REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
C MCU DA Issue MS 06.03.20
D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
F GIA Issue MS 07.04.21
Suite 2,
Cnr Gard
Alexand
PO Box
P 07 54
admin@
75 H A S T I N G S S T R E E T , N O O S A H E A D S
SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: [email protected]
PROPOSED ALTERATIONS & ADDITIONS
project
PROPOSED ALTERATIONS &
ADDITIONS TO EXISTING
RESORT BUILDING
TO EXISTING RESORT BUILDING
for
NETANYA RESORT
at
75 HASTINGS STREET
NOOSA HEADS
drawing
COVER SHEET
ISSUED FOR MATERIAL CHANGE OF USE
(G E N E R A L L Y I N A C C O R D A N C E R E V I S I O N )
AS SHOWN
date 7/04/2021 drawn JP scale @A1
drawing no. 19021 SD00.00 revision F
Copyright of this document remains the exclusive
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
to scaled.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 8 (of 44)
Section 2
REV DESCRIPTION DRN DATE
REAL PROPERTY DESCRIPTION A
B
MCU DA Issue
MCU DA Issue
MS
MS
25.02.20
02.03.20
CORAL SEA STREET ADDRESS: 75 HASTINGS STREET
C
D
MCU DA Issue
Client Revisions
MS
MS
06.03.20
14.04.20
E MCU DA MS 05.08.20
NOOSA HEADS, SUNSHINE COAST Information Response
LOT 0 ON BUP101500 F GIA Issue MS 07.04.21
PARISH: NOOSA
RK
COUNTY: MARCH
PA
LOCAL AUTHORITY: NOOSA SHIRE COUNCIL
L
NA
DRAWING SCHEDULE SD
TIO
Sheet no. Sheet Name: Status:
NA
SD00.00 COVER SHEET F
A
OS
SD00.01 LOCALITY & REGISTER F
SD10.00 NEW WORKS - GROUND FLOOR SITE PLAN F
NO
SD10.01 NEW WORKS - FIRST FLOOR SITE PLAN F
TO
SD10.02 NEW WORKS - SECOND FLOOR SITE PLAN F
SD10.03 NEW WORKS - THIRD FLOOR SITE PLAN F
SD10.04 NEW WORKS - FOURTH FLOOR SITE PLAN F
Has SD20.00 NEW WORKS - GROUND FLOOR K
ting SD20.01 NEW WORKS - FIRST FLOOR H
s S
tree
t Subject SD20.02
SD20.03
NEW WORKS - SECOND FLOOR
NEW WORKS - THIRD FLOOR
G
G
Site SD20.04 NEW WORKS - ROOF TERRACE G
SD20.05 NEW WORKS - ROOF LEVEL B
SD30.00 NEW WORKS - ELEVATIONS F
SD30.01 NEW WORKS - ELEVATIONS F
SD30.02 NEW WORKS - SECTIONS H
SD30.03 NEW WORKS - SECTION E
NOOSA HEADS SD60.00 DETAILED AREA - SOUTH-WEST TENANCI... F
SD60.01 DETAILED AREA - FORECOURT / CAFE F
SD60.02 DETAILED AREA - FORECOURT / CAFE F
SD60.03 DETAILED AREA - COVERED SEAT / UNIT A... F
SD60.04 DETAILED AREA - POOL TERRACE / REAR ... F
SD60.05 DETAILED AREA - POOL TERRACE / REAR ... F
SD60.06 DETAILED AREA - ROOF TERRACE / FEAT... F
SD60.07 DETAILED AREA - STAIR / LIFT EXTENSIONS F
SD60.08 DETAILED AREA - 'SAILS' ENTRY / PARK R... F
SD60.09 DETAILED AREA - 'SAILS' ENTRY / PARK R... F
UM
SD80.00 LANDSCAPING AREAS - EXISTING CONDI... F
OOL
SD80.01 LANDSCAPING AREAS - NEW WORKS F
SD80.02 SITE COVER AREAS - EXISTING CONDITIO... F
TO C
SD80.03 GFA AREAS - EXISTING CONDITIONS / NE... F
SD80.04 ROOFTOP TERRACE LETTABLE AREAS - N... F Suite 2,
Cnr Gard
SD80.05 FIRST FLOOR UNIT GFA - NEW WORKS B
Alexand
SD80.06 SECOND FLOOR UNIT GFA - NEW WORKS B PO Box
SD80.07 THIRD FLOOR UNIT GFA - NEW WORKS B P 07 54
SD80.08 ROOF TERRACE GFA - NEW WORKS B admin@
SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: [email protected]
project
PROPOSED ALTERATIONS &
ADDITIONS TO EXISTING
RESORT BUILDING
for
NETANYA RESORT
at
75 HASTINGS STREET
NOOSA HEADS
drawing
LOCALITY & REGISTER
AS SHOWN
date 7/04/2021 drawn JP scale @A1
drawing no. 19021 SD00.01 revision F
Copyright of this document remains the exclusive
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
to scaled.
Section 3
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
C MCU DA Issue MS 06.03.20
D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
F GIA Issue MS 07.04.21
Key Changes - Legend
1 The extension of the outdoor dining area for
the Providore tenancy
2 A new awning over the Hastings Street side
of Bellissima tenancy for increased weather
protection
3 A new roof over the western side of the
Bellissima tenancy and service yard for
increased weather protection
4 A new roof over the foyer entry and car
set down area adjoining lobby for increased
weather protection and convenience
5 The extension of the existing fire stairs from
Level 3 to the roof level to meet fire and
evacuation codes
6 The extension of the eastern lift from Level 3
to the roof level to meet DDE standards
Generally throughout:
- New non combustible render (similar to 7 New covered walkway links to the fire stairs
on Level 4 for increased weather protection
Rockcote Q render) and waterproof
Store
membrane paint system to all external walls 8 New feature pergolas to the rooftop terraces
5 6 7 8 9 10 11 12 13 14
- New anodised aluminium (25µm coating) 37 38 15 16 17 18 19 20 21 22 for increased shade protection
sliding doors to terraces / balconies
BUILDING B 9
4 A new cantilevered awning above the north
BUILDING A
- New anodised aluminium (25µm coating) windows
facing units on the beach side for increased
- New balustrades throughout entire building
weather protection
- New tiles to walkways, terraces and balconies 3
29 10 A new awning structure above the U205
36 28 27 26 25 24 23 terrace for increased weather protection
2
30
35 11 A new rear entry structure between the
building and the beach for increased
1
weather protection
31
34 New fire escape stairs and
path-of-travel to Park Road, 12 A new plunge pool and pergola over
revised entry / exit to 'Sails' to existing U205 terraced
32
33 restaurant and back-of-house
area. Refer to SD60.08 and 13 New stair, substation, amenities and roof
SD60.09 for perspectives and structure to the eastern side of the building /
description of new works Sails entry
14 New shopfront and roof over 'Rumba Bar'
D
SETOUT POINT as well as extension of Fire Stair 01
A
O
Suite 2,
3
R
Cnr Gard
13 Alexand
K
PO Box
R
P 07 54
New roof structure and awnings
A
to existing tenancies / back-of-
admin@
P
house / bin area. Refer to 39
SD60.00 for perspectives and
description of new works SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
2
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: [email protected]
project
PROPOSED ALTERATIONS &
ADDITIONS TO EXISTING
RESORT BUILDING
for
New raised timber deck, feature
timber seats and general NETANYA RESORT
alterations to resort main entry
forecourt. Refer to SD60.01 and
SD60.02 for perspectives and
1 4 14 at
75 HASTINGS STREET
description of new works NOOSA HEADS
drawing
H A S T I N G S S T R E E T NEW WORKS - GROUND FLOOR
SITE PLAN
AS SHOWN
date 7/04/2021 drawn JP scale @A1
drawing no. 19021 SD10.00 revision F
Copyright of this document remains the exclusive
N
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
GROUND LEVEL Scale 1:200
Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
Scale 1:200 0 5 10 20 30 40 to scaled.
Section 4
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
C MCU DA Issue MS 06.03.20
D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
F GIA Issue MS 07.04.21
Key Changes - Legend
1 The extension of the outdoor dining area for
the Providore tenancy
2 A new awning over the Hastings Street side
of Bellissima tenancy for increased weather
protection
12 10 11 3 A new roof over the western side of the
Bellissima tenancy and service yard for
increased weather protection
4 A new roof over the foyer entry and car
set down area adjoining lobby for increased
weather protection and convenience
5 The extension of the existing fire stairs from
Level 3 to the roof level to meet fire and
evacuation codes
SETOUT POINT
6 The extension of the eastern lift from Level 3
Property Boundary
to the roof level to meet DDE standards
Generally throughout:
- New non combustible render (similar to New rear entry roof structure/ entry 7 New covered walkway links to the fire stairs
walkway and pool alterations. Refer to on Level 4 for increased weather protection
Rockcote Q render) and waterproof
SD60.04 and SD60.05 for perspectives
membrane paint system to all external walls and description of new works 8 New feature pergolas to the rooftop terraces
- New anodised aluminium (25µm coating) for increased shade protection
sliding doors to terraces / balconies
- New anodised aluminium (25µm coating) windows 9 A new cantilevered awning above the north
Existing restaurant - no works facing units on the beach side for increased
- New balustrades throughout entire building
weather protection
- New tiles to walkways, terraces and balconies
10 A new awning structure above the U205
terrace for increased weather protection
New awning structures and
plunge pool to existing
terraces. Refer to SD60.03
BUILDING A BUILDING B 11 A new rear entry structure between the
building and the beach for increased
weather protection
for perspectives and
description of new works New fire escape stairs and
path-of-travel to Park Road, 12 A new plunge pool and pergola over
revised entry / exit to 'Sails' to existing U205 terraced
restaurant and back-of-house
area. Refer to SD60.08 and 13 New stair, substation, amenities and roof
SD60.09 for perspectives and structure to the eastern side of the building /
description of new works Sails entry
14 New shopfront and roof over 'Rumba Bar'
D
SETOUT POINT as well as extension of Fire Stair 01
A
O
Suite 2,
3
R
Cnr Gard
13 Alexand
K
PO Box
R
P 07 54
New roof structure and awnings
A
to existing tenancies / back-of-
admin@
P
house / bin area. Refer to
SD60.00 for perspectives and
description of new works SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
2
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: [email protected]
project
PROPOSED ALTERATIONS &
ADDITIONS TO EXISTING
RESORT BUILDING
for
New roof structures and general
NETANYA RESORT
1 4 14
alterations to resort main entry
forecourt. Refer to SD60.01 and at
SD60.02 for perspectives and
description of new works 75 HASTINGS STREET
NOOSA HEADS
drawing
H A S T I N G S S T R E E T NEW WORKS - FIRST FLOOR
SITE PLAN
AS SHOWN
date 7/04/2021 drawn JP scale @A1
drawing no. 19021 SD10.01 revision F
Copyright of this document remains the exclusive
N
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
LEVEL 1 Scale 1:200
Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
Scale 1:200 0 5 10 20 30 40 to scaled.
Section 5
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
C MCU DA Issue MS 06.03.20
D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
F GIA Issue MS 07.04.21
Key Changes - Legend
1 The extension of the outdoor dining area for
the Providore tenancy
2 A new awning over the Hastings Street side
of Bellissima tenancy for increased weather
protection
12 10 11 3 A new roof over the western side of the
Bellissima tenancy and service yard for
increased weather protection
4 A new roof over the foyer entry and car
set down area adjoining lobby for increased
weather protection and convenience
5 The extension of the existing fire stairs from
Level 3 to the roof level to meet fire and
evacuation codes
6 The extension of the eastern lift from Level 3
to the roof level to meet DDE standards
Generally throughout:
- New non combustible render (similar to New rear entry roof structure/ entry 7 New covered walkway links to the fire stairs
walkway and pool alterations. Refer to on Level 4 for increased weather protection
Rockcote Q render) and waterproof
SD60.04 and SD60.05 for perspectives
membrane paint system to all external walls and description of new works 8 New feature pergolas to the rooftop terraces
- New anodised aluminium (25µm coating) for increased shade protection
sliding doors to terraces / balconies
- New anodised aluminium (25µm coating) windows
- New balustrades throughout entire building
BUILDING A BUILDING B Existing restaurant - no works
9 A new cantilevered awning above the north
facing units on the beach side for increased
weather protection
- New tiles to walkways, terraces and balconies
10 A new awning structure above the U205
terrace for increased weather protection
New awning structures and
plunge pool to existing 11 A new rear entry structure between the
building and the beach for increased
terraces. Refer to SD60.03 weather protection
for perspectives and
description of new works New fire escape stairs and
path-of-travel to Park Road, 12 A new plunge pool and pergola over
revised entry / exit to 'Sails' to existing U205 terraced
restaurant and back-of-house
area. Refer to SD60.08 and 13 New stair, substation, amenities and roof
SD60.09 for perspectives and structure to the eastern side of the building /
description of new works Sails entry
14 New shopfront and roof over 'Rumba Bar'
D
SETOUT POINT as well as extension of Fire Stair 01
A
O
Suite 2,
R
Cnr Gard
13 Alexand
K
PO Box
R
P 07 54
A
admin@
P
SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: [email protected]
project
PROPOSED ALTERATIONS &
ADDITIONS TO EXISTING
RESORT BUILDING
for
NETANYA RESORT
at
75 HASTINGS STREET
NOOSA HEADS
drawing
H A S T I N G S S T R E E T NEW WORKS - SECOND FLOOR
SITE PLAN
AS SHOWN
date 7/04/2021 drawn JP scale @A1
drawing no. 19021 SD10.02 revision F
Copyright of this document remains the exclusive
N
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
LEVEL 2 Scale 1:200
Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
Scale 1:200 0 5 10 20 30 40 to scaled.
Section 6
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
C MCU DA Issue MS 06.03.20
D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
F GIA Issue MS 07.04.21
Key Changes - Legend
1 The extension of the outdoor dining area for
the Providore tenancy
2 A new awning over the Hastings Street side
of Bellissima tenancy for increased weather
protection
3 A new roof over the western side of the
Bellissima tenancy and service yard for
increased weather protection
4 A new roof over the foyer entry and car
set down area adjoining lobby for increased
weather protection and convenience
5 The extension of the existing fire stairs from
Level 3 to the roof level to meet fire and
evacuation codes
6 The extension of the eastern lift from Level 3
to the roof level to meet DDE standards
Generally throughout:
- New non combustible render (similar to 7 New covered walkway links to the fire stairs
on Level 4 for increased weather protection
Rockcote Q render) and waterproof
membrane paint system to all external walls 8 New feature pergolas to the rooftop terraces
- New anodised aluminium (25µm coating) for increased shade protection
sliding doors to terraces / balconies
9 A new cantilevered awning above the north
BUILDING A BUILDING B
- New anodised aluminium (25µm coating) windows
facing units on the beach side for increased
- New balustrades throughout entire building
weather protection
- New tiles to walkways, terraces and balconies
10 A new awning structure above the U205
terrace for increased weather protection
11 A new rear entry structure between the
building and the beach for increased
weather protection
12 A new plunge pool and pergola over
to existing U205 terraced
13 New stair, substation, amenities and roof
structure to the eastern side of the building /
Sails entry
14 New shopfront and roof over 'Rumba Bar'
SETOUT POINT as well as extension of Fire Stair 01
Suite 2,
Cnr Gard
Alexand
PO Box
P 07 54
admin@
SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: [email protected]
project
PROPOSED ALTERATIONS &
ADDITIONS TO EXISTING
RESORT BUILDING
for
NETANYA RESORT
at
75 HASTINGS STREET
NOOSA HEADS
drawing
NEW WORKS - THIRD FLOOR
SITE PLAN
AS SHOWN
date 7/04/2021 drawn JP scale @A1
drawing no. 19021 SD10.03 revision F
Copyright of this document remains the exclusive
N
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
LEVEL 3 Scale 1:200
Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
Scale 1:200 0 5 10 20 30 40 to scaled.
Section 7
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
C MCU DA Issue MS 06.03.20
D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
F GIA Issue MS 07.04.21
Key Changes - Legend
1 The extension of the outdoor dining area for
the Providore tenancy
2 A new awning over the Hastings Street side
of Bellissima tenancy for increased weather
protection
3 A new roof over the western side of the
Bellissima tenancy and service yard for
increased weather protection
4 A new roof over the foyer entry and car
8 9 8 9 set down area adjoining lobby for increased
weather protection and convenience
5 The extension of the existing fire stairs from
Level 3 to the roof level to meet fire and
evacuation codes
6 The extension of the eastern lift from Level 3
to the roof level to meet DDE standards
Generally throughout:
- New non combustible render (similar to 7 New covered walkway links to the fire stairs
on Level 4 for increased weather protection
Rockcote Q render) and waterproof
membrane paint system to all external walls 8 New feature pergolas to the rooftop terraces
- New anodised aluminium (25µm coating) for increased shade protection
sliding doors to terraces / balconies
- New anodised aluminium (25µm coating) windows
- New balustrades throughout entire building BUILDING A BUILDING B 9 A new cantilevered awning above the north
facing units on the beach side for increased
weather protection
- New tiles to walkways, terraces and balconies
10 A new awning structure above the U205
terrace for increased weather protection
New roofing and
powdercoated aluminium 11 A new rear entry structure between the
batten structure to building and the beach for increased
balconies. Refer to SD60.06 weather protection
for perspectives and
description of new works
12 A new plunge pool and pergola over
to existing U205 terraced
New feature pergola and shower
area to rooftop terraces. Refer to
SD60.06 for perspectives and 13 New stair, substation, amenities and roof
description of new works structure to the eastern side of the building /
Sails entry
14 New shopfront and roof over 'Rumba Bar'
SETOUT POINT
Void Void Void 7 as well as extension of Fire Stair 01
New feature pergola and
shower area to rooftop Suite 2,
terraces. Refer to SD60.06 New lift core and fire exit stair Cnr Gard
for perspectives and extensions to rooftop terrace.
description of new works
Alexand
Covered walkway links and screening.
Refer to SD60.07 for perspectives PO Box
and description of new works
P 07 54
admin@
SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: [email protected]
project
PROPOSED ALTERATIONS &
ADDITIONS TO EXISTING
RESORT BUILDING
for
NETANYA RESORT
5 6 5 at
75 HASTINGS STREET
NOOSA HEADS
drawing
NEW WORKS - FOURTH FLOOR
SITE PLAN
AS SHOWN
date 7/04/2021 drawn JP scale @A1
drawing no. 19021 SD10.04 revision F
Copyright of this document remains the exclusive
N
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
LEVEL 4 / ROOF TERRACE Scale 1:200
Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
Scale 1:200 0 5 10 20 30 40 to scaled.
Section 8
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
Existing storage - 2 no. new C MCU DA Issue MS 06.03.20
A B
8 m2 car spaces D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
F
K GIA Issue MS 07.04.21
C
Screen
C
BAL-ST3
AC AC AC AC AC
EX-HYD BAL-ST3
EX-COL
N-FWG
Plant Room Maintenance New New
5400
up
Change car space car space
Store
Room
5 6 7 8 9 10 11 12 13 14 Gate ES
2800
Screen Screen 37 38 N-COL 15 16 17 18 19 20 21 22
tra ease
Change
Gr
p
BOL Room
Filtration Equipment
New line marking to
Select new paint finish to all delineate car parking spaces
BUILDING B
4 walls, columns and soffits.
5335
New line marking to Wine
BUILDING A
Provide non-combustible
delineate car parking spaces
nt
Carpark Carpark Cellar
6160
BOL render and paint finish to all
me
new walls as indicated
uip
te
K
Ga
EX-DO
eq
BOL
ply
lis
rel
up
Existing stair over to remain,
eT
3
ss
entering 'Sails' restaurant
ap
Ga
Ga
sc
EX-HYD te
nd
La
AC EX-HYD 29 Sc
EX-HYD EX-HYD ree FHR TL-12 Planter
n
Screen Gate Gate Screen
36 28 27 26 25 24 23 up
Gate
New pool pump &
T3
Sta w
Filtration Equipment
EX-DO EX-DP
ir
Ne
L-S
filtration equipment
T3
2 New, reconfigured Hot Water
Pool
L-S
BA
to Plant Room. Refer entry / exit fire escape Systems up dn
BA
Screen
to Pool consultant's
30 Plant stairs and platforms to Ste
Gate
Storage Conference Room
Screen
drawings. conform with current px
2
(no works) (no works) EP-A Store Store building standards to
te
Screen
35
Screen
Epoxy Floor finish
Ga
future details EX-
6025 to cover equipment
TL-12
Carpark
Gate
Manhole plinths as required. HYD N-COL ES
dn
1
T3
3
Bin
L-0
up Server SK
L-S
EX-HYD Wash EX-HYD EX-HYD EX-HYD
BA
SW MH AC
T3
BA
EX-HYD 31
L-S
HWS FHR
EX-HYD up
FEX
BA
Elec.
WM dn
WM Storage WC Male WC 34
TL-13 TL-12
HWS Toilets New Main Switchboard as 2000 mm clear head
Metal height between stair
WC
per manufacturer's and
Wine Cellar louvres
Laundry or electrical engineer's details, landing and floor slab over
Linen / rid (no works)
Sta w
r with 2 no. removable
T2
ir
Ne
Co
Linen
Female
L-S
TL-12
Trolley bollards for protection 32 up
Toilets
BA
New Screen
between board and car park
DRY Room TL-13
33
Elec.
up TL-12 up Carpark N-COL Entry
Existing
Office Commercial Kitchen Plant TL-07 Provide extension to existing
Wine Bar
ct
DRY WM T Chemicals The text continues on section 9.
Used in these records
About this file
- File size
- 20.9 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.