Council archive · source document
PART Response to Information Request · OPW11/0335
Very large file (26.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
12.0 CONDITIONS AND LIMITATIONS The data contained in this volume has been commissioned by Scanlon Property Group, Limited on behalf of Thomco Limited, to support a Development Application for Operational Works associated with the development known as 'Essence of Peregian' located at 215-219 David Low Way, Peregian Beach. In preparing this report, Simmonds and Bristow has, in part, relied on survey data, flood level data, calculations and previous reports prepared by Council and external consultants to support the original development application, and the preparation of Joint Experts Reports for the court ordered mediation process associated with the preparation of the negotiated approval conditions. While reasonable precautions have been taken to validate the data provided before its incorporation into modelling and design procedures, the absolute accuracy of such data cannot be guaranteed with certainty and may vary over time as site conditions change. As such, it is anticipated that minor changes may be required on site to allow the recommendations of this plan to be implemented effectively. Minor or temporary changes to accommodate on-site conditions during the construction phase should be made in consultation with a suitably qualified and experienced professional engineer or qualified sediment and erosion control specialist. Any proposed permanent changes required to the layout, geometry, depth and/or volume of bio- filtration basins and/or wetland elements as a result of any site conditions that are different to those assumed and modelled during design, should be referred back to the designer, or to a suitably experienced and qualified stormwater management consultant, and resubmitted to Council for compliance re-certification and approval. The Stormwater Management Report contained within this report comprises of all constituent parts of the report in full, including the text, calculation summary and appended drawings. If additional copies of this report are required, separate sections or individual pages must not be copied in isolation. Except for archival and record keeping purposes, this report should not be copied and stored in any electronic media or passed onto other parties without the express written permission of Simmonds & Bristow. No part of this report may be copied or used for any other purposes other than the purpose stated in this report. ©2012 Simmonds & Bristow Pty Ltd Contrast Constructions J-1005-310 - 13 January 2012 I \CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update 09_Output Documents\1108-155C_SWMP SCEMP_Scanton Property Group V3.0 ta_120113 doc Page 21 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PART Response to Information RequestRelated documentApplication case desk ↗
About this file
- File size
- 26.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.