Minor Change Existing Approval - 51901 25 01 (As Published)
4. ASSESSMENT MANAGER CONDITIONS
1. Compliance with the provisions of the rezoning deed dated 14th May, 1990 and in this regard
the following matters are noted:-
a. With respect to condition 1 of the Consent Order Headworks charges based upon May,
1990 figures are estimated as follows:
Water Supply - $15,042
Sewerage - $11,237
Total - $26,369
b. In regards to condition 3 of the approval, the contribution will be assessed by the Shire
Engineer following completion of design works.
c. With respect to condition 7 of the approval the contribution required will be assessed
following submission of design for the footpath connection to the Bottlebrush Avenue
carpark and stormwater drainage design.
2. Submission to and approval by Council of building plans in accordance with the Building Act,
Council’s By-laws and Policies, and generally in accordance with plan Nos. NC DD01/02C
and 03C and Shire of Noosa Town Planning Scheme apart from where amendments are
required or dispensations have been granted in conjunction with this approval.
3. There is to be no detrimental effect upon the amenity of neighbourhood by reason of the
creation of excessive noise, lighting nuisance or other emissions.
4. The open space and setback areas are to be landscaped in accordance with Noosa Design
Manual and a properly prepared landscaping plan to be submitted to and approved by the
Shire Planner, prior to the issue of a Building Approval. Such Landscaping is to be completed
in accordance with the approved landscaping plan, prior to the premises being occupied and
maintained at all times thereafter to the reasonable satisfaction of the Shire Planner.
5. Existing trees are to be retained, except where required to be removed due to building
operations or the conduct of the approved use. Trees across the frontage of the site located
between the proposed car park areas and the boundary of the site are generally to be
retained to the satisfaction of the Shire Planner. In this regard to the landscaping plans
referred to above are to denote areas of existing vegetation or existing trees proposed to be
retained.
6. Construction work and other associated activities are permitted only during the hours of
7.00am to 6.00pm Monday to Saturday. No work is permitted on public holidays, except
where extended hours are approved by the Building Surveyor.
7. Any advertising sign or device is to comply with the provisions of the Noosa Design Manual.
8. All lots that form part of this application are to be amalgamated in Title, prior to the issue of
a Building Approval.
9. The developer shall bear the cost of alterations of any public utility or facilities necessitated
by the development of the land or associated construction works external to the site.
10. Connection to Council’s existing water supply and sewerage reticulation systems at the
developer’s expense to the standards and requirements of Council’s Shire Engineer.
11. Provision of approved refuse containers in accordance with the requirements for the Refuse
Management Regulations of 1983 for the storage and collection of refuse to the satisfaction
for Council’s Health Surveyor.
12. Provisions of refuse chutes, in accordance with Council’s Policy for the storage of refuse in
bulk containers. Loading areas are to be located off street to the satisfaction of Council’s
Shire Engineer and Health Surveyor.
Page 2 of 7
Document Set ID: 23941513
Version: 4, Version Date: 17/07/2025