Council archive · source document
PART Response to Information Request · OPW11/0335
Very large file (26.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
7.0 LONG TERM MAINTENANCE OF STORMWATER MANAGEMENT FACILITIES
Management actions for keeping the treatment train in working order are listed in Table 7-1, and
are described in detail in Appendix D. The maintenance actions required do not vary between
Stage 1 and the ultimate development. Management of stormwater during the construction
phase will be covered by the Sediment and Erosion Control Plan.
Table 7-1: Management Actions of the Essence of Pereoian Stormwater Management Plan
Management Description
Action
Maintaining the 3kL rainwater tank volumes associated with each beach
EP-SMP-01
shack
Maintaining the 100kL underground rainwater tanks associated with the
EP-SMP-02
ornamental garden irrigation scheme
EP-SMP-03 Maintaining the vegetated buffer zones
EP-SMP-04 Irrigating the ornamental gardens
EP-SMP-05 Maintaining the bio-retention trenches
EP-SMP-06 Maintaining the pipe infrastructure
EP-SMP-07 Maintaining the terminal wetland
©2012 Simmonds & Bristow Pty Ltd Contrast Constructions J-1005-310 - 13 January 2012
I.\CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3 0_ta_120113 doc Page 12 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PART Response to Information RequestRelated documentApplication case desk ↗
About this file
- File size
- 26.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.