10.0 CONCLUSION
This ASS investigation and ASSMP is intended to ensure all works involving the disturbance of ASS onsite
as part of the construction are undertaken in such a way as to minimise any potential risks to the
environment in order to achieve effective site-based environmental management.
Groundwater was detected at 0.83m bgl during the ASS investigation, however it is understood that no
groundwater will be required to be dewatered based on the construction proposed. Should construction
design change or dewatering is required for any other reason, the dewatering methodology would need to
be developed within a dewatering plan. The Dewatering Management Plan would ensure that any
groundwater dewatered during the project is appropriately treated prior to discharge to meet water quality
objectives and minimise impact on the receiving environment.
October 2016 Acid Sulfate Soil Investigation Report 24
New Duplex, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Acid Sulfate Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.