7 CONCLUSION
The Residential Development at 43 Elanda Street, Sunshine Beach has been assessed for its
impact on the quantity and quality of stormwater drainage.

As there is no existing drainage infrastructure located in close proximity of the site runoff from
the proposed development can only be discharged to the ground as existing. It has been
established that the rear boundary of the site is considered the legal point of discharge.

Mitigation of increased stormwater runoff from the proposed site is required in order for the
post development stormwater discharge conditions to match the pre development conditions.
With the aid of XP-RAFTS, as recommended in the QUDM, a detention volume requirement of
22.59m3 has been calculated in order to detain stormwater runoff from the proposed
development up to a Q100 storm event. This storage volume shall be provided within a 23,000L
semi-submerged pre-cast detention tank located at the southern corner of the development
under the raised deck. This report has demonstrated that the proposed mitigation measure
(detention volume of 22.59m3) will ensure pre development flow conditions are maintained.

Sediment generated during the construction phase shall be dealt with in accordance with the
Erosion and Sediment Control Plan to be maintained by Morgan Consulting Engineers and kept
on site during the construction phase.

As the development entails operational works for mixed use purposes, which does not involve a
land area greater than 2,500m2, the State Planning Policy 2014 (SPP 2014) is not triggered. The
proposed development works are considered 'Low Risk' with respect to pollutants generated
during the operational phase, therefore best management practices will be applied, in
accordance with the NSC's water quality guidelines.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15104 - SBSMP - Rev 0.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.