Original source · versioned page text
Attachment L Flood Risk Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn in 2016, substantial flood mitigation measures were implemented in Pomona to reduce the impacts of subsequent flood events. Upgrades to the Bruce Highway have also delivered flood mitigation benefits to Pomona and VCQ. Risk Management Strategies VCQ has identified over time that improved knowledge, continuity and efficiency of Centre function, procedures, systems and supports is maintained via the implementation of a local coordination network (LCN). One of the sectors of this role includes coordination of disaster risk management in the event of fire and flood. This role is directly facilitated by a network of core local centre management members. VCQ is confident that the implementation of this strategy will mitigate risk associated with local flood events.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.