Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Acid Sulfate Management Plan · MCU16/0103

of 57

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
FPE Ref: 4956-161019-1.0


      9.4.4 Validation Sampling ....................................................................................................................21
   9.5 MONITORING, MAINTANCE AND RECORDS..........................................................................................21
      9.5.1 Water Monitoring ........................................................................................................................21
      9.5.2 Project Monitoring ......................................................................................................................21
      9.5.3 Maintenance................................................................................................................................22
      9.5.4 Records .......................................................................................................................................22
   9.6 RESPONSIBLE PERSONS .....................................................................................................................22
      9.6.1 Project Manager / Leader of Operations ...................................................................................22
      9.6.2 Project Site/General Foreman ....................................................................................................22
   9.7 NON-CONFORMANCE AND CORRECTIVE ACTIONS .............................................................................23
   9.8 REPORTING AND REVIEW ....................................................................................................................23
10.0 CONCLUSION ........................................................................................................................24




                                                              LIST OF FIGURES


FIGURE 1:                SITE LOCALITY PLAN

FIGURE 2:                PROPOSED SITE LAYOUT PLAN

FIGURE 3:                BOREHOLE AND SAMPLING LOCATION PLAN



                                                          LIST OF APPENDICES


APPENDIX A: SOIL PROFILE LOGS

APPENDIX B: LABORATORY RESULTS (SCR) – CARDNO BOWLER P/L

APPENDIX C: ANALYSIS REQUEST AND CHAIN OF CUSTODY, SAMPLE RECEIPT ADVICE AND ANALYSIS
RESULTS – SGS AUSTRALIA




October 2016                                         Acid Sulfate Soil Investigation Report                                                              v
                                                           New Duplex, Noosaville

Used in these records

About this file

File size
3.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Acid Sulfate Management Plan.pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.