Skip to the record
The gold standard in government transparency.

Council archive · source document

PART Response to Information Request · OPW11/0335

of 97

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (26.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

 13.0       COMPLIANCE CERTIFICATE

Simmonds & Bristow hereby certifies that the Stormwater Management Plan, as detailed within
this report, "Essence of Peregian, Stormwater Management Plan & Sediment & Erosion Plan,
Simmonds & Bristow, December 2011," (including the associated drawings listed and attached
herein - 1108-155C-01-01 to 1108-155C-01-08), if implemented and maintained on site in
accordance with the detailed instructions set out for both the Operational and Construction
Phase of the development contained within the report, will result in compliance with the relevant
conditions of development consent, in particular:

Condition 61 - " All stormwater drainage (including roof water overflow from the rainwater
storage system) shall be collected and discharged so there is no net increase in stormwater
runoff from the site.

Condition 62 - " A detailed Stormwater Management Plan and a Sediment and Erosion Control
Plan shall be prepared that refines the MUSIC modelling prepared for the concept report.

Condition 63 - "Grease and Oil arrestors and/or stormwater quality improvement devices must
be incorporated into the design to treat all run-off prior to run-off exiting the premises.

Condition 64 - "A detailed maintenance plan shall be prepared for the proposed stormwater
management system - refer specifically to Section 7.4 and Appendix D.

This report and the certification included within it has been prepared for a specific location and a
specific development proposal, as described in this report. Any changes to the development
layout, sequencing, or the relative areas of pervious, impervious or roof areas made
subsequent to this certification shall render this certification void and an amended certification is
to be obtained.




Signed:                                                           Date:

David Bristow MIEAust, CPENG, RPEQ




©2012 Simmonds & Bristow Pty Ltd                          Contrast Constructions                          J-1 005-310 - 13 January 2012
I.\CLIENTFILES\Contrast Constructions\1 108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3.0_ta_120113 doc                                                                            Page 22 of 24

Used in these records

About this file

File size
26.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PART Response to Information Request.pdf · 26.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.