Skip to the record
Accept no substitutions.

Council archive · source document

PART Response to Information Request · OPW11/0335

of 97

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (26.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

The SECP also coordinates stormwater management with construction milestones, for effective
implementation of sediment erosion and control measures during the construction phase.

The plan layout of the SECP in the proposed development area is shown in Drawings 1108-
155C-01-07 and 1108-055C-01-08 (Appendix E), which shows where erosion management
structures need to be placed during construction activities. Slope-related erosion hazard areas
within the development site were identified from the topographic map (Drawing J-1005-310-09
in Appendix C), and represent control points within the construction site where particular care
will be needed. The management actions for controlling erosion of the site, and movement of
sediment and nutrients from the site, are described in Table 8-2. The detail management plans
for sediment and erosion control are described in Appendix E.

Table 8-2: Sediment and Erosion Control for Construction of the Essence of Pereaian
    Management Action                                                        Description
  EP-SECP-01                           Up-slope stormwater flow diversion.
  EP-SECP-02                           Site entry and exit points.
  EP-SECP-03                           Designated on-site stockpiles and waste receptacles.
  EP-SECP-04                           Down slope sediment controls.
  EP-SECP-05                           Maintaining ground cover.




©2012 Simmonds & Bristow Pty Ltd                        Contrast Constructions                           J-1005-310 -13 January 2012
1 1CLIENTFILES1Contrast Constructions11108-155c - Essence of Peregian SCEP Stage 1 Update109 Output Documents\1108-155C SWMP
SCEMP_Scanbn Property Group V3.O_ta_120113.doc                                                                           Page 14 of 24

Used in these records

About this file

File size
26.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PART Response to Information Request.pdf · 26.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.