Skip to the record
Every meeting, every word.

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval

of 46

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

24.  As Constructed drawings and data shall be certified by a qualified experienced Civil
      Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the
      location, level and type of all services and structures. All of which shall be submitted
      to Council for checking and for Council's records.
      The data must fully detail levels for all engineering works including but not limited to
      drainage structures, finished ground levels and pavement surface levels.  The data
      shall be submitted in the Asset Design and As Constructed (ADAC) digital format.
      (Guidelines on the use of ADAC are available at www.adac.com.au).
      Approval of works shall not be granted until all As Constructed information has been
      supplied and accepted by Council.
Environmental Health
25.   The developer must provide waste storage and disposal facilities in accordance with
      Planning Scheme Policy No 9 “Waste Management Multi-Dwellings and Commercial
      and Industrial Premises”, including an external imperviously paved area correctly sized
      for all refuse and recycling containers and suitably screened from public places and
      neighbouring properties. A roofed waste/bin wash area is required with a cold-water
      tap, hose and drain outlet connected to sewer, or approved wastewater disposal
      system via a bucket trap and grease arrestor.
26.   The development must allow refuse-loading areas to be located off street. All vehicles
      associated with the collection of waste/recyclables, shall enter and leave the site in a
      forward direction, without the need for any unsafe manoeuvring.
27.   A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
      No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises’,
      must be submitted for the day-to-day operation of the development and approved by
      Council’s Health Section prior to issue of development permit for operational works.
      It is critical that waste areas are properly planned. A copy of Planning Scheme Policy
      No. 9 explaining exactly how to predict waste quantities and design waste areas is
      available from Council and the web. The Plan shall include the following information: -
      °    The types of waste that will be generated from the activities approved within the
           development.
      .     Estimated volumes or tonnage of both recyclables and waste generated.
      °     Methods to be used for dealing with garden waste.
      °     Initiatives to minimize waste either by waste prevention, reduction, re-use or
            recycling.
      °     Description of procedures for getting all waste to the bins; the storage of bins
           and the collection of bins by the contractor.
      .    A description of the design details of waste storage and recycling areas including
           size, location, elevation and floor plan, methods of bin washing and system to
            prevent storm water getting into sewer via the bin wash.
      °    A description of types and volume of waste storage containers to be used.
      °    The waste and recycling storage area shall include the provision of containers for
            all waste and recycling materials including putresable matter, non-recycling
           waste, paper/ cardboard, glass, aluminum/steel cans, waste oil, styrofoam
            boxes, etc, and bin washing facilities connected to sewer.
      °    A detailed description of vehicular access to collect waste. Where collection is
            off street, access must allow vehicles to enter and leave the site in a forward
            direction.
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 2 to Item 1 - Amended Court Approval(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.