Site Access and Driveways
28. A sealed access driveway must be provided from Gympie Terrace to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
the conditions held within this Decision Notice.
29. Access onto Gympie Terrace is limited to ‘left-in, left-out’ only.
Car Parking
30. A minimum of 9 car parking spaces must be provided on site. The works must be undertaken
in accordance with the conditions held within this Decision Notice and must include in
particular:
a. 1 visitor parking space within the total and are accessible at all times for visitor use;
b. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
Pedestrian and Bicycle Facilities
31. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with the conditions held within this Decision Notice and must
include in particular a 2.0-metre-wide footpath within the road verge for the entire length of
the site’s frontage.
Stormwater Drainage
32. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the conditions held within this
Decision Notice.
Services
33. Reticulated electricity and telecommunication services must be provided to each unit in
accordance with the standards and requirements of the relevant service provider.
34. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
35. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
36. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
37. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
38. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
39. All fill and associated batters must be undertaken in accordance with the conditions held
within this Decision Notice and be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
Page 5 of 15
Document Set ID: 22622601
Version: 3, Version Date: 17/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - MCU22 0196 & OPW22 0295 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 172 KB (small file)
- File type
No other editions are linked here.