Skip to the record
Every meeting, every word.

Original source · versioned page text

Appendix F - Construction Management Plan

of 4

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
BUILDING WASTE

•   Waste materials to be contained in a bin or enclosure prior to removal from site.
•   Materials to be covered or weighed down to prevent wind spreading materials over site and
    waterway.

TRAFFIC MANAGEMENT

•   Minimise truck movements with good planning bulk material deliveries.
•   No removal of soil required from site.
•   On site parking for trades
•   Spotter for trucks moving on and off site.

TREES AND VEGITATION

•   Cabins located in clearings to avoid Tree and vegetation disturbance.
•   Access driveways at fence line located in areas to create minimal disturbance.
Log in to download the original file

Appendix F - Construction Management Plan.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.