Flood Mitigation Investigation: Ashgrove Drive, Cooroy
Option 3 – Ashgrove Drive Culvert Upgrade with Inlet Works & Upstream Bunds
This option is similar to Option 2 expect that a property resumption is not required. Instead, flood
waters are directed to the existing drainage easement at Ashgrove Drive and upgraded culverts
convey flow through the estate. Flood waters are captured with a bund extending to the Bruce
Highway and an improved inlet channel would be constructed leading into the upgraded culverts.
This flood mitigation option was not selected as the preferred mitigation option because it caused
flood impacts over the existing residential properties downstream of Ashgrove Drive.
The basic line-work applied in the TUFLOW flood modelling is shown on Image 4-3 below along
with the mitigated case 1% AEP flooding characteristics.
Image 4-3 Option 3 Flood Model Line-work and Associated 1% AEP Flood Characteristics
T
AF
R
D
J00158D1V1 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.