All wastewater generated from the dwelling and factory office
facilities are to be diverted to the existing septic tank located
. geographically downslope of the waste generating facilities. The
Treatment Standard: existing septic tank is to be converted to a pump station, with all
collected wastewater pump to an STP capable of treating the
wastewater to a Secondary or Advanced Secondary standard.
Land Application System: Surface (heavy droplet) Irrigation System
Land Application Area: 500m irrigation area
, . In accordance with those contained within the Queensland Plumbing
Satbak distancen: and Wastewater Code
A diversion drain/bund and/or cut-off drain is to be constructed up
slope of the land application area in order to intercept both surface
and sub-surface water prior to entering the land application area.
A retention mound is to be constructed downslope of the land
application area to prevent any surface water from exiting the
System Recommendations: Gesignatad Gsposal aren.
Grease trap to be installed.
Existing Septic System to be converted to a pump station. Effluent to
be pumped to the new STP. Locate sanitary drainage line from office
facilities / toilets and plumb to pump station.
February 2014 Site & Soil Evaluation Report 14
Wastewater Treatment and Effluent Disposal
314 Cooroy Mountain Road, Cooroy MountainSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.