Original source · versioned page text
Attachment 1 - Amended advice form Rob Friend and Associates
Attached to the e-mail Applicant Response to SARA Advice Notice - 132005.638.04.
Necessary
clearing set back
Necessary for radiant heat
clearing line flux 29kW/m2 -
Essential does not change 12.4m from
management between existing proposed
clearing set back and proposed infrastructure
from proposed development in
infrastructure - 1.5 this area
times the tree ht - Essential
24m management
clearing set back
from existing
infrastructure -
1.5 times the tree
ht - 24m
24m
Necessary
12.4m
clearing set back
for radiant heat
flux 29kW/m2 -
New fence line 12.4m
Edge of existing
development -
shown yellow
New fence line
USE FIGURED DIMENSIONS. ISSUE AMMENDMENT Title Exempt and necessary clearing -
FLEXURE Pty Ltd CLIENT
NOOSA COUNCIL DO NOT SCALE FROM THE
DRAWINGS. CONFIRM ALL
date details
proposed and current devpmt.
GRANT CALDER ARCHITECTURE AND URBAN DESIGN Date
DIMENSIONS ON SITE PRIOR 1 September 2025
TO CONSTRUCTION OR
FABRICATION. IT REMAINS Scale 1:500 @ A3
PROJECT RECYLE/TRANSFER STATION CENTRE THE CONTRACTORS
21 Bursaria Street Peregian Beach RESPONSIBILITY TO ENSURE Drawn Grant Calder
SP298776 561 Noosa Eumundi Road COMPLIANCE WITH ALL
ph: 0488 084 184
email - [email protected] PLANNING APPLICATION RELEVANT CODES AND
REGULATIONS IS Checked Grant Calder
Registered Architect- BOAQ 3112 MAINTAINED AT ALL TIMES.
Drawing No GC 147
135 MPAC 3 Issue - 0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.