i INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkllst, Version 20, 2 April 2007
Operational work that is tidal work or |9, The application involves operational work that is: ( tick the applicable box/es)
work In Coastal rte Gui nt erie (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
| more information about prescribed tidal workin Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
local government dal areas refer to Guide 24 (1 (i) tidal work that is prescribed tidal work"! other than in a canal’? -complete Part P of Form 1:
Unless you answered “none of the above" to 09, or
the application requires assessment by the . . ,
Environmental Protection Agency (EPA). (iii) carried out within a coastal management district under the Coastal Act and for - compiste
if an agency other than EPA is the assessment Part M of Form 1 if any box/as (a) to (i) below are ticked.
Coenen agency far the aptcation ln [1] (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
relation to this matter, other than those works in tidal water) where the development has been determined not
| Local goverment is the assessment manager to be assessable against the Water Act 2000 ;
** atl prescribed tidal work. [J (b) constructing a canal intended to be connected to tidal waters;
[1 (c) constructing an artificial waterway;
(1 (d) reclaiming tand under tidal water;
(J (e) disposing of dredge spoil or other solid waste material in tidal water;
(1 (f) interfering with quarry material on State coastal land above high-water mark;
» (1 (g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(1 (hb) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
@ (1 (i) constructing a bank or bund wall to establish a ponded pasture on tand, other
than State coastal land, above high-water mark; or
| RV (v)_none of the above ee os
| Operational work below high water 10. The application involves operational work that is: ( tick the applicable boxes)
mark Oo (i .
. . , i} tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
Fi Guide 18, F : aaa
Tra tnfomaton about prosetbed ie wor in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
local government dal noeatte % Guide 24, (J (ii) tidal work that is prescribed tidal work" - compiote Part P of Form 1; or
OO, Ba epplcatn tiggers reforal ° Cj (iii) carried out within a coastal management district*S under the Coastal Act and for -
Old) as mud Trans agency. CJ (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
{ Local nt is the nit manager M of Form 1,
1 government fs assessment manag
| for all prescribed tidal work. [J (b) reclaiming land under tidal water - complete Part M of Form 1; or
(C (ec) constructing a canal, if the canal is associated with reconfiguring a lot - complete
| Part M of Form 1;
' Kl(iv) noneoftheabove, eee
, Coastal management 11. The application involves: (tick the applicable box/es)
| For more information refer to ee che C) (i) a material change of use assessable under a planning scheme involving operational
' Unless you answered “none of the above” to ‘ i ietri
tolt bs son requires assessment by he work carried out completely or partly in a coastal management district
© ! Environmental Protection Agency (EPA). CJ (ii) a material change of use assessable under a planning scheme involving building
If an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -
; manager for aaa fate apotcaton in « the construction of a new premises with a GFA'® of at least 1000m?
| relation to this matter. e the enlargement of the GFA of existing premises by more than 1000m?
\ (J (iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
| completely or partly in a coastal management district
j 1] (iv) reconfiguring a fot'? assessable under schedule 8 of the IPA and in connection with
i ‘ the construction of a canal - complete Part M of Form 1
| KI (v)_none ofthe above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed dal work is defined in the Coastal Protection and Management Regufation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tdal area.
15 Coastal management district is defined In sch 10 of the [PA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the [PA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
17 Under 117 of the Coastal Protection and Menegement Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must ba
accompanied by the application for the operational works to construct the artificial waterway.
Page 4See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015205E.001.pdfRelated documentPublic source context ↗
07/1026 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.