 0.815 209 0.147 0.069
20 1.050 0.701 184 0.147 0.052 20 1.050 0.856 237 0.147 0.083
50 1.150 0.768 214 0.147 0.067 50 1.150 0.937 275 0.147 0.105
100 1.200 0.801 236 0.147 0.077 100 1.200 0.978 305 0.147 0.121
Page 1 of 1 4/05/2016
Page 36
15104 - SBSMP/0
Page 26
APPENDIX E
XP-RAFTS PRE DEVELOPMENT MODEL RESULTS
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 37
Pre-D Site [ALL STORMS]
Total Flow
1yr 10min max [0.021] 1yr 15min max [0.027] 1yr 20min max [0.034] 1yr 25min max [0.042]
1yr 30min max [0.039] 1yr 45min max [0.032] 1yr 60min max [0.039] 1yr 90min max [0.032]
1yr 120min max [0.030] 1yr 180min max [0.022] 1yr 360min max [0.014] 1yr 720min max [0.014]
0.040
0.035
0.030
Total Flow [cms]
0.025
0.020
0.015
0.010
0.005
0.000
3AM 6AM 9AM
1 Thu Jan 2015 Time
[OCR of page images]
Pre-D Site [ALL STORMS]
Total Flow
lyr 10min max [0.021] lyr 15min max [0.027] lyr 20min max [0.034] lyr 25min max [0.042]
lyr 30min max [0.039] lyr 45min max [0.032] lyr 60min max [0.039] lyr 90min max [0.032]
ee pt
lyr 120min max [0.030] tlyr180min max [0.022] lyr 360min max [0.014] lyr 720min max [0.014]
0.040
0.035
0.030
o
oO
N
ou
o
oO
N
3°
Total Flow [cms]
0.015
0.010
0.005
0.000
3AM 6AM 9AM
1 Thu Jan 2015 Time
Page 38
Pre-D Site [ALL STORMS]
Total Flow
2yr 10min max [0.035] 2yr 15min max [0.044] 2yr 20min max [0.048] 2yr 25min max [0.060]
2yr 30min max [0.056] 2yr 45min max [0.044] 2yr 60min max [0.052] 2yr 90min max [0.041]
2yr 120min max [0.039] 2yr 180min max [0.029] 2yr 360min max [0.019] 2yr 720min max [0.019]
0.060
0.055
0.050
0.045
0.040
Total Flow [cms]
0.035
0.030
0.025
0.020
0.015
0.010
0.005
0.000
3AM 6AM 9AM
1 Thu Jan 2015 Time
[OCR of page images]
Pre-D Site [ALL STORMS]
Total Flow
Pe as Pe
2yr 10min max [0.035] 2yr 15min max [0.044] 2yr 20min max [0.048] 2yr 25min max [0.060]
2yr 30min max [0.056] 2yr 45min max [0.044] 2yr 6Omin max [0.052] 2yr 90min max [0.041]
2yr 120min max [0.039] 2yr180min max [0.029] 2yr 360min max [0.019] 2yr 720min max [0.019]
0.060
0.055
0.050
0.045
__0.040
E
50.035
5
2 0.030
©
© 0.025
a
0.020
0.015
0.010
0.005
0.000 : \’ :
3AM 6AM 9AM
1 Thu Jan 2015 Time
Page 39
Pre-D Site [ALL STORMS]
Total Flow
5yr 10min max [0.050] 5yr 15min max [0.066] 5yr 20min max [0.064] 5yr 25min max [0.079]
5yr 30min max [0.073] 5yr 45min max [0.059] 5yr 60min max [0.067] 5yr 90min max [0.054]
5yr 120min max [0.052] 5yr 180min max [0.038] 5yr 360min max [0.026] 5yr 720min max [0.026]
0.08
0.07
0.06
0.05
Total Flow [cms]
0.04
0.03
0.02
0.01
0.00
1 Thu 3AM 6AM 9AM
Jan 2015 Time
[OCR of page images]
Pre-D Site [ALL STORMS]
Total Flow
a Pe a
5yr 10min max [0.050] 5yr 15min max [0.066] 5yr 20min max [0.064] 5yr 25min max [0.079]
5yr 30min max [0.073] 5yr 45min max [0.059] 5yr 6Omin max [0.067] 5yr 90min max [0.054]
ee pt
0.08 5yr 120min max [0.052] 5yr180min max [0.038] 5yr 360min max [0.026] 5yr 720min max [0.026]
0.07
Total Flow [cms]
° ° °
So So So
aS o1 oO
9
oO
o
0.02
1 Thu 3AM 6AM 9AM
Jan 2015 Time
Page 40
Pre-D Site [ALL STORMS]
Total Flow
10yr 10min max [0.059] 10yr 15min max [0.077] 10yr 20min max [0.073] 10yr 25min max [0.089]
10yr 30min max [0.082] 10yr 45min max [0.069] 10yr 60min max [0.077] 10yr 90min max [0.061]
10yr 120min max [0.059] 10yr 180min max [0.043] 10yr 360min max [0.030] 10yr 720min max [0.031]
0.09
0.08
0.07
0.06
Total Flow [cms]
0.05
0.04
0.03
0.02
0.01
0.00
3AM 6AM 9AM
1 Thu Jan 2015 Time
[OCR of page images]
Pre-D Site [ALL STORMS]
Total Flow
P| P| P|
10yr 10min max [0.059] 10yr 15min max [0.077] 10yr 20min max [0.073] 10yr 25min max [0.089]
10yr 30min max [0.082] 10yr 45min max [0.069] 10yr 60min max [0.077] 10yr 90min max [0.061]
—x Fe
0.09 10yr 120min max [0.059] 10yr 180min max [0.043] 10yr 360min max [0.030] 10yr 720min max [0.031]
0.08
0.07 |
0.06 1 !
n
€ |
2.0.05--)}-
= I
oO f
nm i
we 0.04--} hh -
Oo |
- |
0.03-4
0.02
_ } FL
0.00
3AM 6AM 9AM
1 Thu Jan 2015 Time
Page 41
Pre-D Site [ALL STORMS]
Total Flow
20yr 10min max [0.069] 20yr 15min max [0.100] 20yr 20min max [0.092] 20yr 25min max [0.102]
20yr 30min max [0.094] 20yr 45min max [0.081] 20yr 60min max [0.090] 20yr 90min max [0.071]
20yr 120min max [0.069] 20yr 180min max [0.050] 20yr 360min max [0.035] 20yr 720min max [0.037]
0.10
0.09
0.08
0.07
Total Flow [cms]
0.06
0.05
0.04
0.03
0.02
0.01
0.00
3AM 6AM 9AM
1 Thu Jan 2015 Time
[OCR of page images]
Pre-D Site [ALL STORMS]
Total Flow
P| P| P|
20yr 10min max [0.069] 20yr 15min max [0.100] 20yr 20min max [0.092] 20yr 25min max [0.102]
20yr 30min max [0.094] 20yr 45min max [0.081] 20yr 60min max [0.090] 20yr 90min max [0.071]
—x Fe
20yr 120min max [0.069] 20yr 180min max [0.050] 20yr 360min max [0.035] 20yr 720min max [0.037]
0.10 |
0.09
0.08
0.07--||)
9
So
®
Total Flow [cms]
oO oO
So So
& oO
9
oO
o
0.02
0.01
3AM 6AM 9AM
1 Thu Jan 2015 Time
Page 42
Pre-D Site [ALL STORMS]
Total Flow
50yr 10min max [0.085] 50yr 15min max [0.107] 50yr 20min max [0.107] 50yr 25min max [0.106]
50yr 30min max [0.100] 50yr 45min max [0.093] 50yr 60min max [0.100] 50yr 90min max [0.075]
50yr 120min max [0.072] 50yr 180min max [0.053] 50yr 360min max [0.038] 50yr 720min max [0.040]
0.11
0.10
0.09
0.08
0.07
Total Flow [cms]
0.06
0.05
0.04
0.03
0.02
0.01
0.00
1 Thu 3AM 6AM 9AM
Jan 2015 Time
[OCR of page images]
Pre-D Site [ALL STORMS]
Total Flow
P| P| P|
50yr 10min max [0.085] 50yr 15min max [0.107] 50yr 20min max [0.107] 50yr 25min max [0.106]
50yr 30min max [0.100] 50yr 45min max [0.093] 50yr 60min max [0.100] 50yr 90min max [0.075]
—x Fe
0.11 50yr 120min max [0.072] 50yr 180min max [0.053] 50yr 360min max [0.038] 50yr 720min max [0.040]
0.10
0.09
0.08
qo.07
€
=0.06
= 0.
2
me
= 0.05
e
0.04
0.03
0.02
0.01
0.00
1 Thu
Jan 2015 Time
Page 43
Pre-D Site [ALL STORMS]
Total Flow
100yr 10min max [0.096] 100yr 15min max [0.120] 100yr 20min max [0.115]
100yr 25min max [0.117] 100yr 30min max [0.110] 100yr 45min max [0.102]
100yr 60min max [0.110] 100yr 90min max [0.086] 100yr 120min max [0.082]
100yr 180min max [0.059] 100yr 360min max [0.043] 100yr 720min max [0.045]
0.12
0.11
0.10
0.09
0.08
Total Flow [cms]
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0.00
3AM 6AM 9AM
1 Thu Jan 2015 Time
[OCR of page images]
Pre-D Site [ALL STORMS]
Total Flow
Pe Pe
100yr 10min max [0.096] 100yr 15min max [0.120] 100yr 20min max [0.115]
Pe —
100yr 25min max [0.117] 100yr 30min max [0.110] 100yr 45min = max [0.102]
100yr 6Omin max [0.110] 100yr 90min max [0.086] 100yr 120min max [0.082]
Pp
100yr 180min max [0.059] 100yr 360min max [0.043] 100yr 720min max [0.045]
0.12
0.11
0.10
0.09- fi
— 0.08
E
2,0.07
5 I
ir 0.06
G
= 0.05 |
a
0.04
0.03 \|
0.02
0.01 S
0.00
3AM 6AM 9AM
1 Thu Jan 2015 Time
Page 44
15104 - SBSMP/0
Page 27
APPENDIX F
XP-RAFTS POST DEVELOPMENT UNMITIGATED MODEL RESULTS
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 45
Post-D Unm [ALL STORMS]
Total Flow
1yr 10min max [0.045] 1yr 15min max [0.051] 1yr 20min max [0.051] 1yr 25min max [0.052]
1yr 30min max [0.048] 1yr 45min max [0.043] 1yr 60min max [0.046] 1yr 90min max [0.037]
1yr 120min max [0.035] 1yr 180min max [0.023] 1yr 360min max [0.015] 1yr 720min max [0.015]
1yr 1080min max [0.010] 1yr 1440min max [0.011] 1yr 2160min max [0.007] 1yr 2880min max [0.007]
1yr 4320min max [0.005]
0.050
0.045
0.040
0.035
Total Flow [cms]
0.030
0.025
0.020
0.015
0.010
0.005
0.000
1 Thu 3AM 6AM 9AM
Jan 2015 Time
[OCR of page images]
Post-D Unm [ALL STORMS]
Total Flow
P| P| fe
lyr 10min max [0.045] lyr 15min max [0.051] lyr 20min max [0.051] lyr 25min max [0.052]
lyr 30min max [0.048] lyr 45min max [0.043] lyr 60min max [0.046] lyr 90min max [0.037]
—= PF
lyr 120min max [0.035] lyr 180min max [0.023] lyr 360min max [0.015] lyr 720min max [0.015]
P|
lyr 1080min max [0.010] lyr1440min max [0.011] 1yr2160min max [0.007] lyr 2880min max [0.007]
pe
lyr 4320min max [0.005]
0.050
0.045
0.040
0.035
€
2:0.030
=
oO
IZ 0.025
a
© 0.020
0.015-}
0.010
0.005
0.000 a
1 Thu 3AM 6AM 9AM
Jan 2015 Time
Page 46
Post-D Unm [ALL STORMS]
Total Flow
2yr 10min max [0.056] 2yr 15min max [0.065] 2yr 20min max [0.065] 2yr 25min max [0.066]
2yr 30min max [0.061] 2yr 45min max [0.055] 2yr 60min max [0.058] 2yr 90min max [0.048]
2yr 120min max [0.046] 2yr 180min max [0.030] 2yr 360min max [0.020] 2yr 720min max [0.020]
2yr 1080min max [0.014] 2yr 1440min max [0.014] 2yr 2160min max [0.010] 2yr 2880min max [0.009]
2yr 4320min max [0.007]
0.06
0.05
Total Flow [cms]
0.04
0.03
0.02
0.01
0.00
1 Thu 3AM 6AM 9AM
Jan 2015 Time
[OCR of page images]
Post-D Unm [ALL STORMS]
Total Flow
P| P| fe
2yr 10min max [0.056] 2yr 15min max [0.065] 2yr 20min max [0.065] 2yr 25min max [0.066]
2yr 30min max [0.061] 2yr 45min max [0.055] 2yr 6Omin = max [0.058] 2yr 90min max [0.048]
—= PF
2yr 120min max [0.046] 2yr 180min max [0.030] 2yr 360min max [0.020] 2yr 720min max [0.020]
P|
2yr 1080min max [0.014] 2yr1440min max [0.014] 2yr2160min max [0.010] 2yr 2880min max [0.009]
pe
2yr 4320min max [0.007]
0.06
0.05
a
5 0.04
=
©
iL
q 0.03
o
a
0.02
0.01
Se eee —
\. \——____
0.00
1 Thu 6AM 9AM
Jan 2015 Time
Page 47
Post-D Unm [ALL STORMS]
Total Flow
5yr 10min max [0.070] 5yr 15min max [0.080] 5yr 20min max [0.081] 5yr 25min max [0.082]
5yr 30min max [0.076] 5yr 45min max [0.068] 5yr 60min max [0.073] 5yr 90min max [0.061]
5yr 120min max [0.059] 5yr 180min max [0.039] 5yr 360min max [0.026] 5yr 720min max [0.027]
5yr 1080min max [0.019] 5yr 1440min max [0.020] 5yr 2160min max [0.014] 5yr 2880min max [0.014]
5yr 4320min max [0.010]
0.08
0.07
0.06
Total Flow [cms]
0.05
0.04
0.03
0.02
0.01
0.00
3AM 6AM 9AM
1 Thu Jan 2015 Time
[OCR of page images]
Post-D Unm [ALL STORMS]
Total Flow
| P| P|
5yr 10min max [0.070] 5yr 15min max [0.080] 5yr 20min max [0.081] 5yr 25min max [0.082]
5yr 30min max [0.076] 5yr 45min max [0.068] 5yr 60min max [0.073] 5yr 90min max [0.061]
—x P|
5yr 120min max [0.059] 5yr 180min max [0.039] 5yr 360min max [0.026] 5yr 720min max [0.027]
P|
5yr 1080min max [0.019] 5yr 1440min max [0.020] 5yr 2160min max [0.014] 5yr 2880min max [0.014]
5yr 4320min max [0.010]
0.08
0.07
o o o
2S 2 2°
BR a fon)
Total Flow [cms]
o
2
@
o
oO
N
0.01—"
0.00
6AM 9AM
1 Thu Jan 2015 Time
Page 48
Post-D Unm [ALL STORMS]
Total Flow
10yr 10min max [0.078] 10yr 15min max [0.089] 10yr 20min max [0.090] 10yr 25min max [0.091]
10yr 30min max [0.084] 10yr 45min max [0.076] 10yr 60min max [0.082] 10yr 90min max [0.069]
10yr 120min max [0.067] 10yr 180min max [0.044] 10yr 360min max [0.030] 10yr 720min max [0.032]
10yr 1080min max [0.023] 10yr 1440min max [0.023] 10yr 2160min max [0.017] 10yr 2880min max [0.016]
10yr 4320min max [0.012]
0.09
0.08
0.07
0.06
Total Flow [cms]
0.05
0.04
0.03
0.02
0.01
0.00
3AM 6AM
1 Thu Jan 2015 Time
[OCR of page images]
0.09
0.08
Total Flow [cms]
o SfS 2S 98S
oO oO oO oO
aS o a N
o
2
o
0.02
0.01-}
0.00
Post-D Unm [ALL STORMS]
Total Flow
Pe Pe Pe
10yr 10min max [0.078] 10yr 15min max [0.089] 10yr 20min max [0.090] 10yr 25min max [0.091]
10yr 30min max [0.084] 10yr 45min max [0.076] 10yr 60min max [0.082] 10yr 90min max [0.069]
— PF
10yr 120min max [0.067] 10yr 180min max [0.044] 10yr 360min max [0.030] 10yr 720min max [0.032]
Pe
10yr 1080min max [0.023] 10yr1440min max [0.023] 10yr 2160min max [0.017] 10yr 2880min max [0.016]
pe
10yr 4320min max [0.012]
1 Thu Jan 2015 Time
Page 49
Post-D Unm [ALL STORMS]
Total Flow
20yr 10min max [0.089] 20yr 15min max [0.102] 20yr 20min max [0.103] 20yr 25min max [0.104]
20yr 30min max [0.096] 20yr 45min max [0.087] 20yr 60min max [0.093] 20yr 90min max [0.079]
20yr 120min max [0.077] 20yr 180min max [0.051] 20yr 360min max [0.036] 20yr 720min max [0.038]
20yr 1080min max [0.027] 20yr 1440min max [0.028] 20yr 2160min max [0.020] 20yr 2880min max [0.020]
20yr 4320min max [0.015]
0.10
0.09
0.08
0.07
Total Flow [cms]
0.06
0.05
0.04
0.03
0.02
0.01
0.00
3AM 6AM 9AM
1 Thu Jan 2015 Time
[OCR of page images]
Post-D Unm [ALL STORMS]
Total Flow
Pe Pe Pe
20yr 10min max [0.089] 20yr 15min max [0.102] 20yr 20min max [0.103] 20yr 25min max [0.104]
20yr 30min max [0.096] 20yr 45min max [0.087] 20yr 60min max [0.093] 20yr 90min max [0.079]
— PF
20yr 120min max [0.077] 20yr 180min max [0.051] 20yr 360min max [0.036] 20yr 720min max [0.038]
Pe
20yr 1080min max [0.027] 20yr1440min max [0.028] 20yr2160min max [0.020] 20yr 2880min max [0.020]
pe
20yr 4320min max [0.015]
— —_ = —_7
6AM 9AM
1 Thu Jan 2015 Time
Page 50
Post-D Unm [ALL STORMS]
Total Flow
50yr 10min max [0.098] 50yr 15min max [0.110] 50yr 20min max [0.111] 50yr 25min max [0.108]
50yr 30min max [0.101] 50yr 45min max [0.095] 50yr 60min max [0.102] 50yr 90min max [0.082]
50yr 120min max [0.079] 50yr 180min max [0.054] 50yr 360min max [0.038] 50yr 720min max [0.040]
50yr 1080min max [0.030] 50yr 1440min max [0.031] 50yr 2160min max [0.022] 50yr 2880min max [0.021]
50yr 4320min max [0.016]
0.11
0.10
0.09
0.08
Total Flow [cms]
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0.00
1 Thu 3AM 6AM
Jan 2015 Time
[OCR of page images]
Pe
50yr 10min max [0.098]
5O0yr 30min max [0.101]
50yr 120min max [0.079]
50yr 1080min max [0.030]
pe
50yr 4320min max [0.016]
Jan 2015
Post-D Unm [ALL STORMS]
Total Flow
Pe
50yr 15min max [0.110] 50yr 20min max [0.111]
50yr 45min max [0.095] 50yr 60min max [0.102]
PF
50yr 180min max [0.054] 50yr 360min max [0.038]
Pe
50yr 1440min max [0.031] 50yr 2160min max [0.022]
= n \
3AM 6AM
Time
Pe
5Oyr 25min max [0.108]
50yr 90min max [0.082]
50yr 720min max [0.040]
50yr 2880min max [0.021]
Page 51
Post-D Unm [ALL STORMS]
Total Flow
100yr 10min max [0.110] 100yr 15min max [0.121] 100yr 20min max [0.122] 100yr 25min max [0.119]
100yr 30min max [0.112] 100yr 45min max [0.106] 100yr 60min max [0.113] 100yr 90min max [0.091]
100yr 120min max [0.088] 100yr 180min max [0.060] 100yr 360min max [0.043] 100yr 720min max [0.046]
100yr 1080min max [0.034] 100yr 1440min max [0.035] 100yr 2160min max [0.026] 100yr 2880min max [0.025]
100yr 4320min max [0.019]
0.12
0.11
0.10
0.09
Total Flow [cms]
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0.00
1 Thu 3AM 6AM 9AM
Jan 2015 Time
[OCR of page images]
Post-D Unm [ALL STORMS]
Total Flow
| | Yt
100yr 10min max [0.110] 100yr 15min max [0.121] 100yr 20min max [0.122] 100yr 25min max [0.119]
100yr 30min max [0.112] 100yr 45min max [0.106] 100yr 60min max [0.113] 100yr 90min max [0.091]
=x Pe
100yr 120min max [0.088] 100yr 180min max [0.060] 100yr 360min max [0.043] 100yr 720min max [0.046]
Le
100yr 1080min max [0.034] 100yr1440min max [0.035] 100yr 2160min max [0.026] 100yr 2880min max [0.025]
P|
100yr 4320min max [0.019]
[ —_ f+
3AM 6AM 9AM
Time
Page 52
15104 - SBSMP/0
Page 28
APPENDIX G
PRECAST DETENTION TANK DETAILS
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 53
1 - GENERAL NOTES
Standard Heavy DutyAbove ground 23,000L Water Tank Standard Heavy Duty In ground 23,000L Water Tank 1.1 - These drawings shall be read in conjuction with all other consultant
• 1 x 500mm QLD Approved strainer • 1 x 480mm Access with concrete access cover drawings and specifications. Any discrepancies shall be referred to the architect
• 1 x 100mm Overflow @ top of wall • 1 x 100mm Overflow @ top of wall or project manager for a decision before proceeding with the work.
• 1 x 32mm female Brass @ base of wall • 2 x 100mm Inlet @ top of wall Any decision that inputs on Engineering Design shall be referred to the Engineer
• 1 x 32mm female Brass @ top of wall
for confirmation of design integrity.
55 top of wall
1.2 - Dimensions SHALL NOT be obtained by scaling off the drawings.
75
lid thickness
manhole
2 x 100mm Inlet 100mm overflow 1.3 - All dimensions shall be checked by Builder prior to commencement of
1 x 32mm Brass works.
1.4 - Tank Design for exclusive use by Allcast Precast only.
1.5 - Engineering Certification by HR Design. Form is available at time of
2800 overall height
2530 overflow height
Reinforced with purchase.
TM484265R mesh
2 - LOADINGS
2.1 - The structural work as shown in these drawings has been designed for the following cases:
40 MPa high density concrete (i) a lid load of 500kg.
600 x 600 N12
10mm aggregate
corners bars @
600 cnrs
SL82 mesh to floor 3 - FOUNDATIONS
125
floor thickness
3.1 - Foundation material preparation to be in accordance with consulting civil
Refer Bouyancy control
4m x 4m leveled site with 75mm of 5-10mm scredded gravel joint detail below engineer deign and specifications.
100 top of taper
4 x 2.5 Tonne swift lift anchors at
150 at base
base of external wall. 3.2 - Tank backfill material to be free draining and placed in accordance with
3.5m spreader bar required for lifting Allcast Precast backfill specifications.
3.3 - Where suitable foundation bearing capacity is not achieved, contact HR
TANK DESIGN Design Engineers for alternative design solution.
1 : 50
4 - REINFORCED CONCRETE
4.1 - All work shall be in accordance with all current Australian Standards as
SL62 central layer a MINIMUM work standard.
Trimmed to suit manhole
90
4.2 - Concrete shall have a characteristic compressive strength after 28
75
days of not less than : 40 MPa.
3480 Diameter
4.3 - All concrete shall be mechanically vibrated. Vibrator shall not be used
to spread concrete.
Allcast Precast Water Tank 4.4 - All reinforcement shall be supported on plastic chairs, generally at not
greater than 800mm centres in both directions. Bars shall be tied at
alternate intersections.
For Concrete
volumes speak to
Allcast Precast
4.5 - Concrete to have a maximum aggregate size of 10mm and
Engineer water/cement ratio of not greater than 0.65.
R10 links around edge The maximum permissible transport time for concrete between batching
top and bottom and placement on site shall be in accordance with the following table.
AMBIENT AIR MAX. BATCHING TO PLACEMENT
TEMPERATURE TIME
10°-24°C 120 minutes
75mm 5-10mm 25°-27°C 90 minutes
gravel bed 28°-30°C 60 minutes
N12 bar, chem-set 31°-33°C 45 minutes
into 12mm hole 34°-36°C 30 minutes
drilled as shown 37°C+ No placement of concrete unless
3 x 1.3 Tonne chilled water or ice in mix
swift lift anchors
4.6 - All reinforcement shall be supplied by a registered manufacturer with an
Anti-flotation control only required for Tanks in high water table areas or Pump out tanks
approved and certifier quality assurance program in place. All reinforcement is
to comply with the requirements of AS 1302, AS 1303 and AS 1304 as
applicable.
4.7 - All reinforcement is to be placed free from oil, grease or other surface
LID DESIGN BOUYANCY CONTROL JOINT coatings which may impair bond to concrete.
1 : 50 1 : 10 4.8 - All reinforcement to be 500 MPa minimum yield unless noted otherwise.
4.9 - Reinforcement shall not be welded without written approval from the
Engineer.
PHONE :: (07) 5442 2522
HD23,000 LITRE WATER TANK
FAX :: (07) 5442 2479
TOTAL WEIGHT - 9.8 T
POST :: PO Box 100, Woombye Q 4559
FACTORY :: 40 Hill St, Woombye Q 4559
GENERAL ARRANGEMENT SHOWN
WEB :: www.allcastprecast.com.au CUSTOM FITTINGS BY REQUEST
Page 54
15104 - SBSMP/0
Page 29
APPENDIX H
DETAILED CIVIL ENGINEERING PLANS
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 55
³
P: (07) 3369 8411
F: (07) 3369 1893
E : [email protected]
© Morgan Consulting Engineers
This drawing is not to be copied,
retained or used without the
permission of the copyright holder.
1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4
Page 56
P: (07) 3369 8411
F: (07) 3369 1893
E : [email protected]
© Morgan Consulting Engineers
This drawing is not to be copied,
retained or used without the
permission of the copyright holder.
1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4
Page 57
P: (07) 3369 8411
F: (07) 3369 1893
E : [email protected]
© Morgan Consulting Engineers
This drawing is not to be copied,
retained or used without the
permission of the copyright holder.
1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4
Page 58
³ ³ ³ ³
³ ³ ³
P: (07) 3369 8411
F: (07) 3369 1893
E : [email protected]
© Morgan Consulting Engineers
This drawing is not to be copied,
retained or used without the
permission of the copyright holder.
1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4
Page 59
15104 - SBSMP/0
Page 30
APPENDIX I
XP-RAFTS POST DEVELOPMENT MITIGATED MODEL MINOR STORM
RESULTS
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 60
LPD [ALL STORMS]
Total Flow
10yr 10min max [0.052] 10yr 15min max [0.059] 10yr 20min max [0.057] 10yr 25min max [0.063]
10yr 30min max [0.061] 10yr 45min max [0.053] 10yr 60min max [0.058] 10yr 90min max [0.049]
10yr 120min max [0.048] 10yr 180min max [0.041] 10yr 360min max [0.030] 10yr 720min max [0.031]
10yr 1080min max [0.023] 10yr 1440min max [0.023] 10yr 2160min max [0.017] 10yr 2880min max [0.016]
10yr 4320min max [0.013]
0.060
0.055
0.050
0.045
Total Flow [cms]
0.040
0.035
0.030
0.025
0.020
0.015
0.010
0.005
0.000
1 Thu 3AM 6AM 9AM
Jan 2015 Time
[OCR of page images]
LPD [ALL STORMS]
Total Flow
P| ; |
10yr 10min max [0.052] 10yr 15min max [0.059] 10yr 20min max [0.057] 10yr 25min max [0.063]
10yr 30min max [0.061] 10yr 45min max [0.053] 10yr 60min max [0.058] 10yr 90min max [0.049]
= Pe
10yr 120min max [0.048] 10yr 180min max [0.041] 10yr 360min max [0.030] 10yr 720min max [0.031]
;
10yr 1080min max [0.023] 10yr1440min max [0.023] 10yr2160min max [0.017] 10yr 2880min max [0.016]
Pe
10yr 4320min max [0.013]
0.060
0.055
0.050
0.045
20.040
S,
= 0.035
2
iC 0.030
z
5 0.025
a
0.020
0.015
0.010
0.005- -—|
0.000 Mo <
1 Thu 9AM
Jan 2015
Page 61
Tank [ALL STORMS]
Basin:Basin Outflow
10yr 10min max [0.042] 10yr 15min max [0.046] 10yr 20min max [0.047] 10yr 25min max [0.050]
10yr 30min max [0.048] 10yr 45min max [0.044] 10yr 60min max [0.047] 10yr 90min max [0.040]
10yr 120min max [0.038] 10yr 180min max [0.034] 10yr 360min max [0.026] 10yr 720min max [0.027]
10yr 1080min max [0.019] 10yr 1440min max [0.020] 10yr 2160min max [0.014] 10yr 2880min max [0.014]
10yr 4320min max [0.011]
0.050
0.045
0.040
Basin:Basin Outflow [cms]
0.035
0.030
0.025
0.020
0.015
0.010
0.005
0.000
3AM 6AM 9AM
1 Thu Jan 2015 Time
[OCR of page images]
Tank [ALL STORMS]
Basin:Basin Outflow
P| ; |
10yr 10min max [0.042] 10yr 15min max [0.046] 10yr 20min max [0.047] 10yr 25min max [0.050]
10yr 30min max [0.048] 10yr 45min max [0.044] 10yr 60min max [0.047] 10yr 90min max [0.040]
= Pe
10yr 120min max [0.038] 10yr 180min max [0.034] 10yr 360min max [0.026] 10yr 720min max [0.027]
;
10yr 1080min max [0.019] 10yr1440min max [0.020] 10yr2160min max [0.014] 10yr 2880min max [0.014]
Pe
10yr 4320min max [0.011]
0.050
0.045
0.040
Basin:Basin Outflow [cms]
o fo fF FS 98
oO oO oO oO oO
Re N N ow ow
o oO o oO ol
0.000
6AM 9AM
1 Thu Jan 2015 Time
Page 62
Tank [ALL STORMS]
Basin:Basin Stage
10yr 10min max [1.532] 10yr 15min max [1.835] 10yr 20min max [1.924] 10yr 25min max [2.152]
10yr 30min max [2.003] 10yr 45min max [1.681] 10yr 60min max [1.864] 10yr 90min max [1.364]
10yr 120min max [1.268] 10yr 180min max [1.002] 10yr 360min max [0.566] 10yr 720min max [0.609]
10yr 1080min max [0.317] 10yr 1440min max [0.339] 10yr 2160min max [0.178] 10yr 2880min max [0.169]
10yr 4320min max [0.122]
2.2
2.0
1.8
1.6
Basin:Basin Stage [m]
1.4
1.2
1.0
0.8
0.6
0.4
0.2
0.0
3AM 6AM 9AM
1 Thu Jan 2015 Time
[OCR of page images]
a
10yr 10min max [1.532]
10yr 30min max [2.003]
10yr 120min max [1.268]
10yr 1080min max [0.317]
Lt
10yr 4320min max [0.122]
a
IN
-
N
P
oO
ad
0
Basin:Basin Stage [m]
oO
m
oO
IN
oO
Nh
0.0
1 Thu Jan 2015
Tank [ALL STORMS]
Basin:Basin Stage
10yr 15min max [1.835] 10yr 20min max [1.924]
10yr 45min max [1.681]
10yr 60min max [1.864]
10yr 180min max [1.002] 10yr 360min max [0.566]
10yr 1440min max [0.339] 10yr 2160min max [0.178]
i
10yr 25min max [2.152]
10yr 90min max [1.364]
10yr 720min max [0.609]
10yr 2880min max [0.169]
9AM
= eee ——
ee T ame
3AM 6AM
Time
Page 63
Tank [ALL STORMS]
Basin:Basin Storage
10yr 10min max [13.663] 10yr 15min max [16.374] 10yr 20min max [17.163] 10yr 25min max [19.192]
10yr 30min max [17.865] 10yr 45min max [14.993] 10yr 60min max [16.634] 10yr 90min max [12.174]
10yr 120min max [11.308] 10yr 180min max [8.940] 10yr 360min max [5.045] 10yr 720min max [5.430]
10yr 1080min max [2.830] 10yr 1440min max [3.032] 10yr 2160min max [1.586] 10yr 2880min max [1.507]
10yr 4320min max [1.085]
18
16
Basin:Basin Storage [m3]
14
12
10
8
6
4
2
0
1 Thu 3AM 6AM 9AM
Jan 2015 Time
[OCR of page images]
Basin:Basin Storage [m3]
Ee
SS
BR
NO
R
oO
BR
oO
BR
aD
©
0.
1 Thu 3AM 6AM 9AM
TN ee \
OW N SS = : —<—=_
Tank [ALL STORMS]
Basin:Basin Storage
a a Pe
10yr 10min max [13.663] 10yr 15min max [16.374] 10yr 20min max [17.163] 10yr 25min max [19.192]
10yr 30min max [17.865] 10yr 45min max [14.993] 10yr 6GOmin max [16.634] 10yr 90min max [12.174]
= Fe
10yr 120min max [11.308] 10yr 180min max [8.940] 10yr 360min max [5.045] 10yr 720min max [5.430]
a
10yr 1080min max [2.830] 10yr 1440min max [3.032] 10yr 2160min max [1.586] 10yr 2880min max [1.507]
a
10yr 4320min max [1.085]
“SS ___—
Jan 2015 Time
Page 64
15104 - SBSMP/0
Page 31
APPENDIX J
XP-RAFTS POST DEVELOPMENT MITIGATED MODEL MAJOR STORM
RESULTS
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 65
LPD [ALL STORMS]
Total Flow
100yr 10min max [0.091] 100yr 15min max [0.099] 100yr 20min max [0.095] 100yr 25min max [0.115]
100yr 30min max [0.108] 100yr 45min max [0.084] 100yr 60min max [0.109] 100yr 90min max [0.064]
100yr 120min max [0.061] 100yr 180min max [0.054] 100yr 360min max [0.043] 100yr 720min max [0.045]
100yr 1080min max [0.034] 100yr 1440min max [0.035] 100yr 2160min max [0.025] 100yr 2880min max [0.024]
100yr 4320min max [0.019]
0.11
0.10
0.09
0.08
Total Flow [cms]
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0.00
1 Thu 3AM 6AM 9AM
Jan 2015 Time
[OCR of page images]
0.00
LPD [ALL STORMS]
Total Flow
100yr 10min max [0.091] 100yr 15min max [0.099] 100yr 20min max [0.095] 100yr 25min max [0.115]
100yr 30min max [0.108] 100yr 45min max [0.084] 100yr 60min max [0.109] 100yr 90min max [0.064]
=x Pe
100yr 120min max [0.061] 100yr 180min max [0.054] 100yr 360min max [0.043] 100yr 720min max [0.045]
Le
100yr 1080min max [0.034] 100yr1440min max [0.035] 100yr 2160min max [0.025] 100yr 2880min max [0.024]
100yr 4320min max [0.019]
1 Thu 3AM 6AM 9AM
Jan 2015 Time
Page 66
Tank [ALL STORMS]
Basin:Basin Outflow
100yr 10min max [0.076] 100yr 15min max [0.076] 100yr 20min max [0.081] 100yr 25min max [0.084]
100yr 30min max [0.085] 100yr 45min max [0.071] 100yr 60min max [0.083] 100yr 90min max [0.054]
100yr 120min max [0.050] 100yr 180min max [0.045] 100yr 360min max [0.036] 100yr 720min max [0.038]
100yr 1080min max [0.028] 100yr 1440min max [0.030] 100yr 2160min max [0.021] 100yr 2880min max [0.021]
100yr 4320min max [0.016]
0.08
0.07
Basin:Basin Outflow [cms]
0.06
0.05
0.04
0.03
0.02
0.01
0.00
3AM 6AM 9AM
1 Thu Jan 2015 Time
[OCR of page images]
0.08
o o o o o
2 2S 2 2° O°
@ BK a o x
Basin:Basin Outflow [cms]
o
oO
N
0.01
0.00
Tank [ALL STORMS]
Basin:Basin Outflow
PC FC FCS
100yr 10min max [0.076] 100yr 15min max [0.076] 100yr 20min max [0.081] 100yr 25min max [0.084]
100yr 30min max [0.085] 100yr 45min max [0.071] 100yr 60min max [0.083] 100yr 90min max [0.054]
=x Pe
100yr 120min max [0.050] 100yr 180min max [0.045] 100yr 360min max [0.036] 100yr 720min max [0.038]
Le
100yr 1080min max [0.028] 100yr1440min max [0.030] 100yr 2160min max [0.021] 100yr 2880min max [0.021]
P|
100yr 4320min max [0.016]
1 Thu Jan 2015 Time
Page 67
Tank [ALL STORMS]
Basin:Basin Stage
100yr 10min max [2.461] 100yr 15min max [2.452] 100yr 20min max [2.485] 100yr 25min max [2.529]
100yr 30min max [2.529] 100yr 45min max [2.428] 100yr 60min max [2.533] 100yr 90min max [2.313]
100yr 120min max [2.125] 100yr 180min max [1.753] 100yr 360min max [1.128] 100yr 720min max [1.261]
100yr 1080min max [0.697] 100yr 1440min max [0.756] 100yr 2160min max [0.392] 100yr 2880min max [0.365]
100yr 4320min max [0.214]
2.5
2.0
Basin:Basin Stage [m]
1.5
1.0
0.5
0.0
1 Thu 3AM 6AM 9AM
Jan 2015 Time
[OCR of page images]
Tank [ALL STORMS]
Basin:Basin Stage
Pt | Pe
100yr 10min max [2.461] 100yr 15min max [2.452] 100yr 20min max [2.485] 100yr 25min max [2.529]
100yr 30min max [2.529] 100yr 4smin “max [2.428] 100yr 60min “max [2.533] 100yr 90min max [2.313]
100yr 120min max [2.125] 100yr 180min max [1.753] 100yr 36omin max [1.128] 100yr 720min max [1.261]
100yr 1080min max [0.697] 100yr 1a4omin max [0.756] 100yr 2160min max [0.392] 100yr 2880min max [0.365]
Pt
100yr 4320min max [0.214]
25
2.0 |
=
oO
Do
81.5
Y
<
WY
Oo
a
£10
WY
8 f
\
0.5 \
PAV ES NA \
(Ue \ \ LSe=— \__ — —> —
aaa ‘ T EEE ES
1 thu 3AM 6AM 9AM
Jan 2015 Time
Page 68
Tank [ALL STORMS]
Basin:Basin Storage
100yr 10min max [21.952] 100yr 15min max [21.873] 100yr 20min max [22.170] 100yr 25min max [22.559]
100yr 30min max [22.561] 100yr 45min max [21.661] 100yr 60min max [22.590] 100yr 90min max [20.636]
100yr 120min max [18.956] 100yr 180min max [15.636] 100yr 360min max [10.062] 100yr 720min max [11.251]
100yr 1080min max [6.214] 100yr 1440min max [6.743] 100yr 2160min max [3.502] 100yr 2880min max [3.256]
100yr 4320min max [1.907]
22
20
18
Basin:Basin Storage [m3]
16
14
12
10
8
6
4
2
0
1 Thu 3AM 6AM 9AM
Jan 2015 Time
[OCR of page images]
Basin:Basin Storage [m3]
Tank [ALL STORMS]
Basin:Basin Storage
Pe Pe Pe
100yr 10min max [21.952] 100yr 15min max [21.873] 100yr 20min max [22.170] 100yr 25min max [22.559]
100yr 30min max [22.561] 100yr 45min max [21.661] 100yr 60min max [22.590] 100yr 90min max [20.636]
;
100yr 120min max [18.956] 100yr 180min max [15.636] 100yr 360min max [10.062] 100yr 720min max [11.251]
Pe
100yr 1080min max [6.214] 100yr 1440min max [6.743] 100yr 2160min max [3.502] 100yr 2880min max [3.256]
,
100yr 4320min max [1.907]
22
20 \
18
16
14
12
10
ay yy
|
6 \
4 J aN
it A \
2] alan \ SK \
Ly \\ weet ee
0 VW ee eee i —
1 Thu 3AM 6AM
Jan 2015 Time
Page 69
15104 - SBSMP/0
Page 32
APPENDIX K
HYDRAULIC ENGINEERING PLANS
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
Page 70
Drainage Plan:
*
Fixtures: Loading Units:
* *
Key Plan:
CLASS 'C' GRATE
This drawing is confidential and is not to be reproduced in any form
as a whole or in part without the express written authority of
Plumbing Design & drafting pty ltd.
note: symbols are drawn in the correct position but are not to scale
INCORPORATE REMAINING BACKFILL WITH Drawing Style:
INSTALLATION OF SURROUNDING PAVEMENT
ENSURE GRATE IS FITTED TO RISER AND
A
EXPANSION STRIP FITTED AROUND RISER RIM
In strata water
(SEE V-GUARD INSTALLATION INSTRUCTIONS)
STD SERIES 600 PIT RISERS
150Ø HOLDING WELL Out of strata
WITH SS ACCESS COVER. drainage
LIFT SHAFT
North Point:
FLOOR RL Design: Richard Poole
(SEE FLOOR PLANS)
Checked: Mark Laverick
N
SUGGEST POURING SURROUNDING BACKFILL 20
Drawn: Juanita Tate
MPa CONCRETE TO MAX 120mm ABOVE SELECTED OUTLET
V-GUARD TOP EDGE TO ENABLE REMOVAL OF PIPE NOT SHOWN
INTERNAL BRACES (SEE INSTALLATION
INSTRUCTIONS) BEFORE COMPLETION OF
CONCRETE BACKFILL. NOTE:
TO LIFT MANUFACTURES
Issue Date Amendment Int. App.
ALL JOINTS TO BE MADE
WATERTIGHT. 1 06.04.16 PRELIMINARY ISSUE JT RP
REQUIREMENTS
(ALLOW 1800)
3OO X 300 GULLY WITH
NON - SLIP GRATING
150Ø
CONCRETE SURROUND
50mm MIN THICK CONCRETE BLINDING
SLAB TO SET HEIGHT FOR UNIT
100Ø
LEVEL INVERT TAPER M&F -SWJ
A
90° REDUCING JUNCTION-SWJ
600
PIPE SOCKET F&F WITH CAP (RRJ
SOCKET x SWJ SOCKET)
ENSURE PIPEWORK LOCATED WITHIN
CONCRETE STRUCTURE IS COATED
SECTION A-A WITH 'BONDCRETE' & SAND
PUSH ON CAP -SWJ
TOP VIEW
PUDDLE FLANGE
Architect:
EVERHARD V-GUARD 600 AP FITTED WITH RISERS LIFT PIT HOLDING WELL
DETAIL NOT TO SCALE
NOT TO SCALE
Archi tec ture L an dscape I n te ri or s
37 Aerodrome Rd Maroochydore Qld
P.O. Box 154 Cotton Tree Qld 4558 phone 07 5443 3200
email [email protected] fax 07 5443 4030
Hydraulic Consultant:
AHSCA
ASPE
(07) 5437 7660 | [email protected]
4/34 Technology Drive, Warana. Qld. 4575
PO Box 1269 Buddina. Qld. 4575
ACN. 117159243 | ABN. 62117159243 | QBCC Licence No. 1106752
Project:
43-45 ELANDA STREET,
SUNSHINE BEACH, QLD, 4567
Drawing Title:
HYDRAULIC SERVICES
DETAILS
Date: Scale: Sheet:
OCTOBER 2015 (A1) 1:100 (A3) 1:200 11 OF 11
Job No: Disc: Dwg No: Stage: Issue:
15094 - H - 11 PR 1
ORIGINAL SIZE: A1