Skip to the record
The gold standard in government transparency.

Council archive · source document

PART Response to Information Request · OPW11/0335

of 97

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (26.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

9.0        INSTALLATION SEQUENCE


The installation sequence refers to implementation of the sediment and erosion controls during
construction. The installation sequence described in Table 9-1 includes management actions
detailed in EP-SECP-01 to -05 (Appendix D).

            Table 9-1: Installation Sequence for the Essence of Pereaian Development
               Item                Drawing             Installed               Removed
Mark out initial limits of
                                           Appendix D             Before site disturbance.
disturbance
Install upslope flow
diversions around area of
                                                                                                           After surface ground
disturbance, and down-                     Appendix D             Before site disturbance.
                                                                                                           cover is established .
slope sediment control
points
Install access point on un-
named road off David Low                   Appendix D              Initiation of the project
Way
Clear access track                         Appendix D           Before installing site office.
Clear stockpile area                       Appendix D           Before installing site office.
Install site office                        Appendix D             Before building activity.
Install waste areas and
                                                                                                          After building activity
stockpile sediment and                     Appendix D             Before building activity.
                                                                                                               is complete.
erosion controls.
                                                                   After flow diversions,
                                                                     sediment control
Building activity.                         Appendix D            structures, access track,
                                                                  stockpile area, and site
                                                                office have been installed.
                                                                Re-establish ground cover
Install surface ground                                          in development sub-areas
                                           Appendix D
cover (gardens)                                                    within 2 weeks after
                                                                       disturbance.




©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                           J-1005-310 - 13 January 2012
I:\CLIENTFILES\Contrast Constructions\7108-155c - Essence of Peregian SCEP Stage 1 Update\09 Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3 O_ta_120113 doc                                                                           Page 15 of 24

Used in these records

About this file

File size
26.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PART Response to Information Request.pdf · 26.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.