approximately 2500 kg/year, whereas the annual load from stage 1 of the developed site
is reduced to 77 kg/year (Appendix B). Likewise, annual loads for total nitrogen reduce
from 34 kg/year to 18.1 kg/year and the annual load for total phosphorus reduces from
5.9kg/year to 1.81 kg/year (Appendix B).
Water Quality predictions from the MUSIC model (Appendix B) indicate that
contributions of total suspended solids, nitrogen and phosphorus in treated stormwater
from the Stage 1 developed site (Table 6-3) comply with the required water quality
objectives (Table 3-1) and are not worse than the existing case (Table 6-2).
Table 6-3: MUSIC Model Results - Staae 1 Site
Water Quality Indicator Result
Estimated long-term load (kg/year) % reduction Load (kg/year)
Suspended Solids 77 567
Total Phosphorus 69 1.81
Total Nitrogen 46 18.1
6.3.3 Full Development Modelling
Results of MUSIC modelling showed that there will be no net increase in stormwater
runoff from the site. Loads of sediment, total nitrogen and total phosphorus will be
substantially removed from stormwater before entering the Noosa National Park
(Appendix B).
Modelling for the fully developed site predicted a 30 reduction in stormwater entering
Noosa National Park, from 19 ML/year to 13.3 ML/year. The annual load of total
suspended solids from the existing site (the caravan park) was predicted to be
approximately 2500 kg/year, whereas the annual load from the fully developed site is
451 kg/year (Appendix B). Likewise, the annual load for total nitrogen reduces from 34
kg/year to 20 kg/year and the annual load for total phosphorus reduces from 5.9kg/year
to 1.8 kg/year (Appendix B).
Water Quality predictions from the MUSIC model (Appendix B) indicate that
contributions of total suspended solids, nitrogen and phosphorus in treated stormwater
from the developed site (Table 6-4) comply with the required water quality objectives
(Table 3-1) and are not worse than the existing case (Table 6-2).
Table 6-4: MUSIC Model Results - Fully Developed Site
Water Quality Indicator Result
Estimated long-term load (kg/year) % reduction Load (kg/year)
Suspended Solids 88 451
Total Phosphorus 79 1.79
Total Nitrogen 56 20.3
02012 Simmonds & Bristow Pty Ltd Contrast Constructions J-1005-310 - 13 January 2012
I \CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update 09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3.0_ta_120113.doc Page 11 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PART Response to Information RequestRelated documentApplication case desk ↗
About this file
- File size
- 26.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.