Skip to the record
Accept no imitations.

Council archive · source document

0015205E.001

of 43

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

2            INTEGRATED PLANNING ACT 1997                                                                                IDAS Assessment Checklist, Version 20, 2 April 2007
                 Development within the limits ofa =| 12.        Does the application involve development below high water mark'® and within the limits of a port
.               port                                             under the Transport Infrastructure Act 1994?
                 For more information refer to Guide 18. For   &) NO
                 information about prescribed tidal work refer to
                Guide 24,                                      (CJ YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
                 If you answered “YES” to Q12, the application
                 triggers referral to the Port Authority.
                 The Port Authority is a concurrence agency if the
                 development is —
                 ® within 200m of a shipping channel or an entry                    .
                    and exit shipping corridor for the port
                 © within 1000m of a swing basin, a commercial
                    shipping wharf, a mooring, anchorage or spoil
                    grounds;
                 © within 1000m of a planned port facility
                    identified in a land use plan approved under
                    the Transport infrastructure Act 1994.
                In att other situation the Port Authority is an         ’
                 advice agency.        .                                               ;    .                      a               nn                nn a,
                Marinas                                    13.   Does the application involve operational work that is tidal work for a marina’ with more than 6
                 For more information refer to Guide 18. For     vessel berths?
                 information about whether a marina is prescribed &] NO
                 tidal work refer fo Guide 24. The local                                             '
                 goverment is the assessment manager for ail               .                                           4    ,               ‘    ‘
                 prescribed lidal work.                          (DYES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
                 i you answered “YES” to Q13, the appfication
     ©           triggers referral to Queensland Fire and Rescue
                ! Service as an advice agency.     :              a nna
                 Tidal works in strategic port tand tidal} 14.   Does the application involve tidal works within a strategic port land tidal area20?
                 areas                                               NO
                 For more informaton refer to Guide 18.          1 YES - complete Part M of Form 4
                 Unless you answered “NO” to Q14, the retevant
                Port Authasity is the assessment manager for the
       ,        { application and the Environmental Protection
                ama (EPA) and Queensignd Transport (QT)
                 are concurrence agencies for the appfication.             _.                _                                                                          a
                 | Heritage                                 15.  Does the application involve development in a heritage registered place as defined under the
                 For further information refer to Guide 19,      Queensland Heritage Act 1992?
                 It you answered "YES" to Q15, the appfication
    .            triggers referral to the Queensland Heritage    KINO
                 Council as concurrence agency for the           (J YES - comptete Part C of Form 1
                 application.
            ,                                               pen application involves: (tick applicable boxes)
                  ISD be appiiaton volves retoreal ote              ()     amaterial change of use assessable against the planning scheme and the lot shares a
                             swered ‘none of th    ,                               :                                    .              .
                Environmental Protection Agency as an advice               common boundary with a protected area or registered place under the Queensland
                 agency for the application                                Heritage Act 1992;
                                                                (J (ii)    reconfiguring a lot if the lot shares a common boundary with a protected area or
    ©                                                                      registered place under the Queensland Heritage Act 1992:
                                                      ;         [X] (ii)   noneofthe above.         ,

                 Declared catchment areas                   16.  The application is in an area declared to be a catchment area under the Water Act 2000 and
                 For more information, including alistofthe =    involves: (tick the applicable box/es)
                 refer  oui    a. areas wihin Gueensing          CI {i)    reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares; °
                 Uniess you answered ‘none of the above" to      (1 (ii)   development assessable against the planning scheme involving the establishment or
                 Q16, the application requires assessment by the           expansion of a waste water disposal system, other than a disposal system for carrying
                 (NRW).                                                    out an environmentally relevant activity under the Environmental Protection Act 1994;
                If an agency other than NRW is the assessment    KK] (ii)  none of the above
                 manager for the application, NRW is a
                + concurrence agency for the apptication in
                | relation to this matter.                 a nee                                ana       e

        : .      18 High water mark is defined in the Coastal Protection end Management Act 1995 and means the ordinary high water mark at spring Ude.
        4        19. Marina is definad in the Trensport Operations (Maritime Pottution) Regulation 1995.
                 20 Strategic port land tidal areas are the areas generally 50 matres seaward of high water mark adjacent to strategic port land.
   s                                                                                             Page §

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015205E.001.pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.