6.2 Operational Phase
The development has been assessed against the latest State Planning Policy 2014 (SPP 2014).
The proposed development will entail material change of use for urban purposes, which will
involve a land area less than 2,500m2. Consequently, State Planning Policy 2014 (SPP 2014) is
not triggered.
The proposed development works are considered 'Low Risk' with respect to pollutants generated
during the operational phase, therefore it is recommended that best management practices be
applied, in accordance with the NSC's water quality guidelines.
Pollutants that are likely to be generated by the development and their likely treatment
methods are listed in Table 6.2 below. The shaded pollutants are considered to be the key
pollutants and will be targeted for treatment.
Table 6.2 - Potential Contaminants and Proposed Treatments - Operational phase
Residential Acceptable Treatment Examples
Pollutant
Development
Litter Yes Bins, litter baskets, buffer strips and
GPT’s
Sediment Yes Swales, sedimentation basins, ponds
and GPT’s
Oxygen demanding substances (organic No N/A
and chemical matter)
Nutrients (N and P) Possible Rainwater tank first flush, bio-
retention basins, infiltration trench.
Pathogens / Faecal coliforms (bacteria No N/A
and viruses)
Hydrocarbons (including oil & grease) Yes Swales, bio-retention basins,
infiltration trench, oil and grease
separators and GPT’s
Heavy metals (often associated with No N/A
fine sediment)
Surfactants (detergents from car Possible N/A
washing)
Organochlorines & organophosphates No N/A
(pesticides, herbicides)
Thermal pollution (heat) No N/A
pH altering substances No N/A
Based on the above potential contaminants it is proposed to provide a roofwater drainage
system fitted with a ‘first flush’ devise to treat runoff from the roof area. The ‘first flush’
system is designed to capture a predefined volume of runoff (Q3 month) and divert it to
landscaping to provide primary and tertiary treatment. Flows which exceed the ‘first flush’
system will be diverted directly to the detention tank. Refer to the hydraulic consultants
drawings for details.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.