Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

12. APP G. Stormwater Management Plan

Attached to the e-mail MCU14/0102 Development application Part 3 of 4 App G Stormwater Management Plan.

of 62

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 20, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                Table 6.3: Rainfall – Runoff Parameters
                Flow Type Industrial             TSS log10 values                        TP log10 values   TN log10 values
                              Urban Surface
                                                 Mean       Std.                         Mean     Std.     Mean     Std.
                              Type
                                                            dev                                   dev.              dev.
                 Baseflow          Roof                     N/A             N/A           N/A      N/A     N/A       N/A
                                   Roads                    0.78            0.45         -1.11    0.48     0.14     0.20
                                   Ground level             0.78            0.45         -1.11    0.48     0.14     0.20
                 Stormflow         Roof                     1.30            0.44         -0.89    0.36     0.25     0.32
                                   Roads                    2.43            0.44         -0.30    0.36     0.25     0.32
                                   Ground level             1.92            0.44         -0.59    0.36     0.25     0.32



                MUSIC MODEL LAYOUT
                A MUSIC model has been created with three conceptual Legal Point of Discharge (LPOD)
                nodes in order to demonstrate that the site meets the pollutant removal targets as specified by
                Council and the State Planning Policy. Separate land use types have been modelled to
                represent; roof water runoff, runoff from hardstand impervious areas and runoff from grassed or
                otherwise pervious areas within each catchment. Appropriate percentage impervious factors
                have been applied to all nodes based on the proposed design detailed within the Engineering
                Drawings presented in Appendix B.

                Three separate bio-retention areas form the basis of the treatment train and is represented in
                the model with appropriate areas and volumes. A diagrammatic view of the MUSIC model
                layouts is presented in Figure 6.3.




139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289                                                                                  13
f:\aa007595\f-reports\f0002-aar-aa007595 sbswmp report\f0002-aa007595-aar-03.-smp.docx
Log in to download the original file

12. APP G. Stormwater Management Plan.pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.