Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

PART Response to Information Request · OPW11/0335

of 97

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (26.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

12.0       CONDITIONS AND LIMITATIONS

The data contained in this volume has been commissioned by Scanlon Property Group, Limited
on behalf of Thomco Limited, to support a Development Application for Operational Works
associated with the development known as 'Essence of Peregian' located at 215-219 David
Low Way, Peregian Beach.

In preparing this report, Simmonds and Bristow has, in part, relied on survey data, flood level
data, calculations and previous reports prepared by Council and external consultants to support
the original development application, and the preparation of Joint Experts Reports for the court
ordered mediation process associated with the preparation of the negotiated approval
conditions.

While reasonable precautions have been taken to validate the data provided before its
incorporation into modelling and design procedures, the absolute accuracy of such data cannot
be guaranteed with certainty and may vary over time as site conditions change. As such, it is
anticipated that minor changes may be required on site to allow the recommendations of this
plan to be implemented effectively.

Minor or temporary changes to accommodate on-site conditions during the construction phase
should be made in consultation with a suitably qualified and experienced professional engineer
or qualified sediment and erosion control specialist.

Any proposed permanent changes required to the layout, geometry, depth and/or volume of bio-
filtration basins and/or wetland elements as a result of any site conditions that are different to
those assumed and modelled during design, should be referred back to the designer, or to a
suitably experienced and qualified stormwater management consultant, and resubmitted to
Council for compliance re-certification and approval.

The Stormwater Management Report contained within this report comprises of all constituent
parts of the report in full, including the text, calculation summary and appended drawings. If
additional copies of this report are required, separate sections or individual pages must not be
copied in isolation.

Except for archival and record keeping purposes, this report should not be copied and stored in
any electronic media or passed onto other parties without the express written permission of
Simmonds & Bristow.

No part of this report may be copied or used for any other purposes other than the purpose
stated in this report.




©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                          J-1005-310 - 13 January 2012
I \CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update 09_Output Documents\1108-155C_SWMP
SCEMP_Scanton Property Group V3.0 ta_120113 doc                                                                          Page 21 of 24

Used in these records

About this file

File size
26.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PART Response to Information Request.pdf · 26.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.