Council archive · source document
Netanya Refurb_GIA Issue Set_210407 · 51901.3614.02
Attached to the e-mail Generally in Accordance - Landscaping & Colour Palette - 51901.3614.02, 51901.3786.03, 51992.479.02, 51994.1249.02, 51994.1048.02 & MCU13/0081.02.
Very large file (20.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
Provide new proprietary type waterproof New 1800 high frameless New turfed area with new soil under. Provide new
New frameless glass New pool access steps New upstand wall with New landscaping to front of C MCU DA Issue MS 06.03.20
tanking membrane to planter slabs as grey tint glass pool fence and
pool fence on A and proprietary type select tiled finish (TL-06)
Existing ramp to B new fence / boundary line New proprietary type waterproof tanking membrane to
per manufacturer's recommendations gate on stainless steel spigots entry to be retained landscaping slab as per manufacturer's recommendations D Client Revisions MS 14.04.20
stainless steel spigots stainless steel handrails to outer edge of pool as per council requirements
and landscape architect's details surrounding Unit 205 terrace and landscape architect's details E MCU DA MS 05.08.20
SETOUT POINT BAL-PF1 Property Boundary Information Response
up
BAL-PF1 BAL-PF1 H
F GIA Issue MS 07.04.21
BAL-PF2
BAL-PF2
C BAL-ST3
New pool type fence N-RWO
BAL-PF3
Void dn to existing property C
Interior waterproofing N-COL Gate BAL-ST3 boundary line to
TL-01 fall by pool contractor future detail. EX-FWG
N-RWO BAL-PF1
G
at Kids pool New concrete pavers / stepping
e stones connecting basement
Planter dn dn
N-RWO
Main pool Existing pool stair, entry and outdoor shower
(to be extended)
Seat
PGD
TGD EX-DP
3
Approximate location Existing beach
Screen
PF
SC-24
up N-FWG up N-FWG New landscaping to
L-
N-RWO N-RWO
Pool terrace PGD of original opening in umbrella, stand and
BA
U205 terrace TL-01 N-RWO supplement existing
podium slab table to be retained
PGD
(new tiled finish) (new tiled finish)
fall
fall
fall N-COL dn New service Existing stair to basement New turf
TL-01
lid to balance New planters to match
N-DP N-DP TL-02 to be retained. New tiles
tank suitable new garden edging New, reconfigured entry /
to treads and landings
Existing Restaurant
BAL-PF3
Slotted tile insert drain Walkway
Gate
New grated drain PGD
Planter
New service lid to balance for tile inlay exit fire escape stairs, ramps
totoPool
poolTerrace.
terrace part of pool package (new tiled finish) and platforms to conform
tank suitable for tile inlay dn (no works)
New H New blockwork wall New tiled surface
with current building
TGD TGD standards to future details
Plunge N-RWO N-RWO N-RWO planter, level with walkway to all terraces
Pool Planter
BAL-PF1
fall
fall
fall
dn dn dn dn dn
BAL-PF4 BAL-PF4 BAL-PF4 BAL-PF4 BAL-PF4
N-FWG Gate up up up Gate up Gate N-FWG EX-DP EX-DP EX-DP EX-DP offsets EX-DP
EX-DP N-FWG Gate N-FWG up Gate N-FWG Screen Screen
N-RWO N-RWO N-RWO offsets in wall offsets in wall offsets in wall in wall offsets in wall
in wall SC-23 SC-22
BAL-PF6
Existing beach U206 terrace U207 terrace U208 terrace U209 terrace U210 terrace U211 terrace U212 terrace U213 terrace U214 terrace U215 terrace U216 terrace
up dn H umbrella, stand and (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish)
EX-DP
(new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish)
table to be retained TL-01 TL-01 EX-DP TL-01 TL-01 offsets in wall TL-01 TL-01 TL-01 TL-01 TL-01 TL-01 TL-01
Bricks
Bricks
Glass
Bricks
Bricks
Bricks
Bricks
BAL-PF6 Gate
Glass
fall
fall
fall
fall
fall
fall
fall
fall
fall
fall
fall
Glass
Glass
Glass
Glass
TL-02
EX-DP Glass
in wall Bricks
N-FWG
Gate BAL-PF1
EX-DP
try t
en uran
U205 terrace Sc
sta
SC reen
BUILDING A BUILDING B
Re
(new tiled finish) -21
up
N-RWO
fall EX- Landing N-COL
HYD TL-01
dn
N-FWG
TL-01
dn
SC reen
U205 U206 U207
-20
U208 U209 U210 U211 U212 U213 U214 U215 U216
Sc
EX-DP in wall
3
L-0
N- N-RWO
BA
RWO TL-07
ir
Sta
Line of new blockwork
fa
ll
w
wall extension to
Ne
GD existing shown under
T2
L-S
U204 terrace New roof over wine
BA
(new tiled finish) Existing Units bar / lounge area.
New storage and sanitary Ga
te
fa facilities above existing
TL-07 ll (no works) Provide fire separation
substation on elevated N-COL
measures as part of Existing Units floor to future details.
Select powdercoated alum. NCC requirements (no works)
ct
'Heka' hood over new
Du
BA up
L- grilles to laundry below
B1 Glass
Bricks
Planter N-COL
FL GP Maintenance
fall
BAL-01
Walkway Store
SC reen
N-RWO EX-DP in wall
-19
Provide new proprietary type waterproof (new tiled finish) New
Sc
Planter
tanking membrane to existing planter slabs fall New sanitary
Fascia gutter
D
OVF
EX-
G
as per manufacturer's recommendations TL-07 New
U203 terrace Box gutter fall Void New planter New planter PWD facilities - 19 m2
ick s
DP
Roof HYD
Br las
s
and landscape architect's details OC
G
(new tiled finish) 5° EX-COL
BAL-01
fa TL-07 See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
About this file
- File size
- 20.9 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.