Acid Sulfate Management Plan · MCU16/0103
Plans and drawings: the text below has words only, no drawings.
FPE Ref: 4956-161019-1.0 1.0 INTRODUCTION Future-Plus Environmental (FPE) have been engaged by Dee Williams to undertake an Acid Sulfate Soils investigation, groundwater investigation and preparation of an Acid Sulfate Soil Management Plan. The investigation relates to the proposed new duplex development at 109 Gympie Terrace, Noosaville on Lot 5 on RP79817. It is noted that the Acid Sulfate Soil Investigation is required in response to the request for further information issued by Sunshine Coast Council dated 22 September 2016. The assessments and recommendations contained in this report are based on site-specific geotechnical investigations carried out by FPE and its project team to determine the potential for Acid Sulfate Soils (ASS) to occur onsite. This report aims to determine the potential disturbance of Acid Sulfate Soils (ASS) as a result of the proposed development within the subject site and propose the required management and mitigation measures to minimise environmental risk during construction. Groundwater was encountered during the investigation, however it is understood that no dewatering will be required for construction of the proposed development. Thus a Dewatering Management Plan has not been provided. 1.1 BACKGROUND The proposed development at the site involves the construction of a new double storey residential duplex and associated facilities within an area of approximately 607m2. Based on information supplied, it is estimated that >100 cubic meters of material will be disturbed during the proposed works, with an estimated maximum depth of 1.0 meters below the existing surface level. It is understood that up to 1.765 meters of fill is to be imported to the site equating to >500m3. Developments in Queensland are subject to investigations of ASS in accordance with the State Planning Policy – state interest guideline Water Quality (Department of Infrastructure, Local Government and Planning, August 2016), when excavation of more than 100m3 of soil or sediment; or filling of land involving 500 cubic metres or more of material with an average depth of 0.5 metres or greater ‘at or below 5 metres Australian Height Datum (AHD) where natural ground level is less than 20 metres AHD’ is proposed. It is understood that the proposed development is likely to involve disturbance of >100m3 and involve filling of >500m3 on land at or below RL5.0m AHD, therefore it is necessary that an investigation in accordance with the State Planning Policy (August 2016) and the Queensland Sampling Guidelines undertaken. A Site Locality Plan is included as Figure 1 and a proposed Site Layout Plan as Figure 2. A Borehole Location Sampling Plan has been included as Figure 3. October 2016 Acid Sulfate Soil Investigation Report 1 New Duplex, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Acid Sulfate Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.