Acid Sulfate Management Plan · MCU16/0103
Plans and drawings: the text below has words only, no drawings.
FPE Ref: 4956-161019-1.0
on such matters to the land developer and contractor, as necessary, to ensure the likelihood of causing
environmental harm is minimised.
Regular monitoring of the project area is required on a daily basis including the ASS treatment area once
ASS material is disturbed or transported to the treatment site.
9.5.3 Maintenance
All environmental protection measures are to be operated in a proper and efficient manner and maintained
in a proper and effective condition, including undertaking checks after rainfall events that may adversely
affect their effectiveness.
9.5.4 Records
A daily log of soil excavation, treatment and relocation activities shall be kept, including locations, horizons
encountered, any observations pertinent to ASS management, stockpile dates, approximate position of
treated soil placement on site, liming actions and rates, any samples taken and tested and any other
information relevant to the treatment and handling of soils and ASS considered necessary by the suitably
qualified person.
Records shall be kept of all environmental monitoring, details of any environmental incidents and
notifications, soil testing and validation testing.
9.6 RESPONSIBLE PERSONS
9.6.1 Project Manager / Leader of Operations
The Project Manager is responsible for ensuring that the above requirements are consistently
achieved and exceeded where possible;
Ensure that the appropriate arrangements and agreements are in place for the management of
ASS material;
Ensure that the appropriate materials and resources are available to implement the requirements of
ASS management;
Modify the ASS management requirements only in consultation with the Environmental Officer or
person of appropriate authority;
Respond to any complaints received regarding ASS issues; and
Ensure the Project General Foreman maintains appropriate records for submission to the Project
Superintendent.
9.6.2 Project Site/General Foreman
Implement the controls and measures detailed above;
Amend the controls and measures as required or as directed;
Manage the disturbance of ASS;
Maintenance and checking of the ASS controls implemented on the site;
Engage an appropriately qualified person to collect and report on validation samples;
Ensure that any water discharged from the treatment site or excavations complies with ANZECC
(2000) Water Quality guidelines;
October 2016 Acid Sulfate Soil Investigation Report 22
New Duplex, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Acid Sulfate Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.