12. APP G. Stormwater Management Plan
Attached to the e-mail MCU14/0102 Development application Part 3 of 4 App G Stormwater Management Plan.
Original PDF page 21, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Figure 6.3: MUSIC Model Layout for Convenience Centre Development
The bio-retention areas for each catchment are listed below:
- Catchment 1: 32 m2 of filter media area
- Catchment 2: 22m2 of filter media area
- Catchment 3: 72m2 of filter media area
FUEL AREAS
The proposed development will need to comply with the Australian Standard 1940 – The
Storage and Handing of Flammable and Combustible Liquids. A blind sump, capable of
containing as a minimum the quantity of at least the largest compartment of the delivery tanker,
Stormwater Management Plans
Page 14 Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595 sbswmp report\f0002-aa007595-aar-03.-smp.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.