Flood Mitigation Investigation: Ashgrove Drive, Cooroy
5 DISCUSSION ON THE PREFERRED OPTION
5.1 Peak Flood Level Impacts
The flood mapping figures provided in the appendices of this report demonstrate that the diversion
channel is effective at diverting floodwaters away from Ashgrove Drive and is effective for events
with magnitudes of up to the 0.05% AEP event (1 in 2000 chance every year).
The peak flood level impact figures provided in Appendix D represent the overall combined impact
of the mitigation works in conjunction with the Bruce Highway Upgrade.
The only adverse offsite flood impact which is predicted to be caused by the diversion channel is
a 25mm increase in the peak 1% AEP flood level over Cooroy Creek, west of Ashgrove Drive. This
impact occurs over the Greenwood Grove development site however it is in an area that is
designated for open space / drainage reserve so it is likely that agreement could be reached with
the developer (PEET) for these impacts.
5.2 GHD and DTMR Comments
DTMR and their engineers have reviewed the results and the modelling of the preferred mitigation
option and provided a number of comments. These are listed here below along with a HWMC
response:
Table 5-1 GHD Comments and HWMC Response
DTMR / GHD Comment HWMC Response
The surface water levels are reduced in Ashgrove
Agreed
Drive
Increased water levels in Cooroy Creek do not
adversely impact any existing homes or
infrastructure. The impacts are over land owned by
The surface water levels are increased in Cooroy
a developer in areas that are to be designated as
Creek downstream of the Bruce Highway (afflux
open space / drainage reserve however Council will
increases from 10 mm to 25 mm)
need to seek permission for these impacts from the
developer (PEET) and ensure flood freeboard to
future lots will be achieved.
Considerable amount of vegetation needs to be
cleared to construct drain. Environmental impacts Council to action.
will need to be considered
There is potential to construct this drain entirely in
cut however this will mean an earthworks balance is
not achievable. Furthermore, it would no longer be
possible to direct environmental low flows along the
Drain consists of a bund on the eastern side (i.e.
existing Ashgrove Drive tributary. Due to water
drain is not all cut down below existing ground level)
T
levels in Cooroy Creek it is expected that
construction of a bund will allow a better level of
AF
flood immunity to Ashgrove Drive however a design
without a bund may still be able to provide a
significant improvement.
R
D
J00158D1V1 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.