Original source · versioned page text
Attachment L Flood Risk Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnFollowing the “Rifle Street, Pomona” Drainage Report by Projex Partners for Sunshine Coast Regional Council 2012, and the “Pomona Flood Study” by Hydrology and Water Management Consulting, 2013, and as identified in the Disaster management plan - Pomona, key locations have been established as vulnerable to stormwater, tributary and creek flooding including; ● Louis Bazzo Drive ● Exhibition Street Cooroora Creek crossing ● Hill Street Cooroora Creek crossing ● Factory Street ● Subway Avenue, North Coast Rail underpass ● Station Street ● Reserve Street culvert near Rifle Street intersection ● Rifle Street ● Railway Parade adjacent to IGA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.