Table 5.9 – XP-RAFTS Post Development Detention Basin Summary
Post Development Mitigated (Detention Tank)
ARI
(years) Tank Outflow Tank Stage Tank Storage1
(m3/s) (m) (m3)
0.033 0.910 8.123
1
(1yr 25min storm) (1yr 25min storm) (1yr 25min storm)
0.039 1.335 11.912
2
(2yr 25min storm) (2yr 25min storm) (2yr 25min storm)
0.046 1.844 16.453
5
(5yr 25min storm) (5yr 25min storm) (5yr 25min storm)
0.050 2.152 19.192
10
(10yr 25min storm) (10yr 25min storm) (10yr 25min storm)
0.073 2.442 21.787
20
(20yr 25min storm) (20yr 25min storm) (20yr 25min storm)
0.084 2.505 22.345
50
(50yr 25min storm) (50yr 25min storm) (50yr 25min storm)
0.084 2.533 22.590
100
(100yr 60min storm) (100yr 60min storm) (100yr 60min storm)
Notes:
1. Additional detention volume will be achieved in the stormwater pipes.
2. All runoff from roof and surface areas of the proposed development is being directed to and detained
within the detention tank.
5.4 Comparison of Peak Flows at Legal Point of Discharge
Table 5.10 below provides a comparison of the pre development and post development
(mitigated) peak flows at the legal point of discharge (LPD) for the proposed development.
Table 5.10 – Comparison of Peak Flows at the LPD
XP-RAFTS
XP-RAFTS Difference
ARI Post Developed Flows
Pre Developed Flows
(years) at LPD (Mitigated)
(m3/s) (m3/s) %
(m3/s)
0.042 0.040
1 -0.002 -4.8
(1yr 25min storm) (1yr 25min storm)
0.060 0.049
2 -0.011 -18.3
(2yr 25min storm) (2yr 25min storm)
0.079 0.058
5 -0.021 -26.6
(5yr 25min storm) (5yr 25min storm)
0.089 0.063
10 -0.026 -29.2
(10yr 25min storm) (10yr 25min storm)
0.102 0.089
20 -0.013 -12.8
(20yr 25min storm) (20yr 25min storm)
0.107 0.102
50 -0.004 -4.7
(50yr 15min storm) (50yr 25min storm)
0.120 0.115
100 -0.005 -4.2
(100yr 15min storm) (100yr 25min storm)
Notes:
1. Additional detention volume will be achieved in the stormwater pipes.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.