Council archive · source document
15104 - SBSMP - Rev 0 · MCU13/0215
Attached to the e-mail OPW16/0097 - Operational Works Application.
Attached to the e-mail Operational Works Application – OPW16/0253.
15104 - SBSMP/0
Page 2
Table of Contents
1 INTRODUCTION ............................................................................................ 3
2 EXISTING SITE CONDITIONS .............................................................................. 4
2.1 The Site ............................................................................................... 4
2.2 Surrounding Area .................................................................................... 4
3 PROPOSED DEVELOPMENT ............................................................................... 5
4 EXISTING STORMWATER DRAINAGE SYSTEM........................................................... 6
4.1 Existing Infrastructure .............................................................................. 6
4.2 Existing Drainage Patterns ......................................................................... 7
4.3 Legal Point of Discharge ........................................................................... 7
5 STORMWATER QUANTITY ................................................................................ 8
5.1 Proposed Drainage Patterns ....................................................................... 8
5.2 Rational Method Calculations ..................................................................... 8
5.3 XP-RAFTS Detention Analysis ..................................................................... 10
5.4 Comparison of Peak Flows at Legal Point of Discharge ...................................... 15
6 STORMWATER QUALITY ................................................................................. 17
6.1 Construction Phase................................................................................. 17
6.2 Operational Phase .................................................................................. 19
7 CONCLUSION .............................................................................................. 21
Appendix A EXISTING SITE SURVEY ..................................................................... 22
Appendix B DEVELOPMENT PLANS ...................................................................... 23
Appendix C DBYD DATA .................................................................................. 24
Appendix D RATIONAL METHOD CALCULATIONS ..................................................... 25
Appendix E XP-RAFTS PRE DEVELOPMENT MODEL RESULTS ........................................ 26
Appendix F XP-RAFTS POST DEVELOPMENT UNMITIGATED MODEL RESULTS ..................... 27
Appendix G PRECAST DETENTION TANK DETAILS .................................................... 28
Appendix H DETAILED CIVIL ENGINEERING PLANS ................................................... 29
Appendix I XP-RAFTS POST DEVELOPMENT MITIGATED MODEL MINOR STORM RESULTS ...... 30
Appendix J XP-RAFTS POST DEVELOPMENT MITIGATED MODEL MAJOR STORM RESULTS ...... 31
Appendix K HYDRAULIC ENGINEERING PLANS ........................................................ 32
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.