Headworks Contributions
66. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP 28
and PSP 30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates as of December 2003 under the current policies is as follows:
Water Supply $114,150
Sewerage $ 88,219
TOTAL $202,369
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
General
67. The applicant shall bear the cost of alteration of any public utility or other facilities
necessitated by the development of the land or associated construction works external to the
site.
68. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
69. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
70. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to
or from the site shall be covered to prevent materials including dust being windblown from
the vehicle.
71. The person acting on this permit shall apply for and obtain all other necessary permits
including crane permits, road opening permits, hoarding permits, footpath occupation permits
and/or any other approvals required under any other Act.
72. Prior to the issue of a Development Permit for Operational Works, the Applicant shall sign a
written undertaking to be responsible for the full cost of repairs to road pavement, footpath,
kerb and gutter, or other Council property damaged as a result of construction of the
proposed development.
If any Council property or facilities (such as underground drainage, water supply and
sewerage) is damaged by any person acting under a condition of this permit, through any
cause whatsoever in the course of, directly or indirectly carrying out development, that person
shall forthwith notify the Manager - Land Development and shall forthwith rectify that damage
at its cost.
Alternatively, the Applicant may request the Council to carry out the rectification works.
In all cases, Council reserves the right to carry out rectification works in an emergency and
where no reasonable attempt has been made to complete the rectification works as part of
the development.
All costs incurred by Council in any rectification works shall be repaid to Council prior to the
commencement of use allowed by this permit.
Page 9 of 14
Document Set ID: 25012091
Version: 5, Version Date: 29/07/2026
[OCR of page images]
Headworks Contributions
66.
Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP 28
and PSP 30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates as of December 2003 under the current policies is as follows:
Water Supply $114,150
Sewerage $ 88,219
TOTAL $202,369
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
General
67.
68.
69.
70.
71.
72.
The applicant shall bear the cost of alteration of any public utility or other facilities
necessitated by the development of the land or associated construction works external to the
site.
Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to
or from the site shall be covered to prevent materials including dust being windblown from
the vehicle.
The person acting on this permit shall apply for and obtain all other necessary permits
including crane permits, road opening permits, hoarding permits, footpath occupation permits
and/or any other approvals required under any other Act.
Prior to the issue of a Development Permit for Operational Works, the Applicant shall sign a
written undertaking to be responsible for the full cost of repairs to road pavement, footpath,
kerb and gutter, or other Council property damaged as a result of construction of the
proposed development.
If any Council property or facilities (such as underground drainage, water supply and
sewerage) is damaged by any person acting under a condition of this permit, through any
cause whatsoever in the course of, directly or indirectly carrying out development, that person
shall forthwith notify the Manager - Land Development and shall forthwith rectify that damage
at its cost.
Alternatively, the Applicant may request the Council to carry out the rectification works.
In all cases, Council reserves the right to carry out rectification works in an emergency and
where no reasonable attempt has been made to complete the rectification works as part of
the development.
All costs incurred by Council in any rectification works shall be repaid to Council prior to the
commencement of use allowed by this permit.
Page 9 of 14
Document Set ID: 25012091
Version: 5, Version Date: 29/07/2026