Lake MacDonald Drive Cooroy - WMP
Workplace Management Plan
Lake MacDonald Drive, Cooroy
6. PROJECT DETAILS
This is a Lump Sum Contract (with provisional Quantities) based on AS2124 – 1992. This contract includes:
• live Traffic conditions
• clearing and grubbing,
• cutting and embankment construction,
• road pavement, asphalt surfacing,
• installation of storm-water drainage,
• kerb and channel,
• Concrete works.
The projects contract details are outlined in Table 2
Table 2 – Project Contract Details
Project Name Lake MacDonald Drive, Cooroy
Contract Number
Client Tea Tree Properties ATF The Kakadu Way Discretionary Trust
Superintendent Doug Reynolds – TOD Engineers and project managers
Project Address Lake MacDonald Drive, Cooroy
Project Description Rural Subdivision
Commencement Date 12/10/2020 Project Duration 21/12/2020
SHADFORTH’S CIVIL PTY LTD
Principal Contractor
(PC Details) 99 Sandalwood Lane, Forest Glen, Q 4556 | 07 5458 3300 |
[email protected]
PC’s ABN 68 162 606 377
Shadforth have designated appropriately experienced personnel to work on this project. Each project team
member’s position, name and contact details are outlined in table 3.
Table 3 – Project Management Team
Position Name Contact Details
Construction Manager Jeremy Linton [email protected]
Project Manager James Harris [email protected]
Project Engineer James Harris [email protected]
Foreman Darryl Hart [email protected]
Compliance Manager Mark Lonergan [email protected]
WHSE Advisor Mark Lonergan [email protected]
First Aid Officer Darryl Hart [email protected]
Emergency Warden Darryl Hart [email protected]
Emergency Officer Darryl Hart [email protected]
IMS-04-01_P – Reviewed – September 2020 Document Uncontrolled When Printed Page 7 of 60
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original