Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Attachment L Flood Risk Management Plan

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
       ​
in 2016, substantial flood mitigation measures were implemented in Pomona to reduce the
impacts of subsequent flood events. Upgrades to the Bruce Highway have also delivered
flood mitigation benefits to Pomona and VCQ.




Risk Management Strategies
VCQ has identified over time that improved knowledge, continuity and efficiency of Centre
function, procedures, systems and supports is maintained via the implementation of a local
coordination network (LCN). One of the sectors of this role includes coordination of disaster
risk management in the event of fire and flood. This role is directly facilitated by a network
of core local centre management members. VCQ is confident that the implementation of
this strategy will mitigate risk associated with local flood events.
Log in to download the original file

Attachment L Flood Risk Management Plan.pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.