               56.    The builder, landscaper and all workers associated with the construction of the proposed
                      development shall at all times comply with the directions of the Geotechnical engineer and
                      Council officers.
               57.    Any filling works required on site shall be carried out in accordance with Section 3.8 of
                      Council’s Engineering Design Standards Manual and so as not to cause the ponding of water
                      on any adjoining lands or the blockage of, or interference with, any natural watercourses.
               58.    A Registered Professional Engineer Queensland shall certify all designs and certify that he
                      or she has supervised all engineering works and that all works have been completed in a
                      workmanlike manner in accordance with the Australian Standards and good engineering
                      practice.
               Construction Issues
               59.    A Traffic Management Plan addressing all construction phases is to be prepared by a suitably
                      qualified traffic engineer and submitted to Council for approval prior to any works
                      commencing on site.
                      The report should aim to address every foreseeable problem that is likely to occur during the
                      construction process and include recommendation on how these can be overcome or
                      minimised.
               60.    A Construction Management Plan addressing all construction phases is to be prepared and
                      submitted to Council for approval prior to any works commencing on site.
               61.    A detailed condition survey and photographic record of all adjoining properties, buildings
                      (including buildings located on the opposite side of Edgar Bennett Avenue opposite the
                      proposed development), and services, deemed appropriate by the applicants Geotechnical
                      Engineer, shall be undertaken prior to any work commencing. One copy of such survey and
                      photographic record shall be lodged with Council prior to work commencing on site.
               62.    The use of vibratory equipment of any kind is not permitted to be used, including vibrating
                      rollers, the use of vibrating installation techniques for sheet piling and other construction
                      vibrations caused by excavating, earthmoving or demolition machinery or other similar
                      construction techniques.
               Erosion and Sediment Control
               63.    Any person acting on this permit shall prevent erosion and sediment export from the site.
                      Site control measures such as silt fencing, controlled gravel access to the site and controlled
                      disposal of waste, will be necessary.
                      In this regard plans detailing the methods of controlling erosion and sediment are required
                      to be submitted to the Council for approval prior to obtaining a Development Permit for
                      Operational Works.
               64.    A contribution of $14,872 towards the provision of pedestrian lighting to the existing
                      boardwalk, that links the site with Hasting Street, shall be paid to the Council prior to obtaining
                      a Development Permit for Operational Works. This amount will be subject to variations in
                      the Consumer Price Index, All Groups Brisbane from June 2002 until the date of payment.
               65.    A contribution of $3,148 towards the cost of constructing a new boardwalk, on the west side
                      of Noosa Drive to link the site with the Lions Park, shall be paid to the Council prior to
                      obtaining a Development Permit for Operational Works. This amount will be subject to
                      variations in the Consumer Price Index, All Groups Brisbane from June 2002 until the date
                      of payment.




                                                                                                          Page 8 of 14
Document Set ID: 25012091
Version: 5, Version Date: 29/07/2026


[OCR of page images]
56. The builder, landscaper and all workers associated with the construction of the proposed
development shall at all times comply with the directions of the Geotechnical engineer and
Council officers.

57. Any filling works required on site shall be carried out in accordance with Section 3.8 of
Council’s Engineering Design Standards Manual and so as not to cause the ponding of water
on any adjoining lands or the blockage of, or interference with, any natural watercourses.

58. A Registered Professional Engineer Queensland shall certify all designs and certify that he
or she has supervised all engineering works and that all works have been completed in a
workmanlike manner in accordance with the Australian Standards and good engineering
practice.

Construction Issues

59. A Traffic Management Plan addressing all construction phases is to be prepared by a suitably
qualified traffic engineer and submitted to Council for approval prior to any works
commencing on site.

The report should aim to address every foreseeable problem that is likely to occur during the
construction process and include recommendation on how these can be overcome or
minimised.

60. A Construction Management Plan addressing all construction phases is to be prepared and
submitted to Council for approval prior to any works commencing on site.

61. A detailed condition survey and photographic record of all adjoining properties, buildings
(including buildings located on the opposite side of Edgar Bennett Avenue opposite the
proposed development), and services, deemed appropriate by the applicants Geotechnical
Engineer, shall be undertaken prior to any work commencing. One copy of such survey and
photographic record shall be lodged with Council prior to work commencing on site.

62. The use of vibratory equipment of any kind is not permitted to be used, including vibrating
rollers, the use of vibrating installation techniques for sheet piling and other construction
vibrations caused by excavating, earthmoving or demolition machinery or other similar
construction techniques.

Erosion and Sediment Control

63. Any person acting on this permit shall prevent erosion and sediment export from the site.
Site control measures such as silt fencing, controlled gravel access to the site and controlled
disposal of waste, will be necessary.

In this regard plans detailing the methods of controlling erosion and sediment are required
to be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.

64. A contribution of $14,872 towards the provision of pedestrian lighting to the existing
boardwalk, that links the site with Hasting Street, shall be paid to the Council prior to obtaining
a Development Permit for Operational Works. This amount will be subject to variations in
the Consumer Price Index, All Groups Brisbane from June 2002 until the date of payment.

65. Acontribution of $3,148 towards the cost of constructing a new boardwalk, on the west side
of Noosa Drive to link the site with the Lions Park, shall be paid to the Council prior to
obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Consumer Price Index, All Groups Brisbane from June 2002 until the date
of payment.

Page 8 of 14
Document Set ID: 25012091

Version: 5, Version Date: 29/07/2026

Log in to download the original (Minor Change Existing Approval - 132002.220212.3 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.