Council archive · source document
15104 - SBSMP - Rev 0 · MCU13/0215
Attached to the e-mail OPW16/0097 - Operational Works Application.
Attached to the e-mail Operational Works Application – OPW16/0253.
15104 - SBSMP/0
Page 16
The XP-RAFTS hydraulic modelling has demonstrated that the proposed mitigation implemented
will maintain pre development flows (or less) for all design storms at the LPD. Refer to
Appendix I and Appendix J for the XP-RAFTS post development mitigated minor and major
storm peak flows at the LPD, as summarised in Table 5.10 above.
Refer to Appendix H for the detailed civil engineering plans of the proposed development.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.