Skip to the record
Accept no imitations.

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval

of 46

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Wr                   RoadPro
                             on
                               oO
                                 >             DEVELOPMENT
                                Ce

                                                                www.roadpro.net.au
                                                               ABN 98 615 073 565 | ACN 165 601 687
                                                                        P. 0403 889 039
                                                                E. [email protected]
                                                       15/76 Wises Rd Maroochydore Q 4558
                                                         PO Box 303 Coolum Beach Q 4573

     11'" December 2013

     Cooroy Property Trust
     C/- Adams Sparkes Town Planning + Development
     PO Box 1000
     Buddina Qld 4575

     Dear Cameron,

;    RE:    Cooroy Mountain Spring Water
           Access Arrangements and Trip Generation
            Lot 2 SP 143409 at 314 Cooroy Mountain Road, Cooroy
     | refer to our meeting with Council offices held on Monday 18'" November 2013 and
    further traffic engineering advice regarding the number of trucks generated from the
     site and the access arrangements into the site.

    The conditions of approval require a change due to ownership changes and changes
    to the operational management of the business. The proposed bottling plant will be
     scaled back and therefore changes to conditions, 5B, 5C, 5F, 5G, 8, 12 and 13 are
     required as the specific numbers of staff and trucks has been reduced. From a traffic
     engineering perspective a review of the existing access has been undertaken in order
    to recommend an amendment to Condition 8 of the approval.

            Condition 8
            The applicant shall relocate the existing site to a location between 80 and 110
            metres east of the existing access on Cooroy Mountain Road, to the
            reasonable satisfaction of Council.

     Proposed Development
    The proposed development includes a bottling plant with between 3 to 5 staff
     permanently on site.

    RoadPro Development                                                ABN 98 615 073 565
     13492 Cooroy Mtn Spring Water Access                                     Page | of 4
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.