FPE Ref: 4956-161019-1.0


10.0 CONCLUSION
This ASS investigation and ASSMP is intended to ensure all works involving the disturbance of ASS onsite
as part of the construction are undertaken in such a way as to minimise any potential risks to the
environment in order to achieve effective site-based environmental management.

Groundwater was detected at 0.83m bgl during the ASS investigation, however it is understood that no
groundwater will be required to be dewatered based on the construction proposed. Should construction
design change or dewatering is required for any other reason, the dewatering methodology would need to
be developed within a dewatering plan. The Dewatering Management Plan would ensure that any
groundwater dewatered during the project is appropriately treated prior to discharge to meet water quality
objectives and minimise impact on the receiving environment.




October 2016                        Acid Sulfate Soil Investigation Report                             24
                                          New Duplex, Noosaville

Used in these records

About this file

File size
3.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Acid Sulfate Management Plan.pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.