Original source · versioned page text
12. APP G. Stormwater Management Plan
Attached to the e-mail MCU14/0102 Development application Part 3 of 4 App G Stormwater Management Plan.
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Figure 6.2: Bio-Retention Basin Typical Cross-Section (courtesy of Healthy Waterways)
MODELLING OF THE DEVELOPMENT SITE
(MUSIC)
Modelling of the site was undertaken using the ‘Model for Urban Stormwater Improvement
Conceptualisation (MUSIC)’ as promoted by the Noosa Council and the South East Queensland
Healthy Waterways Partnership. The development was modelled using the split catchment
approach. An appropriate type of land use was applied to all surface types within the developed
catchments; with individual treatment devices assigned the relevant modelling treatment
parameters. Consequently, a treatment train was established for each catchment, ensuring that
all water discharging from site adheres to the specified Water Quality Objectives.
Meteorological data for input into MUSIC was obtained for the greater Caloundra catchment
from the Bureau of Meteorology. Six minute time step rainfall data was obtained for the climate
period from 1/1/1980 to 31/12/1989. The catchment parameters of the MUSIC modelling are
specified within the South East Queensland Healthy Waterways Partnerships’ Water by Design
MUSIC Modelling Guidelines for South East Queensland Version 1 (2010), and have been
modelled as such.
POLLUTANT SOURCE NODE DETAILS
Tables 6.2 and 6.3 show the pollutant source node parameters input into the MUSIC model.
These parameters have been utilised in accordance with the South East Queensland Healthy
Waterways Partnerships’ Water by Design MUSIC Modelling Guidelines for South East
Queensland Version 1 (2010).
Table 6.2: Rainfall – Runoff Parameters
Storage Capacity (mm/day) 18
Initial Storage (%) 10
Field Capacity (mm) 80
Initial Depth (mm) 50
Daily Recharge Rate (%) 0
Daily Baseflow Rate (%) 31
Stormwater Management Plans
Page 12 Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595 sbswmp report\f0002-aa007595-aar-03.-smp.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.