Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval

of 46

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

> future-plus
                                                                            ENVIRONMENTAL
4377-131119-1.0
2.0 SITE ASSESSMENT
2.1 GENERAL
The assessment and recommendations contained in this report have been based on the recent
geotechnical investigations carried out and our recent site assessment of the existing sewage
infrastructure on-site.

2.2 PROPERTY DETAILS
The subject site is contained within registered allotment described as Lots 2 SP143409 and is
located at 314 Cooroy Mountain Road, Cooroy Mountain within the Sunshine Coast Regional
Council local government area. The area of the allotment is approximately 481 ,700m?.

2.3 EXISTING DEVELOPMENT
The site consists of an existing five (5) bedroom dwelling and the Cooroy Mountain Spring
Water bottling factory, which is utilised by five (5) daytime staff only. The site also contains
a series of free standing sheds.

2.4 PROPOSED DEVELOPMENT
The owner proposes to direct all wastewater generated by the existing dwelling and factory
office facilities to a centralised STP and effluent disposal area.

2.5 TOPOGRAPHY
The subject allotment is situated over a varying topography with a slope of 5-20% from east
to west, towards the existing creek located in the western portion of the property. The
Sunshine Coast Regional Council online mapping facilities illustrate a site elevation between
110 to 280m AHD.

2.6 SITE HYDROLOGY
It is likely that the majority of rainfall on the site will be absorbed into the soil. However,
during extended periods of heavy rainfall, excess rainfall not adsorbed into the soil profile is
likely to flow towards the watercourse located in the western portion of the property, running
parallel with Cooroy Mountain Road.

2.7 SUB-SURFACE CONDITIONS
A   preliminary  geotechnical   investigation for  effluent  disposal  assessment   including
percolation testing was recently carried out within the locations indicated on the Borehole

February 2014                      Site & Soil Evaluation Report                         4
                                Wastewater Treatment and Effluent Disposal
                                314 Cooroy Mountain Road, Cooroy Mountain
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.