Council archive · source document
PART Response to Information Request · OPW11/0335
Very large file (26.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
13.0 COMPLIANCE CERTIFICATE Simmonds & Bristow hereby certifies that the Stormwater Management Plan, as detailed within this report, "Essence of Peregian, Stormwater Management Plan & Sediment & Erosion Plan, Simmonds & Bristow, December 2011," (including the associated drawings listed and attached herein - 1108-155C-01-01 to 1108-155C-01-08), if implemented and maintained on site in accordance with the detailed instructions set out for both the Operational and Construction Phase of the development contained within the report, will result in compliance with the relevant conditions of development consent, in particular: Condition 61 - " All stormwater drainage (including roof water overflow from the rainwater storage system) shall be collected and discharged so there is no net increase in stormwater runoff from the site. Condition 62 - " A detailed Stormwater Management Plan and a Sediment and Erosion Control Plan shall be prepared that refines the MUSIC modelling prepared for the concept report. Condition 63 - "Grease and Oil arrestors and/or stormwater quality improvement devices must be incorporated into the design to treat all run-off prior to run-off exiting the premises. Condition 64 - "A detailed maintenance plan shall be prepared for the proposed stormwater management system - refer specifically to Section 7.4 and Appendix D. This report and the certification included within it has been prepared for a specific location and a specific development proposal, as described in this report. Any changes to the development layout, sequencing, or the relative areas of pervious, impervious or roof areas made subsequent to this certification shall render this certification void and an amended certification is to be obtained. Signed: Date: David Bristow MIEAust, CPENG, RPEQ ©2012 Simmonds & Bristow Pty Ltd Contrast Constructions J-1 005-310 - 13 January 2012 I.\CLIENTFILES\Contrast Constructions\1 108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP SCEMP_Scanlon Property Group_V3.0_ta_120113 doc Page 22 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PART Response to Information RequestRelated documentApplication case desk ↗
About this file
- File size
- 26.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.