28. As no Plumbing Final has been issued through Noosa Council Plumbing Services, all
existing plumbing and drainage, along with Backflow Prevention Devices, are to be
assessed to ensure compliance with current Legislation and Acts.
Additional Conditions
A1. The effluent holding tank and STP shall have visual and audible high level alarms
systems installed with secondary power backup (eg: battery power).
A2. The effluent facilities and grease trap facility shall be serviced and maintained on a
three monthly service regime with all documentation for maintenance and servicing
forwarded to Noosa Council.
| 4 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the
Assessment Manager conditions.
5 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form
conditions of approval:
1. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their
responsibilities under the Disability Discrimination Act (DDA) in regard to the
installation of disabled access and the provision of disabled facilities, and that
access to this building and the provision of sanitary facilities may need to comply
with the requirements of Section D Part D3 and Section F Clause F2.4 of the Building
Code of Australia.
2. Noise from building works associated with commercial and or industrial
development should comply with the following —
° Limited to between 7:00am to 6:30pm Monday to Saturday.
e All reasonable measures are taken to minimise noise emissions.
e Not permitted on Sunday or public holidays.
3. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
paint, cement, concrete, builder's waste or rubbish should not be permitted to enter
or be placed where it could reasonably be expected to move into a roadside gutter,
storm water drain or a watercourse. On the spot fines apply for such offences.
4. The applicant is informed that payment via credit card transaction will not be an
acceptable method of payment for development contributions conditioned in this permit
or for infrastructure charge notices issued separately.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person
who carries out an activity must take all reasonable and practicable measures to ensure
the activity does not harm Aboriginal cultural heritage”. |t is an offence to fail to comply with
the duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an
activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural
heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to
discuss any obligations under the ACH Act.See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.