Skip to the record
Accept no substitutions.

Council archive · source document

15104 - SBSMP - Rev 0 · MCU13/0215

Attached to the e-mail OPW16/0097 - Operational Works Application.

Attached to the e-mail Operational Works Application – OPW16/0253.

of 70

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                               15104 - SBSMP/0
                                                                                        Page 20




The majority of the site is covered by roof catchment however the hardstand driveway
pavement along the south western boundary will be exposed therefore hydrocarbons are likely
to be generated. An Everhard V-Guard 600 Gross Pollutant Trap (GPT) has been specified in the
hardstand pavement area to pick up any litter, sediment and hydrocarbons within the
stormwater runoff.

Refer to Appendix K for the hydraulic consultant’s drawings for details of the GPT.

Refer to Appendix H for the detailed civil engineering plans.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15104 - SBSMP - Rev 0.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.