The majority of the site is covered by roof catchment however the hardstand driveway
pavement along the south western boundary will be exposed therefore hydrocarbons are likely
to be generated. An Everhard V-Guard 600 Gross Pollutant Trap (GPT) has been specified in the
hardstand pavement area to pick up any litter, sediment and hydrocarbons within the
stormwater runoff.
Refer to Appendix K for the hydraulic consultant’s drawings for details of the GPT.
Refer to Appendix H for the detailed civil engineering plans.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.