Original source · versioned page text
Appendix F - Construction Management Plan
Plans and drawings: the text below has words only, no drawings.
BUILDING WASTE
• Waste materials to be contained in a bin or enclosure prior to removal from site.
• Materials to be covered or weighed down to prevent wind spreading materials over site and
waterway.
TRAFFIC MANAGEMENT
• Minimise truck movements with good planning bulk material deliveries.
• No removal of soil required from site.
• On site parking for trades
• Spotter for trucks moving on and off site.
TREES AND VEGITATION
• Cabins located in clearings to avoid Tree and vegetation disturbance.
• Access driveways at fence line located in areas to create minimal disturbance.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.