Skip to the record
The only place to find full transcripts.

Council archive · source document

15104 - SBSMP - Rev 0 · MCU13/0215

Attached to the e-mail OPW16/0097 - Operational Works Application.

Attached to the e-mail Operational Works Application – OPW16/0253.

of 70

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                  15104 - SBSMP/0
                                                                                                           Page 15




                  Table 5.9 – XP-RAFTS Post Development Detention Basin Summary
                                      Post Development Mitigated (Detention Tank)
                 ARI
               (years)         Tank Outflow           Tank Stage            Tank Storage1
                                   (m3/s)                 (m)                     (m3)
                                   0.033                 0.910                   8.123
                  1
                             (1yr 25min storm)     (1yr 25min storm)      (1yr 25min storm)
                                   0.039                 1.335                  11.912
                  2
                             (2yr 25min storm)     (2yr 25min storm)      (2yr 25min storm)
                                   0.046                 1.844                  16.453
                  5
                             (5yr 25min storm)     (5yr 25min storm)      (5yr 25min storm)
                                   0.050                 2.152                  19.192
                  10
                            (10yr 25min storm)    (10yr 25min storm)     (10yr 25min storm)
                                   0.073                 2.442                  21.787
                  20
                            (20yr 25min storm)    (20yr 25min storm)     (20yr 25min storm)
                                   0.084                 2.505                  22.345
                  50
                            (50yr 25min storm)    (50yr 25min storm)     (50yr 25min storm)
                                   0.084                 2.533                  22.590
                 100
                           (100yr 60min storm) (100yr 60min storm) (100yr 60min storm)
    Notes:
        1.   Additional detention volume will be achieved in the stormwater pipes.
        2.   All runoff from roof and surface areas of the proposed development is being directed to and detained
             within the detention tank.


5.4 Comparison of Peak Flows at Legal Point of Discharge
Table 5.10 below provides a comparison of the pre development and post development
(mitigated) peak flows at the legal point of discharge (LPD) for the proposed development.

                            Table 5.10 – Comparison of Peak Flows at the LPD
                                                      XP-RAFTS
                                  XP-RAFTS                                           Difference
                   ARI                          Post Developed Flows
                            Pre Developed Flows
                 (years)                          at LPD (Mitigated)
                                    (m3/s)                                     (m3/s)         %
                                                        (m3/s)
                                    0.042               0.040
                       1                                                       -0.002        -4.8
                              (1yr 25min storm)   (1yr 25min storm)
                                    0.060               0.049
                       2                                                       -0.011       -18.3
                              (2yr 25min storm)   (2yr 25min storm)
                                    0.079               0.058
                       5                                                       -0.021       -26.6
                              (5yr 25min storm)   (5yr 25min storm)
                                    0.089               0.063
                      10                                                       -0.026       -29.2
                             (10yr 25min storm)  (10yr 25min storm)
                                    0.102               0.089
                      20                                                       -0.013       -12.8
                             (20yr 25min storm)  (20yr 25min storm)
                                    0.107               0.102
                      50                                                       -0.004        -4.7
                             (50yr 15min storm)  (50yr 25min storm)
                                    0.120               0.115
                   100                                                         -0.005        -4.2
                            (100yr 15min storm) (100yr 25min storm)
    Notes:
        1.   Additional detention volume will be achieved in the stormwater pipes.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15104 - SBSMP - Rev 0.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.