Respond to incidents and advise Project Manager of action undertaken; and
Implement strategies to mitigate future issues which may arise.
9.7 NON-CONFORMANCE AND CORRECTIVE ACTIONS
Any disturbance of ASS material not sufficiently managed may pose an environmental risk and
trigger a non-conformance;
Waters of quality that does not meet the discharge requirements must be re-treated or disposed of
to a facility that can lawfully accept and treat the waters;
Non-conformances are to be recorded by the Project / Site Foreman;
Environmental incidents are to be recorded on the Environmental Incident Register;
Full details of any environmental incidents shall be reported to the administering authority, being
the Department of Environment and Heritage Protection, including any non-compliance with water
release requirements. Any occurrences of serious or material harm must be notified under section
320 of the Environmental Protection Act 1994;
The Project Manager shall review and analyse the cause of detected non-conformance and
develop a corrective action to prevent recurrence;
Details of the non-conformance including any immediate corrective actions undertaken are to be
recorded, reviewed and accepted by the Project Manager; and
It is the responsibility of the Project Manager to immediately initiate corrective actions, if required.
The non-conformance and corrective action must include details of the action proposed and an
appropriate close out date.
9.8 REPORTING AND REVIEW
The Project Manager is to record and compile relevant reports regarding ASS and forward through
to senior management on an as directed basis. Reporting may include the volume of material
excavated, treated and reused or removed from site; and
A contractor-appointed environmental officer is required to report on validation samples and water
quality analysis on an event basis or else as required.
October 2016 Acid Sulfate Soil Investigation Report 23
New Duplex, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Acid Sulfate Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.