Original source · versioned page text
Attachment F - Addendum to Engineering Report (00016989)
Attached to the e-mail MCU15/0053 Plans & Applicant's Response to Information Request.
Unit Development 30-32 Doonella Street, Tewantin T SUPPLEMENTARY INFORMATION TO ENGINEERING REPORT 1. INTRODUCTION This report shall be read in conjunction with the Tod Consulting report dated 9 June 2015 and has been prepared in response to item 5 of Noosa Council’s Request for Information dated 2 July 2015. 2. PRELIMINARY STORMWATER DRAINAGE DESIGN A preliminary stormwater drainage plan has been prepared (marked up on architectural site plan) and is attached to this report. The plan shows proposed stormwater pipe levels within the site for various areas and demonstrates that a vast majority of the site can be conveyed to the proposed bio retention basin in the south east corner of the site. The exception is the ramp area to the basement car park. This area has been allowed for in the water quality modelling prepared by our sub consultant Aqua Intel. Roof water re-use has also been included in the modelling. It is proposed to locate the rainwater tank in the north east corner of the basement for irrigation purposes. The overflow pipe from the rainwater tank has been set 1.6m above the basement floor height at RL 6.2 to ensure there is sufficient fall to convey the overflow to the bio retention basin. The inlet to the bio retention basin from site drainage pipes has been set at RL 4.8 which is approximately 200mm below the existing ground level at this location. Minor earthworks will be required to form the bio retention basin. The bio basin overflow pit is set at RL 5.1 to provide the 300mm extended detention depth required by the water quality modelling. Outflows from the bio basin flow to a 20m3 detention tank. The outlet pipe level from the basin of RL 4.0 allows for the depth of filter media specified in the water quality modelling report. A 300mm diameter outlet from the detention tank at RL 3.9 connects to the existing drainage pit in Doonella St at this location that has an invert level of RL 3.0. A 2m wide grass lined weir will also be provided from the bio basin to provide overflow capacity from the basin for the Q100 event. Rev B J/N 13672 August 2015 Page 1 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment F - Addendum to Engineering Report (00016989).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.