Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval

of 46

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Pp future-plus_
                                                                            ENVIRONMENTAL
4377-131119-1.0

5.0 CONCLUSION
This report presents recommendations on the sizing of an effluent disposal system (surface
irrigation) to cater for the combined use of the existing development and the population
intensities associated with this.

The assessments and recommendations are based on our site assessment and the geotechnical
investigation carried out.

On the basis of the geotechnical investigations and assessment of the flow rates, the subject
allotment is considered suitable for on-site sewage operations within the site. An effluent
irrigation area of approximately 500m? will be required to adequately dispose the treated
wastewater generated from the development intensity.

Provided the on-site sewerage facility is installed in accordance with the recommendations
provided and relevant codes and standards aforementioned in this report, there will be
minimal risk of environmental impact to the site and surrounding areas. The on-site STP and
effluent disposal area will need to be managed intensively to minimise potential human health
risks and thereby protect and enhance the quality of human health and the environment in the
long term.   The system must be operated         and maintained in compliance with        the
manufacturer’s guidelines (information should be sought from the treatment system
manufacturer), to ensure this risk is appropriately managed.

All wastewater should be treated to a minimum secondary or advanced secondary level to
reduce any potential environmental impacts.

Details of the wastewater treatment plant and land application system are summarised below;

February 2014                      Site & Soil Evaluation Report                          13
                                Wastewater Treatment and Effluent Disposal
                                314 Cooroy Mountain Road, Cooroy Mountain
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.