Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval

of 46

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Appendix A
.        ‘1.    APPLICATION DETAILS
          Application No:              132006.268.02                                              |
          Street Address:             | 314 Cooroy Mountain Road Cooroy Mountain Qid 4563         |
         _ Real Property Description: | Lot 2 SP 143409                                           |
          Planning Scheme:            | The Noosa Plan (16 September 2013)
         '2     RELEVANT PERIOD OF APPROVAL
          The relevant period for this Development Approval is identified in the Assessment Manager
          conditions.
         3     ASSESSMENT MANAGER CONDITIONS
          Land Use
          Approved Plans
          1. | Development undertaken in accordance with this approval must generally comply with
               the approved plans of development. The approved plans are numbered SKO1 and
               SK02 dated 2 August 2010 and as may be amended by these conditions.
          2.   The development must be undertaken and operated in a manner that causes no
               detrimental effect upon the amenity of the neighbourhood by reason of the creation of
               excessive noise, lighting nuisance or other emissions.
          Vehicle and Truck Movements
          3.   All vehicles associated with the use shall travel to the site via the western end of
               Cooroy Mountain Road.
          4.   -
          5.   -
          5A.  Trucks are not to arrive at or leave the premises outside the hours of 7.00am to
               6.00pm Monday to Friday
          5B.  -
          5C.  Trucks attending the site must not exceed a total of 8 trucks per day and must not
               include B-Doubles.
          5D.  Truck Driver will comply with the requirements of the Truck Drivers Code of Conduct”
               dated 2 August 2010 which requires, amongst other things but is not limited to:
               (a)   The use of engine/exhaust brakes along Topaz Street and Cooroy Mountain
                     Road be prohibited except in case of an emergency (i.e. safety requirement);
               (b)   Maximum speed on Topaz Street and Cooroy Mountain Road to be 60 km/hr.
          Hours of Operation
          5E.  The hours of operation for the use are limited to 6:00am to 6:00pm Monday to Friday.
         Maximum Staff
         5F.   A maximum of 12 staff (including drivers) are permitted on the premises during the
               hours of operation and are not permitted prior to 6:00am.
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.