Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval

of 46

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

5G.  -
 Home and Office Deliveries
 5H.  No home or office delivery staff or vehicles shall operate from the premises.
 Miscellaneous
6.    Existing trees on the site and within road reserves are to be retained, except where
      required to be removed due to building operations or the conduct of the approved use.
      These landscape plans required to be submitted are to denote areas of existing
      vegetation or existing trees proposed or required to be retained.
 7.   Any advertising sign or device is to comply with Council's policies on advertising.
 Land Development
 Vehicle Access and Frontage Works
 8.   The existing site access shall be upgraded. The works must be undertaken as part of
      an Operational Works application and include the following:
      (a)   Design and construction generally in accordance with Council's Standard
            Drawing No SEQ R-056.
      (b)   The clearing of vegetation in the road reserve as described in the submitted
            Traffic Impact Assessment prepared by RoadPro Development dated 11
            December 2013.
      (c)   Any other clearing necessary to provide the “Safe Sight Distance” as indicated
            on Council’s Standard Drawing No SEQ R-056.
      (d)   Additional signage in Cooroy Mountain Road warning of “Trucks Turning”. The
            signage must be in accordance with the current edition of the Manual of Uniform
            Traffic Control Devices Queensland.
        The ongoing maintenance of the site access, associated clearing and signage is the
        property owner's responsibility.
 9.   The access driveway extending from the Cooroy Mountain Road frontage to the
      buildings must have a sealed surface and be maintained in good order.
 10.  All vehicles shall enter and leave the site in a forward direction.
 Loading Areas
 11.  Sealed loading and manoeuvring areas for the heavy vehicles shall be provided on site
      generally as shown on drawing number SK-01, dated 2 August 2010 and shall comply
      with the requirements of AS 2890.2-2002 where applicable.
 Car Parking
 12.  A sealed car parking area shall be provided on site generally as shown on drawing
      number SK-01, dated 2 August 2010 and shall comply with the requirements of
      AS/NZS 2890.1-2004 where applicable.
 13.  A minimum of 13 uncovered carpark spaces shall be provided on site, including 1
      clearly defined disabled carpark space.
 14.  All carparking shall be kept, maintained and line-marked in a condition fit for use.
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.