5 STORMWATER QUANTITY
A roof and allotment drainage system is to be designed to comply with:
    1. AS/NZS 3500.3:2003 - Plumbing and Drainage Part 3: Stormwater Drainage;
    2. The Queensland Urban Drainage Manual (QUDM), and;
    3. Noosa Shire Council’s Planning Scheme Policies.


5.1 Proposed Drainage Patterns
The proposed drainage patterns are as follows:

Roof Catchment:

    1. Runoff from the roof catchment will flow via downpipes to an internal drainage
       network.
    2. The internal drainage network will then convey stormwater runoff to the end of line
       stormwater detention tank.
Ground Catchment:

    1. Surface runoff from the landscaping and pavement areas will be collected by field inlets
       connected to the internal drainage network.
    2. The internal drainage network will then convey stormwater runoff to the end of line
       stormwater detention tank.

Stormwater will then discharge from the tank at pre-development flow rates to surcharge pits
located within a swale drain at the rear boundary of the site. Overflow from the detention tank
will discharge (at pre-development flow rates) directly to the swale drain.

Once the surcharge pits and swale drain begin to overtop stormwater will then sheet flow
across the rear boundary of the site as per the existing drainage pattern at pre development
flow rates.


5.2 Rational Method Calculations
5.2.1 Design Storms
The following design storms have been adopted for the development in accordance with Section
7.3 of the QUDM and Noosa Shire Council’s Planning Scheme Policy (PSP06 – Section 4):

    1. Minor Drainage System: 10 year ARI statistical flood (Q10 storm), and;
    2. Major Drainage System: 100 year ARI statistical flood (Q100 storm).




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15104 - SBSMP - Rev 0.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.