Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Attachment L Flood Risk Management Plan

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Following the “Rifle Street, Pomona” Drainage Report by Projex Partners for Sunshine Coast
Regional Council 2012, and the “Pomona Flood Study” by Hydrology and Water
Management Consulting, 2013, and as identified in the Disaster management plan -
Pomona, key locations have been established as vulnerable to stormwater, tributary and
creek flooding including;
   ●   Louis Bazzo Drive
   ●   Exhibition Street Cooroora Creek crossing
   ●   Hill Street Cooroora Creek crossing
   ●   Factory Street
   ●   Subway Avenue, North Coast Rail underpass
   ●   Station Street
   ●   Reserve Street culvert near Rifle Street intersection
   ●   Rifle Street
   ●   Railway Parade adjacent to IGA
Log in to download the original file

Attachment L Flood Risk Management Plan.pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.