5.2.2 Rainfall Intensity
Rainfall intensities for this study were obtained from the Bureau of Meteorology.

5.2.3 Times of Concentration
Times of concentration (tc) were calculated as defined in Section 4.6 of the QUDM. Refer to
Appendix D for the adopted tc’s and Appendix D for tc calculations.

                                      Table 5.1 - Adopted tc values
                                   Pre Development        Post Development
                                       tc (mins)               tc (mins)

                                          10.1                     5.0


5.2.4 Runoff Coefficients
The 10 year runoff coefficient’s (C10) were determined as defined in Section 4.5 of the QUDM.
Refer to Appendix D below for the adopted C10 values.

                                      Table 5.2 – Adopted C10 Values
                                                                 Fraction
                                Property State                impervious (fi)       C10

                              Pre development                      0.00             0.67
                              Post development                     0.65             0.82


5.2.5 Peak Flows
Refer to Table 5.3 for a summary of the predicted minor and major discharge rates for pre and
post development conditions and Appendix D for the Rational Method calculations.

                                Table 5.3 – Pre and Post-Development Peak Flows

                             Property State               Q10 (m3/s)            Q100 (m3/s)

                           Pre development                    0.044               0.077
                           Post development                   0.069               0.121


It is evident that there will be an increase between the pre development and post development
peak discharge flow rates. Therefore onsite stormwater detention will be required to mitigate
the increased discharge flow rates to ensure pre development flow rates can be achieved.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15104 - SBSMP - Rev 0.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.