Council archive · source document
Netanya Refurb_GIA Issue Set_210407 · 51901.3614.02
Attached to the e-mail Generally in Accordance - Landscaping & Colour Palette - 51901.3614.02, 51901.3786.03, 51992.479.02, 51994.1249.02, 51994.1048.02 & MCU13/0081.02.
Very large file (20.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
Existing storage - 2 no. new C MCU DA Issue MS 06.03.20
A B
8 m2 car spaces D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
F
K GIA Issue MS 07.04.21
C
Screen
C
BAL-ST3
AC AC AC AC AC
EX-HYD BAL-ST3
EX-COL
N-FWG
Plant Room Maintenance New New
5400
up
Change car space car space
Store
Room
5 6 7 8 9 10 11 12 13 14 Gate ES
2800
Screen Screen 37 38 N-COL 15 16 17 18 19 20 21 22
tra ease
Change
Gr
p
BOL Room
Filtration Equipment
New line marking to
Select new paint finish to all delineate car parking spaces
BUILDING B
4 walls, columns and soffits.
5335
New line marking to Wine
BUILDING A
Provide non-combustible
delineate car parking spaces
nt
Carpark Carpark Cellar
6160
BOL render and paint finish to all
me
new walls as indicated
uip
te
K
Ga
EX-DO
eq
BOL
ply
lis
rel
up
Existing stair over to remain,
eT
3
ss
entering 'Sails' restaurant
ap
Ga
Ga
sc
EX-HYD te
nd
La
AC EX-HYD 29 Sc
EX-HYD EX-HYD ree FHR TL-12 Planter
n
Screen Gate Gate Screen
36 28 27 26 25 24 23 up
Gate
New pool pump &
T3
Sta w
Filtration Equipment
EX-DO EX-DP
ir
Ne
L-S
filtration equipment
T3
2 New, reconfigured Hot Water
Pool
L-S
BA
to Plant Room. Refer entry / exit fire escape Systems up dn
BA
Screen
to Pool consultant's
30 Plant stairs and platforms to Ste
Gate
Storage Conference Room
Screen
drawings. conform with current px
2
(no works) (no works) EP-A Store Store building standards to
te
Screen
35
Screen
Epoxy Floor finish
Ga
future details EX-
6025 to cover equipment
TL-12
Carpark
Gate
Manhole plinths as required. HYD N-COL ES
dn
1
T3
3
Bin
L-0
up Server SK
L-S
EX-HYD Wash EX-HYD EX-HYD EX-HYD
BA
SW MH AC
T3
BA
EX-HYD 31
L-S
HWS FHR
EX-HYD up
FEX
BA
Elec.
WM dn
WM Storage WC Male WC 34
TL-13 TL-12
HWS Toilets New Main Switchboard as 2000 mm clear head
Metal height between stair
WC
per manufacturer's and
Wine Cellar louvres
Laundry or electrical engineer's details, landing and floor slab over
Linen / rid (no works)
Sta w
r with 2 no. removable
T2
ir
Ne
Co
Linen
Female
L-S
TL-12
Trolley bollards for protection 32 up
Toilets
BA
New Screen
between board and car park
DRY Room TL-13
33
Elec.
up TL-12 up Carpark N-COL Entry
Existing
Office Commercial Kitchen Plant TL-07 Provide extension to existing
Wine Bar
ct
DRY WM T Chemicals See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
About this file
- File size
- 20.9 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.