                                                                                           15104 - SBSMP/0
                                                                                                       Page 18




                      Table 6.1 - Potential Contaminants and Proposed Treatments

                                                                                Proposed Treatment
                                                     Management /
       Pollutant         Potential Source                                      Device and Maintenance
                                                 Maintenance Procedures
                                                                                      Procedure
      Sediment &        Excavated material,     Provision of sediment and       Sand filled filter socks.
        Eroded              fill material,       silt barriers to the site        Removal of excess
       material           exposed ground,        drainage entry and exit         sand/silt build up at
                            Stockpiles of                 points.             regular intervals and after
                              material.                                              every storm.
          Dust             Stockpiles of         Covering the material or     Coverage of material with
                         material, exposed      wetting it down at regular    plastic, geotextile, surface
                             ground.                    intervals.             binding agents or regular
                                                                                        watering.
         Litter         Refuse generated by      Construction waste is to        Industrial bin is to be
                               staff.             be cleaned off the site         provided within the
                                                area and installed into an     construction area - to be
                                                    industrial bin then          emptied on at least a
                                                   removed by a refuse               weekly basis.
                                                  collection contractor.
       Concrete         Washing of concrete     Provision of a closed area    Liquids to be removed by a
                          trucks/tools to       onsite for washing off of          waste collection
                        remove wet/unused           concrete slurries.          contractor. Solids to be
                             concrete.                                         placed into a refuse bin.
       Surfactants        Washing down           No cleaning of vehicles       Monitoring & prevention
      (detergents)        operations on         will be permitted on site.
                       hardstand area using
                           detergents.
       Chemical         Typically this may        Where spills occur, the      A temporary containment
        (Paints,       occur due to spillage      containment area is to           area. This is to be
     thinners etc.)        of product.          stop escape. The material     impermeable and of a size
                                                    is to be treated (as      to permit mixing/transfer,
                                                  required) and removed       and with a storage volume
                                                and cleaned by a licensed         of twice the largest
                                                         contractor.                 container used.
                                                Minor spillage outside this     Treatment of spills is to
                                                 area shall be cleaned up           occur on site. No
                                                 with cloths and disposed     discharge of treated water
                                                    of to waste via the        to the stormwater system
                                                       industrial bin.        is to occur without council
                                                                               approval. Incidents are to
                                                                                be reported to the EPA.
      Wastewater         Spillage from the     A licensed contractor shall       No leakage is to be
                         relocation of the         remove any residue          permitted to enter the
                         existing sewerage     sewage from unused pipes       groundwater or discharge
                           reticulation.       and contaminated soils are        to the stormwater
                                                to be disposed of via the              system.
                                                      industrial bin.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15104 - SBSMP - Rev 0.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.